Tender For Installation Of Chlorination Unit In Rejuvenated Stp (22 Mld Stp , Wsp Type) At Kanaipur Stp,Hooghly District, West Bengal Along With 05 (Five) Year Operation And Maintenance Period Under Namami Gange Mission - Ii
Tender Overview
Project Description
Tender for Installation Of Chlorination Unit In Rejuvenated Stp (22 Mld Stp , Wsp Type) At Kanaipur Stp,Hooghly District, West Bengal Along With 05 (Five) Year Operation And Maintenance Period Under Namami Gange Mission - Ii
BOQ
| Sl. No. | Item Description |
| 1 | Disinfection Module (Part A) Installation of Chlorination unit in Rejuvenated (22 MLD STP , WSP Type) at Kanaipur STP,Hooghly District, West Bengal |
| 2 | (1) (a) Civil WorkConstruction & Installation with survey , soil exploration and all Design, & Drawing and same as Vetted from a Reputed Govt. Institution ,as decided by KMDA, for Labour Room, Installation of deep tube well ,Chlorination Room and all allied works related with Disinfection Modules for rejuvenation of 22.00 MLD Waste Stabilization Pond (WSP) |
| 3 | 2) (a) Electro-mechanical Work: Supplying, installation, testing of all Electro- Mechenical and instrumentation equipments and accessory works for Chlorination units as per approved and vetted design and drawing based on Hydraulic design of rejuvenated work for 22.00 MLD Waste Stabilization Pond (WSP) . |
| 4 | Disinfection Module (Part B)Operation and Maintenance (Non-Power) of Chlorination units include (Manpower cost , All Material & Chemicals cost , Repairs and Replacement for both, all the Civil and E&M work cost , all necessary consumables cost etc.) for treatment upto Threshold Flow ( For 22 MLD WSP=12.05 MLD ) at 10 MLD STP for 05 years, excluding GST. |
| 5 | 1st year |
| 6 | 2nd year |
| 7 | 3rd year |
| 8 | 4th year |
| 9 | 5th year |
| 10 | Disinfection Module (Part C )Additional Operation and Maintenance(Non-Power) of Chlorination units include (Manpower cost , All Material & Chemicals cost , Repairs and Replacement for both all the Civil and E&M work cost , all necessary consumables cost etc.) for treatment beyond Threshold Flow ( For 22 MLD WSP=12.05 MLD ) at 22 MLD STP for 05 years, excluding GST. |
| 11 | 1st year |
| 12 | 2nd year |
| 13 | 3rd year |
| 14 | 4th year |
| 15 | 5th year |
| 16 | Total O&M Prices for the indicative fecal sewage volume treatment (assuming \\"Indicative Sewage Volume\\" reaching the STP) = Part B + Part C *X*365 (X and Y= Indicative Fecal Sewage Volume - Threshold Fecal Sewage Volume; 365 days STP operation per year for respective STPs) |
| 17 | 1st year for 22 MLDWSP (X = 12.05-12.05=0) |
| 18 | 2nd year for 22 MLD WSP (X = 15.12-12.05=3.07) |
| 19 | 3rd year for 22 MLD WSP (X = 16.00-12.05=3.95) |
| 20 | 4th year for 10MLD WSP (X = 17.09-12.05=5.04) |
| 21 | 5th year for 10MLD WSP (X = 20.50-12.05=8.45) |
| 22 | NPV of total O&M Prices |
| 23 | 1st year (NPV Factor = 0.909) |
| 24 | 2nd year (NPV Factor = 0.826) |
| 25 | 3rd year (NPV Factor = 0.751) |
| 26 | 4th year (NPV Factor = 0.683) |
| 27 | 5th year (NPV Factor = 0.621) |
| 28 | Guaranteed Energy Consumption for Chlorination at Rejuvenated (22 MLD STP , WSP Type) at Kanaipur STP,Hooghly District, West Bengal for 5 years (Value must be entered for rows at S. No. 6.01 and 6.02 )NB:-This price of the Guaranteed energy cost to be considered only for evaluation of bid. However the energy consumption cost is to be reimbursed on actual basis after submitting the payment receipt of electricity bill, subject to celing of Guaranteed energy consumption and the extra cost behind the guaranteed energy will be borne by the bidder. |
| 29 | For Flow Upto 12.05 MLD |
| 30 | For Flow >12.05 MLD |
| 31 | Average GEC |
| 32 | Power Charges for Chlorination units for at Rejuvenated (22 MLD STP , WSP Type) at Kanaipur STP,Hooghly District, West Bengal per year for Indicative Flow (= Sum of indicative flows in MLD X Units Consumed/MLD X 365 X 8.55) (Not to be filled by the Bidder) |
| 33 | Total Evaluated Bid Price (based on NPV of O&M prices ), excluding GST - For Financial Bid Evaluation |
| 34 | Total Contract Cost (based on actual quoted O&M prices), excluding GST |
| 35 | Total Contract Cost (based on actual quoted O&M prices ), including GST 18% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 30 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 32 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender