Tender For Operation And Maintenance Of Community Water Purification Plant (Cwpp-25 Nos.) Including Troubleshooting And Supply Of Consumables With Engagement Of Operator Cum Electrical Supervisor (2 Nos.) In Different Blocks Of Uttar Dinajpur Distric
Tender Overview
Project Description
Tender for Operation And Maintenance Of Community Water Purification Plant (Cwpp-25 Nos.) Including Troubleshooting And Supply Of Consumables With Engagement Of Operator Cum Electrical Supervisor (2 Nos.) In Different Blocks Of Uttar Dinajpur District Under Raiganj Division, Phe Dte. (For 12 Months)
BOQ
| Sl. No. | Item Description |
| 1 | Operation and Maintennace of Community Water Supply Unit and water treatment unit` & petty repair of all sluice valve etc. without cost of major parts/materials as per specification and direction of EICNo Of Supervisors/Labour/Operator/Technician =2 Nos.,for 25 Nos CPP Units.Total mandays = 2x365=730 days. |
| 2 | Cost of all the related consumable materials/chemicals/reagnets/transportation charge (oil, fuse wire, wire, oil seal, gland packing, Solar Pannel and others Solar pannel accessories, UV filter membrem or other filter membrem /accessories etc.) material should be used as per I.S and as per direction of E.I.C Payment will be made as per actual on the basis of supporting vouchers/Bills (Contractors profit, GST and labour welfare cess will be applicable) |
| 3 | No Of Supervisors/Labour/Operator/Technician/Plumbers =2 Nos. Among of them,1 no Supervisor/Operator/Technician will cover 13 Nos CPP units & another one will cover 12 nos Community water Supply Units. |
| 4 | Note:- 1)LLabour Charges for operation and guarding of Pump/Valve/Disinfection arrangement with all accessories - Basic wages-Rs.487.00(1) Add bonus @ 8.33%-Rs.40.57Total-Rs.527.57(2) Add 5% over head charge on(1) -Rs.24.35 Add 10 % contractor's profit on(2)-Rs.52.76 Total-Rs.604.67Add:ESIC Contribution of [email protected]%[On Sl.1]-Rs.15.83 Add:EPF Contribution of Employer @13.00%[On Sl.1]-Rs.63.31Grand Total-Rs.683.81ESIC Contribution of Employee @.75%[On Sl.1]-Rs.3.65 and EPF Contribution of Employee @12.00%[On Sl.1]-Rs.58.44 Total=Rs.62.09 |
| 5 | 2) Daily Log Boook to be maintained for operation & maintenance of Community Water Purification Plant(CWPP) and to be submitted to the E.I.C. 7th of each month duly signed by the agency. |
| 6 | Add GST @ 18% |
| 7 | Add Labour Welfare Cess @ 1% on amount of Sl. No.1 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 20 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender