Housing Urban and Rular Development Local Bodies Closing in 27 days TDR #56649567

Tender For Installation Of Chlorination Unit In 7 Nos Rejuvenated Stps At North 24 Parganas ,West Bengal Along With 05 (Five) Year Operation And Maintenance Period Under Namami Gange Mission - Ii.

Issued by Local Bodies · 24 Paraganas North, West Bengal
Tender Value
Ref. Documents
Estimated cost
Bid Submission
25 Aug 2026
27 days left
EMD
1.57 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
24 Paraganas North → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Installation Of Chlorination Unit In 7 Nos Rejuvenated Stps At North 24 Parganas ,West Bengal Along With 05 (Five) Year Operation And Maintenance Period Under Namami Gange Mission - Ii.

BOQ

Name of Work:- Installation of Chlorination unit in 7 Nos Rejuvenated STPs at North 24 Parganas ,West Bengal along with 05 (Five) year Operation and Maintenance Period under Namami Gange Mission – II.
Sl. No. Item Description
1Disinfection Module (Part A) Construction of Chlorination Unit for 7 Nos Rejuvenated STPs[Naihati STP(ASP) 11.56 MLD, Naihati STP (WSP) 6.50MLD, Garulia STP (WSP) 4.10 MLD, Titagarh STP(ASP) 4.54 MLD, Titagarh STP (OP) 4.54 MLD, Bandipur STP(WSP) 14.00 MLD ,Panihati STP(WSP) 12.00 MLD] at North 24 Parganas , West Bengal
2(1) (a) Civil WorkConstruction & Installation with survey , soil exploration and all Design, & Drawing and same as Vetted from a Reputed Govt. Institution ,as decided by KMDA, for Chlorine Contact Tank (CCT) , Chlorination Room and all allied works related with Disinfection Modules for rejuvenation of Naihati STP(ASP) 11.56 MLD .
3(b) Civil WorkConstruction & Installation with survey , soil exploration and all Design, & Drawing and same as Vetted from a Reputed Govt. Institution ,as decided by KMDA, for Chlorine Contact Tank (CCT) , Chlorination Room,Labour Room and all allied works related with Disinfection Modules for rejuvenation of Naihati STP (WSP) 6.50MLD.
4(C) Civil WorkConstruction & Installation with survey , soil exploration and all Design, & Drawing and same as Vetted from a Reputed Govt. Institution ,as decided by KMDA, for Chlorine Contact Tank (CCT) , Chlorination Room,Labour Room and all allied works related with Disinfection Modules for rejuvenation of Garulia STP (WSP) 4.10 MLD.
5(D) Civil WorkConstruction & Installation with survey , soil exploration and all Design, & Drawing and same as Vetted from a Reputed Govt. Institution ,as decided by KMDA, for Chlorine Contact Tank (CCT) , Chlorination Room,Labour Room and all allied works related with Disinfection Modules for rejuvenation of Titagarh STP(ASP) 4.54 MLD.
6(E) Civil WorkConstruction & Installation with survey , soil exploration and all Design, & Drawing and same as Vetted from a Reputed Govt. Institution ,as decided by KMDA, for Chlorine Contact Tank (CCT) , Chlorination Room,Labour Room and all allied works related with Disinfection Modules for rejuvenation of Titagarh STP (OP) 4.54 MLD.
7(F) Civil WorkConstruction & Installation with survey , soil exploration and all Design, & Drawing and same as Vetted from a Reputed Govt. Institution ,as decided by KMDA, for Chlorine Contact Tank (CCT) , Chlorination Room,Labour Room and all allied works related with Disinfection Modules for rejuvenation of Bandipur STP(WSP) 14.00 MLD
8(G) Civil WorkConstruction & Installation with survey , soil exploration and all Design, & Drawing and same as Vetted from a Reputed Govt. Institution ,as decided by KMDA, for Chlorine Contact Tank (CCT) , Chlorination Room,Labour Room and all allied works related with Disinfection Modules for rejuvenation of Panihati STP(WSP) 12.00 MLD
92) (a) Electro-mechanical Work: Supplying, installation, testing of all Electro- Mechenical and instrumentation equipments and accessory works for Chlorination units as per approved and vetted design and drawing based on Hydraulic design of rejuvenated work for Naihati STP(ASP) 11.56 MLD .
10(b) Electro-mechanical Work:Supplying, installation, testing of all Electro- Mechenical and instrumentation equipments and accessory worksfor Chlorination units as per approved and vetted design and drawing based on Hydraulic design of rejuvenated work for Naihati STP (WSP) 6.50MLD.
11(c) Electro-mechanical Work:Supplying, installation, testing of all Electro- Mechenical and instrumentation equipments and accessory worksfor Chlorination units as per approved and vetted design and drawing based on Hydraulic design of rejuvenated work for Garulia STP (WSP) 4.10 MLD.
12(d) Electro-mechanical Work:Supplying, installation, testing of all Electro- Mechenical and instrumentation equipments and accessory worksfor Chlorination units as per approved and vetted design and drawing based on Hydraulic design of rejuvenated work for Titagarh STP(ASP) 4.54 MLD.
13(e) Electro-mechanical Work:Supplying, installation, testing of all Electro- Mechenical and instrumentation equipments and accessory worksfor Chlorination units as per approved and vetted design and drawing based on Hydraulic design of rejuvenated work for Titagarh STP (OP) 4.54 MLD.
14(f) Electro-mechanical Work:Supplying, installation, testing of all Electro- Mechenical and instrumentation equipments and accessory worksfor Chlorination units as per approved and vetted design and drawing based on Hydraulic design of rejuvenated work for Bandipur STP(WSP) 14.00 MLD.
15(g) Electro-mechanical Work:Supplying, installation, testing of all Electro- Mechenical and instrumentation equipments and accessory worksfor Chlorination units as per approved and vetted design and drawing based on Hydraulic design of rejuvenated work for Panihati STP(WSP) 12.00 MLD
16Disinfection Module (Part B)Operation and Maintenance (Non-Power) of Chlorination units include (Manpower cost , All Material & Chemicals cost , Repairs and Replacement for both, all the Civil and E&M work cost , all necessary consumables cost etc.) for treatment up to Threshold Flow ( for Naihati STP(ASP) 11.56 MLD = 9 MLD, Naihati STP (WSP) 6.50MLD = 5 MLD , Garulia STP (WSP) 4.10 MLD = 3 MLD, Titagarh STP(ASP) 4.50 MLD = 3.3, Titagarh STP (OP) 4.50 MLD = 3.7, Bandipur STP(WSP) 14.00 MLD = 11 MLD ,Panihati STP(WSP) 12.00 MLD = 10 MLD) for 05 years, excluding GST.
171st year
182nd year
193rd year
204th year
215th year
22Disinfection Module (Part C )Additional Operation and Maintenance (Non-Power) of Chlorination units include (Manpower cost , All Material & Chemicals cost , Repairs and Replacement for both all the Civil and E&M work cost , all necessary consumables cost etc.) for treatment of beyond Threshold Flow ( for Naihati STP(ASP) 11.56 MLD = 9 MLD, Naihati STP (WSP) 6.50MLD = 5 MLD , Garulia STP (WSP) 4.10 MLD = 3 MLD, Titagarh STP(ASP) 4.50 MLD = 3.3, Titagarh STP (OP) 4.50 MLD = 3.7, Bandipur STP(WSP) 14.00 MLD = 11 MLD ,Panihati STP(WSP) 12.00 MLD = 10 MLD) for 05 years, excluding GST.
231st year
242nd year
253rd year
264th year
275th year
28Total O&M Prices (Non-Power) for the indicative fecal sewage volume treatment (assuming \\"Indicative Sewage Volume\\" reaching the STP) = Part B + Part C *X*365 (X and Y= Indicative Fecal Sewage Volume - Threshold Fecal Sewage Volume; 365 days STP operation per year for respective STPs)
291st year for Naihati STP(ASP) 11.56 MLD (A=9.00-9.00=0 MLD), Naihati STP (WSP) 6.50MLD (B=5.00-5.00=0 MLD) , Garulia STP (WSP) 4.10 MLD (C=3.00-3.00=0 MLD), Titagarh STP(ASP) 4.50 MLD ( D=3.30-3.30=0 MLD), Titagarh STP (OP) 4.50 MLD (E=3.70-3.70=0MLD), Bandipur STP(WSP) 14.00 MLD (F=11.00-11.00=0 MLD) ,Panihati STP(WSP) 12.00 MLD( G=10.00-10.00=0 MLD)
302nd year for Naihati STP(ASP) 11.56 MLD (A=9.50-9.00=0.50 MLD), Naihati STP (WSP) 6.50MLD (B=5.30-5.00=0.30 MLD) , Garulia STP (WSP) 4.10 MLD (C=3.22-3.00=0.22 MLD), Titagarh STP(ASP) 4.50 MLD (D= 3.60-3.30=0.30 MLD), Titagarh STP (OP) 4.50 MLD (E=3.90-3.70=0.20 MLD), Bandipur STP(WSP) 14.00 MLD (F=11.60-11.00=0.60 MLD) ,Panihati STP(WSP) 12.00 MLD( G=10.40-10.00=0.40 MLD)
313rd year for Naihati STP(ASP) 11.56 MLD (A=10.00-9.00=1.00 MLD), Naihati STP (WSP) 6.50MLD (B=5.60-5.00=0.60 MLD) , Garulia STP (WSP) 4.10 MLD (C=3.44-3.00=0.44 MLD), Titagarh STP(ASP) 4.50 MLD ( D=3.90-3.30=0.60 MLD), Titagarh STP (OP) 4.50 MLD (E=4.10-3.70=0.40 MLD), Bandipur STP(WSP) 14.00 MLD (F=12.20-11.00=1.20 MLD) ,Panihati STP(WSP) 12.00 MLD( G=10.80-10.00=0.80 MLD)
324th year for Naihati STP(ASP) 11.56 MLD (A=10.50-9.00=1.50 MLD), Naihati STP (WSP) 6.50MLD (B=5.90-5.00=0.90 MLD) , Garulia STP (WSP) 4.10 MLD (C=3.66-3.00=0.66 MLD), Titagarh STP(ASP) 4.50 MLD ( D=4.20-3.30=0.90 MLD), Titagarh STP (OP) 4.50 MLD (E=4.30-3.70=0.60 MLD), Bandipur STP(WSP) 14.00 MLD (F=12.80-11.00=1.80 MLD) ,Panihati STP(WSP) 12.00 MLD( G=11.20-10.00=1.20 MLD)
335th year for Naihati STP(ASP) 11.56 MLD (A=11.56-9.00= 1.56 MLD), Naihati STP (WSP) 6.50MLD (B=6.50-5.00=1.50 MLD) , Garulia STP (WSP) 4.10 MLD (C=4.10-3.00=1.10 MLD), Titagarh STP(ASP) 4.50 MLD ( D=4.50-3.30=1.20 MLD), Titagarh STP (OP) 4.50 MLD (E=4.50-3.70=0.80 MLD), Bandipur STP(WSP) 14.00 MLD (F=14.00-11.00=3.00 MLD) ,Panihati STP(WSP) 12.00 MLD( G=12.00-10.00=2.00 MLD)
34NPV of total O&M Prices
351st year (NPV Factor = 0.909)
362nd year (NPV Factor = 0.826)
373rd year (NPV Factor = 0.751)
384th year (NPV Factor = 0.683)
395th year (NPV Factor = 0.621)
40Guaranteed Energy Consumption for Chlorination Unit for Naihati STP(ASP) 11.56 MLD 5 years (Value must be entered for rows at S. No. 6.01 and 6.02 )NB:-This price of the Guaranteed energy cost to be considered only for evaluation of bid. However the energy consumption cost is to be reimbursed on actual basis after submitting the payment receipt of electricity bill, subject to celing of Guaranteed energy consumption and the extra cost behind the guaranteed energy will be borne by the bidder
41For Flow Upto 9.00 MLD
42For Flow >9.00 MLD
43Average GEC
44Power Charges for Chlorination units for Naihati STP(ASP) 11.56 MLD for Indicative Flow (= Sum of indicative flows in MLD X Units Consumed/MLD X 365 X 8.55) (Not to be filled by the Bidder)
45Guaranteed Energy Consumption for Chlorination units Naihati STP (WSP) 6.50MLD for 5 years (Value must be entered for rows at S. No. 7.01 and 7.02 ) ,NB:-This price of the Guaranteed energy cost to be considered only for evaluation of bid. However the energy consumption cost is to be reimbursed on actual basis after submitting the payment receipt of electricity bill, subject to celing of Guaranteed energy consumption and the extra cost behind the guaranteed energy will be borne by the bidder
46For Flow Upto 5.00 MLD
47For Flow >5.00MLD
48Average GEC
49Power Charges for Chlorination units for Naihati STP (WSP) 6.50MLD for Indicative Flow (= Sum of indicative flows in MLD X Units Consumed/MLD X 365 X 8.55) (Not to be filled by the Bidder)
50Guaranteed Energy Consumption for Chlorination units of Garulia STP (WSP) 4.10 MLD. for 5 years (Value must be entered for rows at S. No. 8.01 and 8.02 ) ,NB:-This price of the Guaranteed energy cost to be considered only for evaluation of bid. However the energy consumption cost is to be reimbursed on actual basis after submitting the payment receipt of electricity bill, subject to celing of Guaranteed energy consumption and the extra cost behind the guaranteed energy will be borne by the bidder
51For Flow Upto 3.00 MLD
52For Flow >3.00MLD
53Average GEC
54Power Charges for Chlorination units for Garulia STP (WSP) 4.10 MLD. for Indicative Flow (= Sum of indicative flows in MLD X Units Consumed/MLD X 365 X 8.55) (Not to be filled by the Bidder)
55Guaranteed Energy Consumption for Chlorination units of Titagarh STP(ASP) 4.50 MLD. for 5 years (Value must be entered for rows at S. No. 9.01 and 9.02 ) ,NB:-This price of the Guaranteed energy cost to be considered only for evaluation of bid. However the energy consumption cost is to be reimbursed on actual basis after submitting the payment receipt of electricity bill, subject to celing of Guaranteed energy consumption and the extra cost behind the guaranteed energy will be borne by the bidder.
56For Flow Upto 3.30 MLD
57For Flow >3.30MLD
58Average GEC
59Power Charges for Chlorination units for Titagarh STP(ASP) 4.50 MLD for Indicative Flow (= Sum of indicative flows in MLD X Units Consumed/MLD X 365 X 8.55) (Not to be filled by the Bidder)
60Guaranteed Energy Consumption for Chlorination units of Titagarh STP (OP) 4.50 MLD. for 5 years (Value must be entered for rows at S. No. 10.01 and 10.02 ) ,NB:-This price of the Guaranteed energy cost to be considered only for evaluation of bid. However the energy consumption cost is to be reimbursed on actual basis after submitting the payment receipt of electricity bill, subject to celing of Guaranteed energy consumption and the extra cost behind the guaranteed energy will be borne by the bidder.
61For Flow Upto 3.70 MLD
62For Flow >3.70MLD
63Average GEC
64Power Charges for Chlorination units for Titagarh STP (OP) 4.50 MLD for Indicative Flow (= Sum of indicative flows in MLD X Units Consumed/MLD X 365 X 8.55) (Not to be filled by the Bidder)
65Guaranteed Energy Consumption for Chlorination units of Bandipur STP(WSP) 14.10 MLD for 5 years (Value must be entered for rows at S. No. 11.01 and 11.02 ) ,NB:-This price of the Guaranteed energy cost to be considered only for evaluation of bid. However the energy consumption cost is to be reimbursed on actual basis after submitting the payment receipt of electricity bill, subject to celing of Guaranteed energy consumption and the extra cost behind the guaranteed energy will be borne by the bidder.
66For Flow Upto 11.00 MLD
67For Flow >11.00MLD
68Average GEC
69Power Charges for Chlorination units for Bandipur STP(WSP) 14.10 MLD for Indicative Flow (= Sum of indicative flows in MLD X Units Consumed/MLD X 365 X 8.55) (Not to be filled by the Bidder)
70Guaranteed Energy Consumption for Chlorination units of Panihati STP(WSP) 12.00 MLD for 5 years (Value must be entered for rows at S. No. 12.01 and 12.02 ) ,NB:-This price of the Guaranteed energy cost to be considered only for evaluation of bid. However the energy consumption cost is to be reimbursed on actual basis after submitting the payment receipt of electricity bill, subject to celing of Guaranteed energy consumption and the extra cost behind the guaranteed energy will be borne by the bidder.
71For Flow Upto 10.00 MLD
72For Flow >10.00MLD
73Average GEC
74Power Charges for Chlorination units for Panihati STP(WSP) 12.00 MLD for Indicative Flow (= Sum of indicative flows in MLD X Units Consumed/MLD X 365 X 8.55) (Not to be filled by the Bidder)
75Total Evaluated Bid Price (based on NPV of O&M prices ), excluding GST - For Financial Bid Evaluation
76Total Contract Cost (based on actual quoted O&M prices), excluding GST
77Total Contract Cost (based on actual quoted O&M prices ), including GST 18% Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56649567
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 25-08-2026
Authority
Authority Name Kolkata Metropolitan Development Authority
Work Description Tender for Installation Of Chlorination Unit In 7 Nos Rejuvenated Stps At North 24 Parganas ,West Bengal Along With 05 (Five) Year Operation And Maintenance Period Under Namami Gange Mission - Ii.
Basic Detail
Tender No KMDA/WS/GAP/SE(N)/NIT-02/26-27 Sl No 03
Bidding Type Tender
Location
City 24 Paraganas North
State West Bengal
Key Dates
Publish Date 24 Jul 2026
Submission Date 25 Aug 2026
Open Date 27 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 1.57 Lakhs
Exemption Not Available
Document List
BD.pdf
BOQ_2539628.xls
ddb98024-383c-42d8-a24c-a0869a74939d.html
Form1.pdf
SCOPE.pdf
Tendernotice_1 (16).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 24, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 25, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 27 days
Aug 27, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 29 days

Tender Documents

Download All (ZIP) ↓
pdf

BD.pdf

xls

BOQ_2539628.xls

html

ddb98024-383c-42d8-a24c-a0869a74939d.html

pdf

Form1.pdf

pdf

SCOPE.pdf

pdf

Tendernotice_1 (16).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders