Tender For For Construction Of 0.5 Km Approx Sarojini Nagar 400 Hardoi Road 220 Lilo Transmission Line For 220Kv Substation Mohan Road Under Etd I Lucknow
Tender Value
Ref. Documents
Estimated cost
Bid Submission
20 Aug 2026
19 days left
EMD
1.70 Lakhs
Bank guarantee accepted
Document Fee
1770
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Lucknow → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for For Construction Of 0.5 Km Approx Sarojini Nagar 400 Hardoi Road 220 Lilo Transmission Line For 220Kv Substation Mohan Road Under Etd I Lucknow
BOQ
| Sl. No. | Item Description |
| 1 | SUPPLY |
| 2 | TOWER ACCESSORIES |
| 3 | Number Plate |
| 4 | Danger Plate |
| 5 | Phase Plate in sets of red, blue and yellow for Tension towers |
| 6 | Bird Guard for towers |
| 7 | Pipe type earthing material for towers |
| 8 | Circuit Plate (Set of Two) |
| 9 | Counterpoise grounding materials for towers including cost of all material |
| 10 | INSULATOR |
| 11 | 160 KN polymer Insulator |
| 12 | 160 KN Porcelain Disc Insulator |
| 13 | 70 KN Porcelain Disc Insulator |
| 14 | HARDWARES SUITABLE FOR ACSR ZEBRA |
| 15 | Single suspension fittings |
| 16 | Single Tension fittings |
| 17 | Double Tension fittings |
| 18 | Double Suspension fittings |
| 19 | CONDUCTOR ACCESSORIES SUITABLE FOR ACSR ZEBRA |
| 20 | Vibration Dampers |
| 21 | Mid Span compression Joint |
| 22 | Repair sleeves |
| 23 | Performed Armour Rod |
| 24 | OPGW (48 F) |
| 25 | Supply of Hardware Set for 48 Fibre (DWSM) OPGW |
| 26 | OPGW (24 F) |
| 27 | Supply of Hardware Set for 24 Fibre OPGW |
| 28 | Fibre Optic Approch Cable for 48F OPGW |
| 29 | Supply of Hardware Set for 48 Fibre Optic Approach Cable |
| 30 | Fibre Optic Approch Cable for 24F OPGW |
| 31 | Supply of Hardware Set for 24 Fibre Optic Approach Cable |
| 32 | FODP 96F |
| 33 | FODP 48F |
| 34 | Joint Box(48 Fiber) |
| 35 | Joint Box(24 Fiber) |
| 36 | Item/ Equipments along with all accessories as per specifications |
| 37 | 220 kV TRANSMISSION LINES WORKS |
| 38 | Survey including preparation of schedule of materials, marking of locations (Route length),GPS Survey of line with co-ordinates of each tower(The length of line shall be authenticated by GPS Survey) |
| 39 | Check survey |
| 40 | Soil Testing |
| 41 | Cost of excavation of 220 KV tower foundation pits including all earth work,backfilling, levelling etc. |
| 42 | Setting of stubs including all foundation work but excluding the cost of concerting and excavation (Rate per location) for following towers : |
| 43 | 220 KV DC/DE |
| 44 | Cost of concreting for all types of tower foundation including cost of cement,dewatering,shoring and shuttering,forming,curing but excluding cost of reinforcement bars |
| 45 | 1:1.5:3 concreting |
| 46 | Erection of Superstructure |
| 47 | Erection of Superstructure of 220 KV Towers and Anchor tower and their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories, but including fitting of danger number, phase plates, bird guard and fixing & punching for 220KV SC/DC lines |
| 48 | Tack welding of all the bolts up to the height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200seperatiion of minimum 10 mm thickness with 10mm/12 mm electrode & application of Zinc rich Aluminium paint on the affected surface including cost of all material including tack welding of River Crossing tower & Anchor towers. |
| 49 | Stringing Work |
| 50 | Laying, stringing, tensioning clamping, jointing etc of ACSR ‘Zebra’ conductor including hoisting of insulators , fitting of all necessary hardware and accessories i.e. fittings Armour rods, vibration dampers etc.on all Six phases of 220 KV lines |
| 51 | Laying, stringing, tensioning, clamping, jointing,including fittings of all necessary Hardware and accessories of OPGW & OFAC, installation of FODP termaination at S/s, end to end connectivity & testing etc on 220 KV lines |
| 52 | Grounding Work |
| 53 | Grounding work including earth work etc for pipe type grounding including cost of coke & salt. |
| 54 | Grounding work including earthwork etc for counterpoise grounding materials including cost of all material |
| 55 | Installation of steel reinforcement bars in R.C.C. foundation including cost of steel reinforcement bars with cutting, bending, placing, binding etc. |
| 56 | Dismantling of existing Earthwire necessary Hardware re-rolling of earth wire on empty drum of OPGW & safely Transportation of all removed materials to UPPTCL store etc. |
| 57 | Dismantling of existing 220kV Sarojini Nagar - Hardoi Rd Line for 3 phase Zebra conductor Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 25, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 20, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysAug 21, 2026
Bid Opening Date
Technical bids will be opened and evaluated.