Housing Urban and Rular Development Government Departments Closing in 5 days TDR #56642951

Tender For Construction Of New Administrative Building At Kvk Semiliguda District Koraput

Issued by Government Departments · Koraput, Odisha
Tender Value
1.80 Crore
Estimated cost
Bid Submission
07 Aug 2026
5 days left
EMD
1.81 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Koraput → Odisha
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Construction Of New Administrative Building At Kvk Semiliguda District Koraput

BOQ

Name of Work:- Construction of New Administrative Building at KVK Semiliguda District Koraput
Sl. No. Item Description
1CIVIL WORKS Earth work in excavation of foundation of structures in all types of soil as per drawing and technical specification, including setting out, shoring, strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom to required level and line, backfilling the excavated earth to the extent required including compaction and utilising the remaining earth locally for road work including all Cost, Conveyance, royalties of all materials, labour, T and P, cess and machinaries required for the work etc. complete as per direction of the Engineer-In-Charge. (Ground Floor)
2Supplying filling in foundation trenches and plinth with sand 23.5 cm (9 ) thick layers including watering ramming etc.,complete including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Measurement will be taken on finished compacted section only). (Ground Floor)
3Excavation loading , unloading and carriage by mechnical means of all kinds of soil including stoney earth, gravel and moorum etc., with all lifts and lead cuting and ladoing in tippers including trimming of stopes and bed to design section and deposting the excavated materials away from work site as per the specification and direction of Engineer-in-Charge. (Ground Floor)
4Supplying and filling in foundation and plinth with sand including watering ramming, complete with all leads and lifts including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground Floor)
5Supplying, diluting and preparing chemical emulsion like Imidacloprid 30.5 percentage SC or other chemicals approved by Central Insecticides Board or as directed by the manufacturer and spraying the mixture uniformly by sprayer as Pre-Constructional Anti-termite Treatment confirming to IS 6313 (Part-II) and creating a chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of walls and floors along with external perimeter of the building, expansion joints, surrounding the pipes and conduits etc at the rate of 7.5 liters per sqm on vertical surface and 5.0 liters per sqm on horizontal surfaces, 50 percentage of the emulsion to be filled in the holes made in trenches at 150mm center to center (or as directed by the manufacturer) including the cost of all materials, cost of all labour, conveyance, loading, unloading, T and P, etc all complete as per the direction of Engineer-in-Charge. (The payment shall be made on the basis of actual plinth area of the building at (Ground floor)
6Plain Cement concrete of proportion (1:3:6) using 40mm size C.B.H.G. metal of approved quality from approved quarry including hoisting, lowering and laying in layers not exceeding 15cm thick to the required; ramming, watering and curing etc., complete including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground Floor)
7R.C.C. work in M-20 using 20mm using size CB chips of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering and curing for four weeks, centering, shuttering and finishing exposed surface smooth including all cost, conveyance, cess and royalities, of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge (a) Raft, Column, Pedastal, Footing etc.
8Plinth Beam (Ground floor)
9Column superstructure (Ground floor)
10First floor
11Terrace
12Roof beam (Ground floor)
13First floor
14Terrace
15Roof slab (Ground floor)
16First floor
17Terrace
18RCC Chajja (Ground floor)
19First floor
20Terrace
21Lintel (Ground floor)
22First floor
23Terrace
24Staircase (Ground floor)
25First floor
26Straightening bent up or coiled rods cutting, bending, craking, hooking, welding or jointing (if required) the M. S. rods or Tor steel and binding wires and binding tying the grills hoisting, lowering and placing in proper position as required for RCC works and for providing cost, conveyance of M. S. rods or Tor steel and binding wires of 18 to 20 gauge and labour and cess with all T and P required for the work etc., complete in all floors (weight of binding wires will not be considered for payment and payment will be made on weight of M. S. rods or Tor steel only) as per direction of the Engineer-in-Charge. (Ground floor)
27First floor
28Terrace
29Flyash brick masonary in C.M.(1:6) in Foundation and Plinth using 9 size flyash bricks including splays cutting, circular moulding, champering and corbelling, watering and curing etc., complete including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground floor)
30Flyash brick masonary in C.M.(1:6) in superstructure using 9 size flyash bricks including splays cutting, circular moulding, champering and corbelling, watering and curing etc., complete including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground floor)
31First floor
32Terrace
33Flyash brick masonary in C.M.(1:4) in superstructure using 9 size flyash bricks including splays cutting, circular moulding, champering and corbelling, watering and curing etc., complete including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground Floor)
34First floor
356mm thick cement plaster in C.M.(1:4) to RCC surface finished smooth including closed deep chipping and chiselling and slurry treatment including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground floor)
36First floor
37Terrace
3812mm thick cement plaster in C.M. (1:6) over brick work finished smooth after raking out joints including watering and curing etc., complete including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground Floor)
39First floor
40Terrace
4116mm thick cement plaster in C.M. (1:6) over brick work finished smooth after raking out joints including watering and curing etc., complete including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground floor)
42First floor
43Terrace
44Supplying, fitting, fixing in all fabricated of M.S. iron door and windows in proper position including making hole to walls or RCC structure and making good to the dmages to walls or RCC structure including cost of all materials and labour , T and P, etc., complete in all respect as per specification and direction of the Engineer-in-Charge. (Ground Floor)
45First floor
46Terrace
47Supplying and fitting-fixing of Un-plasticised Poly Vinyl Chloride (UPVC) (FENESTA / NCL VEKA LTD.) Casement Door 60 Series duly manufactured using UPVC reinforced profiles of 60 mm x 55 mmx2.5 mm for outer frames, 102 mm x 60 mm x 2.25 mm for casement Door Sash Profile and 74 mm x 60 mm x 2.5mm mullion profile capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 2.0 mm prefabricated and welded through fusion welding the door sash shall be fitted with 12mm thick WPC Board of Greenply make duly fixed with EPDM weathering seal resistant accessories like clipping locking system made of aluminium 1 No, per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges, materials and product conforming to ASTM D 638-14,EN47795 and other applicable codes and standards. (Ground Floor)
48First floor
49Supplying and fitting-fixing of Un-plasticised Poly Vinyl Chloride(UPVC) ( FENESTA / NCL VEKA LTD.) Three Track Three Panel sliding window 60 Series duly manufactured using UPVC reinforced profiles of 108mm x 45 mm x 2.5 mm for outer frames and Window Sash of 39 mm x 58 mm x 2.5 mm capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 1.5 mm prefabricated and welded through fusion welding the window frame shall be fitted with 6 mm thick clear toughened glass of SAINT-GOBAIN make duly fixed with EPDM weathering seal resistant and the system is to be installed using Reinforced Large Coupler at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges, materials and product conforming to ASTM D 63814,EN47795 and other applicable codes and standards. (Ground Floor)
50First floor
51Terrace
52Supplying and fitting-fixing of Un-plasticised Poly Vinyl Chloride(UPVC) ( FENESTA / NCL VEKA LTD.) Ventilator/Top Hung 60 Series duly manufactured using UPVC reinforced profiles of 60 mm x 55 mmx2.5 mm for outer frames, 75mm x 60 mm x 2.25 mm for casement Window Sash Profile capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 1.5mm prefabricated and welded through fusion welding the door sash shall be fitted with 6mm thick clear toughened glass of SAINT-GOBIN make duly fixed with EPDM weathering seal resistant accessories like clipping locking system made of aluminium 1 No., per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc, including cost and conveyance of all materials, accessories, labour charges, materials and product conforming to ASTM D 638-14,EN47795 and other applicable codes and standards. (Ground Floor)
53First floor
54Supplying, fitting , fixing of Granite tiles of approved dimension area above 0.4 Sqm (20mm thick) in floor, tread of steps and landing on 20 mm thick bed of cement mortar 1:4(1cement: 4 Sand ) jointed with neat cement slurry mixed with pigments to match the shades or the tiles including rubbing and polishing etc.,cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground floor)
55First floor
56Supplying, fitting , fixing of Granite tiles of approved dimension area above 0.4 Sqm (20mm thick) in dado on 20 mm thick bed of cement mortar 1:4(1cement: 4 Sand ) jointed with neat cement slurry mixed with pigments to match the shades or the tiles including rubbing and polishing etc.,cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground floor)
57First floor
58Supplying, fitting, fixing of Vetrified tiles of size 600mmX600mm of approved make the conforming to IS:13755 laid on 20mm thick cement of mortar (1:4) and filling joints with white cement of approved quality including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground floor)
59First floor
60Supplying, fitting, fixing of tiles in dadoes skirting and risers on 12mm thick C. M. (1:3) joined with neat cement slurry mixed with pig ment to match the shade of the tile including rubbering polishing complete with cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground floor)
61First floor
62Supplying, fitting and fixing of tiles in floors, treads, steps and landings on 25mm thick bed of cement mortar (1:1) (1 cement, 1 sand) joined with neat cement slurry mixed with pigment to match the shade of the tile including rubbing polishing complete with cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground floor)
63First floor
64Cement Concrete (1:2:4) using 12mm size H. G. chips of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering, curing etc., complete including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (Ground floor)
65Finishing wall surface of wall with acyclic wall putty (water based) of approved make and finishing the surface smooth and even by sand papering to receive paint in walls, at all heights with staing wherever necessary with cost, conveyance, cess and royalities of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-Charge. (Ground floor)
66First floor
67Terrace
68Wall painting two coats with plastic emulsion paint of approved shade on new work including cost, conveyance, cess and royalities of all materials with labour and T and P etc., required for the work complete and as per direction of the Engineer-in-Charge. (Ground floor)
69First floor
70Terrace
71Providing weather coat two coats over a coat of wall primer to outside wall surface with approved shade including cost, conveyance, cess and royalities of all materials with cost of indigo, blue with labour and T and P required for the work etc., completein all respect as per direction of Engineer-in-Charge. (Ground floor)
72First floor
73Terrace
74Painting two coats with any approved enamel paint over a coat of primer to doors and windows including cost of paint, sand papering, polishing the surface including cost, conveyance, cess and royalities of all materials with labour and T and P etc., required for the work complete and as per direction of the Engineer-in-Charge. (Ground floor)
75First floor
76Terrace
77Supplying, fitting fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc. with cost conveyance, taxes of all materials labour, T and P etc. required for the complete in all respect. (Ground Floor)
78First floor
792.5cm (1 ) thick grading concrete in (1:2:2) using 6mm size C. B. H. G. chips of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering and curing etc., complete including cost, conveyance, cess and royalities, DMF, EMF, additional charges of all materials with labour and T and P required for the work complete and as per direction of Engineer-in-charge. (First floor)
80Terrace
81Earth work in excavation in all kinds of soil for road works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade and camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 301 and 304 of Specification for road and bridge work of MORT and H (5th Revision) and Direction of Engineer in charge.
82Scarifying the existing bituminous road surface to a depth of 50 mm by mechanical means and disposal of scarified material within initial lifts and lead upto 1000 mtr. away from the work site including cost of all labour, T and P and cess etc complete as per the direction of the Engineer-In-Charge.
83E.I. WORKS: Recessed wirring to light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor of ISI marked Make- Finolex/Anchor/Polycab/HAVELLS/RR KABLE/KEI with 20 mm dia HMS FRLS PVC conduit ISI marked Make-AKG/BEC/Precision/Norpak/Anchor/Kinjal 6A modular type (anti bactorial and flame retradant type) switch ISI marked Make-Schneider(Zencelo)/legrand( Myrius-NEXT GEN) /Panasonic (vision) and ceiling rose ISI marked of modular type G.I box with metallic cover plate (both side) (anti bactorial and flame retradant type) Make-Schneider(Zencelo)/legrand( Myrius-NEXT GEN) /Panasonic (vision) of suitable size, modular box with 1.5 sq. Mm FRLS PVC insulated single core multistandard copper conductor as earth wire including all accessories and connection as per direction of Engineer -in -Charge. . All the switches and sockets should be warrantied for a replacement period of 2 years against defects with ncessary test report and Warrnaty certificate to be submitted to the department for genuinity of product and to avail free after sales service within warranty period for acceptance of materials. GROUND FLOOR Group-A
84Group-B
85Group-C
86FIRST FLOOR: Group-A
87Group-B
88Group-C
89Recessed wiring to 5/6Amps.socket outlet with 2x1.5mm² F.R. PVC Insulated single core multi-strand copper conductor of ISI marked in with 20mm dia non-metalic PVC flexible conduit with 6A. 250V.Modular switch of ISI marked, phenolic laminated sheet suitable size ISI marked Modular box and earthing point with 1x1.5mm2 F.R.PVC insulated single core multistrand copper conductor for loop earthing etc. (Make of wire- Finolex/Anchor/Havels/V-guard/Polycab) GROUND FLOOR: Group-A
90b) On Existing board.
91FIRST FLOOR: Group-A
92b) On Existing board.
93Supplying,fixing of 1x16A Plug on the separate board with complete fitting by 01 no of 16A switch and socket(modular type)((anti bactorial and flame retradant type)) with suitable size modular box and cover(anti bactorial and flame retradant type) including supplying of all required accessories of ISI marked as approved as per direction of engg-in-charge.. Make-Schneider(Zencelo)/legrand( Myrius-NEXT GEN)/Panasonic (vision) (For equipement power)All the switches and sockets should be warrantied for a replacement period of 2 years against defects with ncessary test report and Warrnaty certificate to be submitted to the department for genuinity of product and to avail free aftersales service within warranty period for acceptance of materials. GROUND FLOOR
94FIRST FLOOR:
95S/F. of 32A. D.P. MCB Protected plug and socket with plastic cover of Havels/L and T/ C and S make including all connections (For A.C. Machines) GROUND FLOOR
96FIRST FLOOR:
97Supplying and fixing of Call Bell/Buzzer of ISI marked suitable for AC/DC of Single phase including connections etc. as required. GROUND FLOOR
98FIRST FLOOR:
99Supplying and fixing of Batten holder/B.K. Angle holder of ISI marked including connections etc. as required. GROUND FLOOR
100FIRST FLOOR:
101Recessed wiring to submain in following size of FR PVC insulated Single core multistrand copper conductor of ISI marked confirming to IS-694/1900 in 20mm dia non-metalic heavy duty flexible conduit 1.5mm thick alongwith FR PVC insulated S.C.multistrand copper conductor as earth wire as required. (Make of wire-Finolex/ Anchor/Havels/Polycab) GROUND FLOOR a) 1x1.5mm² for Inverter wiring.
102a) 2x1.5mm² +1x1.5mm²
103b) 2x2.5mm² + 1x1.5mm²
104c) 2x4mm² + 1x1.5mm²
105d) 4x10mm² + 2x2.5mm²
106FIRST FLOOR a) 1x1.5mm² for Inverter wiring.
107a) 2x1.5mm² +1x1.5mm²
108b) 2x2.5mm² + 1x1.5mm²
109c) 2x4mm² + 1x1.5mm²
110d) 2x6mm² + 1x2.5mm²
111d) 4x10mm² + 2x2.5mm²
112Supplying and fixing of following mentioned way, three pole/single pole and neutral, sheet steel,double door MCB distribution board, 415 volts/240 volts shall be as per IEC 61439-3,integrated door earthing system offering additional safety to the user,High quality polyurethane Gasket,the box and cover shall be fabricated to withstand IK09,the DB should be properly pre-treated with 7 tank process and duly powder coated, phosphatized with powder coated finish, on surface/recess, complete with terminal blocks,with suitable size FR PVC insulated copper conducter up to terminal blocks, tinned copper busbar, neutral busbar, earth bar, din bar. Make-LEGRAND-Ekinox3 DB/ Siemens-Betaguard/ Schneider- Acti 9/ABB Itus as per direction of Engg.-in-Charge. The Distribution boards should be Replacement Warranty will be 3 years. 4 Way(4+12) Way TPN MCB DD DB Horizontal Type as per IEC 61439-3 suitable for Flush mounting and Surface mounting with 100A Copper Bus Bar for each phase, with neutral Bus bar, Earth Bar and Cable ties for cable management, prefitted masking sheet, IP43-IK09 with metal door Warranty on DB is 3 years (FOR LIGHT,ComputerDB) GROUND FLOOR
113FIRST FLOOR:
114Supplying and fixing 63Amps 4P 415 volts MCB 415 volts, C series,10KA breaking capacity, Make-LEGRAND-DX3 / Siemens-Betaguard/ Schneider- Acti 9/ABB SB 200 in the existing MCB DB with connections as per direction of Engg.-in-Charge..Warranty on MCB is 3 years. GROUND FLOOR
115FIRST FLOOR:
116Supplying and fixing 32 amps rating, 240 volts, C series, Double poles MCB of Make-LEGRAND-DX3 / Siemens-Betaguard/ Schneider- Acti 9/ABB SB 200 in the existing MCB DB complete with connections as per direction of Engg.-in-Charge. The MCB should be Replacement Warranty will be 1 years . GROUND FLOOR:
117FIRST FLOOR:
118Supplying and fixing 6 amps to 32 amps rating, 240 volts, C series, single poles MCB of Make-LEGRAND-DX3 / Siemens-Betaguard/ Schneider- Acti 9/ABB SB 200 . the existing MCB DB complete with connections as per direction of Engg.-in-Charge. The MCB should be Replacement Warranty will be 1 years. GROUND FLOOR:
119FIRST FLOOR:
1206 Way Double door MCB DB Horizontal Type as per IEC 61439-3 suitable for Flush mounting and Surface mounting with Earth Bar and Cable ties for cable management, prefitted masking sheet, IP43-IK09 with metal door Warranty on DB is 3 years (FOR LIGHT,ComputerDB) FIRST FLOOR:
121Supplying and fixing 40 amps rating, 240 volts, C series, Double poles MCB of Make-LEGRAND-DX3 / Siemens-Betaguard/ Schneider- Acti 9/ABB SB 200 in the existing MCB DB complete with connections as per direction of Engg.-in-Charge. The MCB should be Replacement Warranty will be 1 years . FIRST FLOOR:
122Supplying and fixing 6 amps to 32 amps rating, 240 volts, C series, single poles MCB of Make-LEGRAND-DX3 / Siemens-Betaguard/ Schneider- Acti 9/ABB SB 200 . the existing MCB DB complete with connections as per direction of Engg.-in-Charge. The MCB should be Replacement Warranty will be 1 years. FIRST FLOOR:
123SITC of energy efficient LED tube light fittings with decorative alluminium batten and LED tube light having power rating not more than 20 watt and lumen output not less than 2200 lumen complete with electronic driver and all other accessories with diffuser having 2 years warranty i/c connection etc as required as per direction of Engg.-in-Charge. (Make: Panasonic/LT/Havells /Philips/Wipro /Crompton/Bajaj). GROUND FLOOR:
124FIRST FLOOR:
125Supplying, installation, testing and commssioning of 1200 mm sweep white/milky colour BLDC copper winding ceiling fan with aluminium blades having wattage not more than 28W and air deliveryequal to greater than 215m3/min Make-Crompton Energion Groove /Havells Efficiencia Neo/Usha Technix/Bajaj Turbo Pro 12DC5 ) including wiring the down rod of standard length (upto 30 cm) with 1.5 sq mm PVC insulated, copper conductor, single core cable etc. as required as per direction of Engg.-in-Charge, GROUND FLOOR:
126FIRST FLOOR:
127S/F. of 120W, 5 Step Fan Regulator.(2 M) Step type Electronic fan regulator of Cona/Anchor make. GROUND FLOOR:
128FIRST FLOOR:
129S/F. of 300mm Vantilator/Exhaust fans of Orient-300 mm Spring Air/USHA Aeroclean 300MM Goodbye Oil and Dust Metal Exhaust Fan for Kitchen(Metallic Grey)/Havels-Ventil Air DSP /Crompton-Drift Air Plus make. GROUND FLOOR:
130FIRST FLOOR:
131S/F. of 90Wt. LED Street light fittings of Havels-ENDURAPEARLPLUS/Bajaj-EDGE/C.G. make. GROUND FLOOR:
132S/F. of 45Wt. LED Street light fittings of Havels-ENDURAPEARLPLUS/Bajaj-EDGE/C.G. make. GROUND FLOOR:
133FIRST FLOOR:
134S/F. OF 1.5Ton 5 Star DUAL Inverter Super Convertible 6-in-1 Cooling ADC Sensor HD Filter with Anti Virus protection with 100 percentage Copper Tubes with Ocean Black Protection Split type A.C.Machine of LG make. GROUND FLOOR:
135Installation charges of Split type A.C.Machines. GROUND FLOOR:
136S/F. of 4KVA Stabilizer of V-guard/Autotake/Elpower make. GROUND FLOOR:
137S/F. of Angle frame for Outdoor unit of A.C.Machines. GROUND FLOOR:
138S/F. of 160A. Cubicle Outdoor Panel board made out of 16SWG C.R.C.A. Sheet with powder coats and following items. (Main-Panel to be fitted at Staircase) a) 160A. 25kA. 4Pole MCCB of L and T/Havels/C and S/Legrand make. 01 No. (b) 200A. Cu. Bus Bar complete:- 01 nos. (c) 63A. 25kA. 4Pole MCCB of L and T/Havels/C and S/Legrand make:-02 Nos.(d) 100A. 4Pole Cu.Bus Bar for 63A. MCCB :-01 No. (e) 63A. D.P. MCB of 5SL6, Betagard C-characteristics of Siemens make:- 04 nos. (e) Digital Volt meter, Ammeter, RYB indicators, CT Coils, Selector Switch etc.:- 01 Set. (f)) The panel board is to wired with suitable size of Cu. strips which are to be taped with different colours and Cu. F.R. wire of different colours. (g) The panel board is to fitted with MS frame on floor with C.C. work and M.S.nuts and bolts. GROUND FLOOR:
139S/F. of 63A. Cubicle Panel board made out of 16SWG C.R.C.A. Sheet with powder coats and following items.(Sub-Panel to be fitted at Staircase at 1st Floor) a) 63A. 25kA. 4Pole MCCB of L and T/Havels/C and S/Legrand make:-01 No. (b) 100A. Cu. Bus Bar complete:- 01 nos. (c) 100A. 4Pole MCB of L and T/Havels/C and S/ Legrand make:-01 Nos. (d) 63A. D.P. MCB of 5SL6, Betagard C-characteristics of Siemens make:- 04 nos. (e) Digital Volt meter, Ammeter, RYB indicators, CT Coils, Selector Switch etc.:- 01 Set. (f)) The panel board is to wired with suitable size of Cu. strips which are to be taped with different colours and Cu. F.R. wire of different colours. (g) The panel board is to fitted with MS frame on floor with C.C. work and M.S.nuts and bolts. FIRST FLOOR
140S/F. of Standard earthing confirming to IS-3043/1987 including S/F. of 38mm/40mm dia heavy duty G.I. pipe 3mtr long confirming to IS-1239/Part-I/1990. The pipe shall have 12mm dia perforated holes at 15cm interval centre to centre upto 2.5mtr height from the bottom to upper end threaded and fitted with 38mm/40mm dia G.I. flange with Provision of holes for making connections of earth continuity wire, complete with masonary works, for earth pit chamber and S/F. of C.I. hinged top cover 30x30x1cm size. GROUND FLOOR:
141FIRST FLOOR:
142FIRE FIGHTING WORKS:- (a) Providing and Fixing of 4.5 Kgs. Capacity CO2 gas type ISI marked fire extinguisher (IS: 15683) fitted with high pressure 1 mtr. Long discharge hose and horn complete with refill gas, carrying handle and wall mounting bracket etc as required.Make-Safex/Fireshield/Ceasefire
143S/F. OF 4x16mm² PVC Al.Armoured cable of ISI marked.(Make-Havels/Polycab)
144Laying and fixing of one number of PVC insulated and PVC sheathed /XLPE power cable of 1.1KV grade of size not exceeding 25mm2 on surface as required.
145S/F. OF 2500/2300VA U.P.S. of Microtek/Livfast/Luminus make. GROUND FLOOR:
146FIRST FLOOR:
147S/F. OF Tubular Battery of Exide-INV TUBULAR-IMTT1500/Livfast-MXSTT 1851 150AH 12V make. GROUND FLOOR
148FIRST FLOOR:
149PH WORKS Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes conforming to IS:15778, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 20mm dia C-PVC pipe SDR-11 Ground floor
150First Floor =
15125mm dia C-PVC pipe SDR-11 Ground Floor =
152First Floor =
15332mm dia C-PVC pipe SDR-11 Ground Floor =
154First Floor =
15540 mm dia C-PVC pipe SDR-11(Top Floor)
156Supplying all materials, labour T and P and fitting and fixing brass/CP fittings of the following nominal bore with supply of all joiniting materials including cost and conveyance of all materials to worksite, payment of taxes etc. all complete as per P.H specification and direction of the Engineer-in-charge. 15mm dia CP angle stop cock (Jaquar)CON-CHR-059KN
15715mm dia CP Long Body Bib cock (Con-CHR-107KN Jaquar make)
15815mm dia CP two way bib cock (Jaquar)CON-041KN
15915mm dia CP Health faucet (Con-ALD-MCH-573 Jaquar make)
16020mm dia CP consealed stop cock(Con-CHR-083KN Jaquar make)
16125mm dia brass full way valve (Shakti make)
16232mm dia brass full way valve (Shakti make)
16340mm dia brass full way valve (Shakti make)
16415mm CP Extension piece
165125mm CP grating
16615mm size C.P. flange
167Supplying all materials , labour, T and P and fixing rotational moulded polyethylene cylindrical vertical water storage tanks conforming to IS:12701/1996 including cutting holes through the tank and fixing mild steel tubes and fittings and providing extra sockets and jam nuts, fixing ball valve etc. including hoisting upto a height of 5 metres above ground level and placing the tank to the required position and providing 5.40 mtr. lengthx0.25 mtr width KB brickwork in cement mortar (1:6) of 0.46m height in staging and 0.13mtr thick circular protection wall of 0.46mtr height to support the tank,12mm thick cement plaster in cement mortar (1:6) over brick work, RCC slab of size 1.60mX1.60m and 0.10m thick ,RCC beam of 0.25mx0.30m and 3.40m average length in cement concrete (1:2:4) using 12mm size crusher broken hard black granite chips and required steel reinforcement including centering and shuttering,watering,curing ,cost of all materials,conveyance of all materials to worksite , payment of royalty, all taxes etc.all complete as per approved drawing , P.H. specification and direction of Engineer-in-charge 2000 liters capacity PVC water storage tank roof of First Floor
168supplying all materials, labour, T and P and cutting holes through existing brick work including making good the damages in cement mortar (1:4) for taking G.I. Pipes and fittings/ P.V.C. pipes and fittings including watering, curing, cost and conveyance of all materials to worksite, payment of royality, taxes etc. all complete as per direction of Engineer-in-charge.
169Supplying all materials , labour, T and P and cutting holes in RCC floors and roofs upto 19cm thick for passing P.V.C pipes and G.I fittings etc. , and repairing the holes after insertion of pipe etc. with cement concrete (1:2:4) including finishing complete so as to make it leak-proof as per P.H. specification and direction of Engineer-in-charge
170Supplying all materials, labour, T and P and cutting grooves in pucca floors and walls for taking G.I./P.V.C. pipes and making good the damages including watering , curing , cost and conveyance of all materials to worksite, payment of royality, taxes etc all complete as per direction of the Engineer-in-charge.
171Supplying all materials, labour, T and P and fitting and fixing U-PVC SWR soil waste ventilating pipes and fittings of the following outside diameter conforming to ISI No 13592/1992 to walls with nails, bobbins and wooden plugs or laying in trenches including jointing with supply of approved rubber lubricant by non-heat application method/as per manufacturer's specification, testing, earthwork in excavation in all kinds of soil and refilling of trenches , cost and conveyance of all materials to worksite, payment of taxes etc. all complete as per P.H specification and direction of the Engineer-in-charge. 110mm U-PVC SWR Pipe (Ori Plast/Finolex/Supreme Make Type-B)
172110mm U-PVC P Trap(Ori Plast/Finolex/Supreme Make)
173110mm U-PVC door bend(Ori Plast/Finolex/Supreme Make)
174110mm U-PVC offset without ear(Ori Plast/Finolex/Supreme Make)
175110mm U-PVC Plain bend(Ori Plast/Finolex/Supreme Make)
176110mm U-PVC Cowl(Ori Plast/Finolex/Supreme Make)
177110mm U-PVC S/Jn door(Ori Plast/Finolex/Supreme Make)
178110mm U-PVC Plain tee(Ori Plast/Finolex/Supreme Make)
179110mm U-PVC Door tee(Ori Plast/Finolex/Supreme Make)
180110mm U-PVC Socket(Ori Plast/Finolex/Supreme Make)
181Supplying all materials, labour, T and P and fixing vitreous china water closet, squatting pan (Indian type W.C pan/Orissa pattern squatting pan) duly embedded in cement concrete (1:5:10) using 4cm size hard granite metal including fixing a pair of vitreous china 250mm x 130mm x30mm footrest, fixing 100mm dia HCI 'p' or 's' trap (with/without 50mm dia horn) for water colset squatting pan including jointing the trap with pan in cement mortar (1:1) cutting the floor and mending good the damages , cost and conveyance of all materials to worksite, payment of royality , taxes etc. all complete as per P.H specification and direction of the Engineer-in-charge. One piece commod(Hindware)ELEMENT Cat No.92084.
182EWC(Matrix set)No.70002(P-18)
183Supplying all materials, labour, T and P and fixing vitreous china water closet, squatting pan (Indian type W.C pan/Orissa pattern squatting pan) duly embedded in cement concrete (1:5:10) using 4cm size hard granite metal including fixing a pair of vitreous china 250mm x 130mm x30mm footrest, fixing 100mm dia HCI 'p' or 's' trap (with/without 50mm dia horn) for water colset squatting pan including jointing the trap with pan in cement mortar (1:1) cutting the floor and mending good the damages , cost and conveyance of all materials to worksite, payment of royality , taxes etc. all complete as per P.H specification and direction of the Engineer-in-charge. 580mm size Orissa pan (Hindware/Parryware/Neycer make)
184Supplying all materials, labour T and P and and fixing 12.50 liters/10 liters capacity low level flushing cistern with a pair of cast iron or M.S. brackets complete with fittings such as siphonic arrangements 15mm nominal size brass/pvc ball valve with polythene float CP brass handle,unions and couplings for connection with inlet, outlet and overflow pipes, 32mm dia CP long flush bend, 15mm dia pvc inlet connection pipe including cutting holes and making good the same and connecting the flush bend with cistern and closet and connceting the inlet pipe with suupply main , cost and conveyance of all materials to worksite, payment of taxes etc. all complete as per P.H specification and direction of the Engineer-in-charge 10 ltr. Capacity pvc L.L. cistern with 32mm. Dia CP long flush bend ( Slimline-white-Parryware make )
185Supplying all materials, labour T and P and fixing wash basins with hole for pillar taps with cast iron or M.S.brackets painted white including cutting holes in walls and making good the damages with supply of wooden plugs, screws and cement etc, fixing pedestal for wash basin recessed at the back for the reception of pipes and fittings, fixing PVC waste pipe of 32mm nominal diameter for wash basin including brass check nut complete, fixing pillar taps capstan head screw down high pressure lettered 'Hot' and 'Cold' with long screws, shanks and back nuts of 15mm dia nominal bore, fixing 15mm dia PVC inlet connection pipe and making connection with pillar cocks and supply mains for wash basin, fixing 32mm dia CP brass waste, cost and conveyance of all materials to worksite, payment of taxes etc. all complete as perP.H specification and direction of the Engineer-in-charge 550mmx400mm W.H.basin (Hindware/Parryware/Neycer make)with 15mm dia C.P.pillar cock (Plaza make) with pedestal
186Supplying all materials, labour, T and P and fixing standard sized CP towel rail complete with CP brass brackets fixed to wooden plugs with CP screws as per specification and direction of the Engineer in charge 25mm x 600mm long CP towel rail
187CP towel Ring
188Supplying all materials, labour, T and P and fixing CP soap holder complete with CP brass brackets fixed to wooden plugs with CP screws as per specification and direction of the Engineer in charge CP soap holder
189Supplying all materials, labour, T and P and fixing standard sized glass-shelf with CP brass brackets and guard rail complete fixed to wooden plugs with CP screws as per specification and direction of Engineer in charge 600 x 125mm plate glass shelf with CP guard rails
190Supplying all materials, labour, T and P and fixing mirror of superior glass mounted on 6mm.thick A.C. sheet or ply wood sheet and fixed to wooden plugs with CP screws and washers complete as per specification and direction of Engineer in charge 600mmx450mm size B.E mirror (swivelled type)
191Supplying all materials labor T and P and Fitting and fixing CP shower with rim with supply of red lead and yarn nail complete as per direction of Engineer in charge. 15mm CP revolving shower with arm (Plaza)
192Supplying all materials,labour,T and P and fixing Flat back lipped wall (Mini stall urinal -630mmx180mm) urinal of the following sizes including connecting the urinal with 32mm. dia pvc waste pipe 910mm. long by means of white lead mixed with chopped hemp, fixing 32mm. dia CP dome waste, 15mm. dia CP spreader including cutting holes in walls and making good the damages with supply of wooden plugs, screws and cement etc. all complete as per specification and direction of the Engineer in charge stall urinal
193Supplying all materials , labour, T and P and cutting holes through existing brick or laterite masonry wall for taking U-PVC pipes and fittings including making good the damages etc. all complete as per P.H. specification and direction of Engineer-in-charge
194Supplying all materials , labour, T and P and cutting of RCC chajja for taking HCI or U-PVC pipe and fittings including making good the damages etc. all complete as per P.H. specification and direction of Engineer-in-charge
195Supplying all materials, labour, T and P and providing cement concrete ( 1:2:4 ) with 12mm size crusher broken hard black granite chips including watering, curing,cost of all materials, conveyance of all materials to work site with payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge. Ground Floor
196First Floor
197Supplying all materials, labour, T and P and providing and fixing ceramic tiles in floors, treads or steps and landing on 25mm thick bed of cement mortar (1:1) ( 1 cement : 1 sand ) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including watering, curing,cost of all materials, conveyance of all materials to work site , payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge ( ceramic floor tiles of premium grade having thickness 7mm to 8mm conforming to IS 13755 of size 40cmx40cm special printed series to be pre-approved by the Engineer-in-charge ) Ceramic tile 60cmx60cm Kajaria/Somany/Johnson premium Ground Floor
198First Floor
199Supplying all materials,labour,T and P and providing 12mm thick cement plaster(1:4) on brick work including watering,curing,cost of all materials, conveyance of all materials to worksite,payment of royalty,all taxes etc.all complete as per PWD specification and direction of the Engineer-in-charge. Ground Floor
200First Floor
201Supplying all materials, labour, T and P and providing and fixing porcelain glazed tiles in dado skirting on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigment to match the shades of the tiles including watering, curing,cost of all materials, conveyance of all materials to work site , payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge( ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm conforming to IS 13753 of size 25cmx33cm special plain / printed series to be pre-approved by the Engineer-in-charge ) Glazed tile 60cmx30cm Kajaria/Somany/Johnson premium Ground Floor
202First Floor
203Factory made single leaf Solid WPC (Wood polymer) composite door shutter of 25mm thickcompacted with wood grain finish structural foam panel of 29mm thickness and a density of 20kg/cu.mtr shall be used as core material for fitting the metal fittings such as tower bolts, aldrops, handles etc shall be provided. A structural adhesive compatible with (EPS) foam shall be used for bending the core material, The material and process for manufacturing the door shutters shall conform to RV-TIFAC composites Design Centre's standards and specifications and the door shutters Conforming to relevant I.S.specification. The finish of door shutter will be plain colour white/ Ivory/ Beige/ Light grey/ Mahogany/ Teak wood or any other colour using high quality pigments. Three heavy whight mild steel butt hinges type-I(ISI marked) size 100mm are to be fitted on one side of shutter.
204Factory made Solid WPC door frame of size 95mmx55mm fabricated .The door frame consist of four segments which are provided with plug-in-socket arrangement in-situ in the mould. The segments are plugged in and are joined together by means of screw. The WPC frame shall be provided with The material and process for manufacturing the door frames shall conform to Relavent I.S.specification. The finish of door frame will be plain colour white/ Ivory/ Beige/ Light grey/ Golden brown/Mahogany/ Teak wood/sand stone/Champagne/Pastel blue or any other colour using high quality pigments complete in all respect as per specification and direction of the Engineer in charge
205Providing fitting, fixing of Aluminium door with anodized AL. door section of 9202 as vertical member,9201 as top and 9200 as middle bottom member with frame section No. 9221 and tapered clip no. 4660 and the frame to be completed by means of jointing angle No. 1855 Including all Cost of Labour. T and P hire charges of drilling machine. labour charges etc. complete. Ref : OBI10 SD =1 x 1.20 x 2.40
206Supplying all materials, labour, T and P and providing fitting and fixing (Aqua guard) pure chill 80 PSS UV of size 750 x 570 x 1350mm hight with water storage capacity 80 liter's along with 2 noa of faucets 1 for cold water and 1 for normal water including a flow of 1.5 ltr per munite etc all complete as per approved drawing , specification and direction of the Engineer in charge Aqua guard pure Chill 80 PSS UV
207Supplying all materials, labour, T and P and laying in trenches (to level or slope) unplasticized P.V.C. pipe conforming to IS 4985/2000 of the following out side dia for class- 3 (0.60mpa ) including jointing with supply of approved solvent cement by non-heat application method/as per manufacture's specification, provoding and laying in trench cement concrete (1:4:8) with 40mm size hard granite metal in the type C-1 standard bedding surrounding or encasing including concrete for bedding and curing etc all complete as per P.H. specification and direction of the Engineer in charge 110mm dia u-pvc pipe alround concrete
208Supplying all materials ,labour ,T and P and constructing Inspection Chamber of inside size 760mmx760mmx460mm with cement concrete (1:3:6) using 40mm size crusher broken hard black granite metal on bed , KB brick work in cement mortar (1:6) in foundation and plinth, moulding and shaping the channel inside and benching with cement concrete (1:2:4) using 12mm size crusher broken hard black granite chips, 12mm thick cement plaster (1:3) with cement punning to inside, cement flush pointing (1:3) to outside, R.C.C cover slab (1:2:4) using 12mm size crusher broken hard black granite chips with R.C.C man hole cover, earth work in excavation in all kinds of soil and refilling the cavity around the chamber including watering,curing,cost of all materials, conveyance of all materials to worksite, payment of royalty,all taxes etc.all complete as per approved drawing, P.H specification and direction of Engineer-in-charge Inside size 76cmx76cmx46cm with 18 dia RCC MH cover
209Supplying all materials labor T and P and constructing MH chamber of sizes earth work in excavation in all kinds of soil CC(1:1:8) with black granite chips size 46mm brick work with K.B. brick having crossing strength not less than 75 Kg /CM2 to 90 Kg/CM2s in CM(1:6)12mm C.P(1:8) inside MH chamber over benching with cement slush pointing (1:3)outside the MH chamber providing painting MS or CI step iron RCC(roof of slab with CC(1:2:4)with black granite chips size 12mm bending binding tying the grills placing of the reinforcement providing RCC color of required size refilling the cavity around the MH chamber with excavated earth including channeling the bed of MH etc all complete as per PH specification. MH size 0.91m x 0.91 m with 0.45 m (18 dia RCC Cover )
210Supplying all materials labour T and P and constructing 1.40m dia x 2.00 m deep soak way pit with dry brick having crossing strength not less than 75Kg/CM2 to 99Kg/CM2 in CM(1:6) for the remaining 0.4572mm height of wall at top CC(1:3)inside and outside inside fill with dry brick khoa size 38mm ,CM thick RCC perforated slab to a height of 1.9012m from bottom covered by means of 50mmthick RCC wall cover in pieces filled with iron plugs including earth work in excavation refilling of cavity around the pit and painting the iron works complete as per PHD design and specification including carriage of all materials to site.
2111 no 30 Users Septic Tank --Earth work in excavation of foundation in all kinds of soil with in 1.5m initial lift including dressing and leveling of bed and breaking the clods and the excavated materials with in 50m initial lead as per direction of Engineer in charge.
212Earth work in excavation of foundation in all kinds of soil with in 1.5m initial lift including dressing and leveling of bed and breaking the clods and the excavated materials with in 50m initial lead as per direction of Engineer in charge with 1st extra lift of 1.50 m over initial laft.
213Supplying all materials labor T and P filling sand in foundation and plinth with well watered and rammed etc all complete as per direction of Engineer-in-charge.
214Supplying all materials, labor T and P providing CC (1:3:6) with 4 cm HG metal including watering curing lead of all materials to site etc. complete.
215Supplying all materials, labour, T and P and providing cement concrete ( 1:2:4 ) with 12mm size crusher broken hard black granite chips including watering, curing,cost of all materials, conveyance of all materials to work site with payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge.
216Supplying all materials, labour, T and P and providing cement concrete (1:1½:3) with 12mm size crusher broken hard black granite chips for RCC works including hoisting, laying, watering, curing,cost of all materials, conveyance of all materials to worksite, payment of royalty,all taxes etc. all complete as per PWD specification and direction of the Engineer in charge.
217Supplying all materials, labour, T and P and providing steel reinforcement of Fe-415 /Fe-500 grade for RCC work including cutting,bending,binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge,cost of steel, conveyance of all materials to worksite, payment of royalty,all taxes etc all complete as per PWD specification and direction of the Engineer-in-charge.
218Supplying all materials, labour, T and P and providing rigid and smooth centering and shuttering for RCC works including false work and dismantling them after casting including conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of the Engineer-in-charge. RCC floor, roof slab chhaja up to 4.430 m height
219Supplying all materials.labour.T and P and providing brick work in foundation and plinth with 23cmx11cmx8cm size Fly Ash bricks having curshing strength not less than 75 kg/sqcm with dimensional tolerance+ 8 percentage in cement mortar ( 1:6 ) including watering,curing,cost of all materials,conveyance of all materials to worksite,payment of royalty,all taxes etc.all complete as per PWD specification and direction of the Engineer in charge.
220Supplying all materials,labour,T and P and providing 12mm thick cement plaster(1:3) on brick work including watering,curing,cost of all materials, conveyance of all materials to worksite,payment of royalty,all taxes etc.all complete as per PWD specification and direction of the Engineer-in-charge.
221Supplying all materials,labour,T and P and providing 16mm thick cement plaster(1:6) on brick work including watering,curing,cost of all materials, conveyance of all materials to worksite,payment of royalty,all taxes etc.all complete as per PWD specification and direction of the Engineer-in-charge.
222Supplying all materials, labour, T and P and providing cement punning including watering, curing,cost of all materials, conveyance of all materials to worksite, payment of royalty,all taxes etc. all complete as per specification and direction of the Engineer-in-charge
223Supplying all labor T and P and filling foundation and plinth with excavated materials well watered and rammed etc. all complete as per direction of EIC.
22414,000 ltr capacity R.C.C. Under ground sump of in side size (2.80m x 2.80m x 2.0m) Earth work in excavation of foundation in all kinds of soil with in 1.5m initial lift including dressing and leveling of bed and breaking the clods and the excavated materials with in 50m initial lead as per direction of Engineer in charge.
225Earth work in excavation of foundation in all kinds of soil with in 1.5m initial lift including dressing and leveling of bed and breaking the clods and the excavated materials with in 50m initial lead as per direction of Engineer in charge with 1st extra lift of 1.50 m over initial laft.
226Supplying all labor T and P and filling foundation and plinth with excavated materials well watered and rammed etc. all complete as per direction of EIC.
227Supplying all materials labour T and P filling sand in foundation and plinth with well watered and rammed etc. all complate. As per direction of ELC.
228Supplying all materials, labour, T and P and providing cement concrete ( 1:3:6 ) with 40mm size crusher broken hard black granite chips including watering, curing,cost of all materials, conveyance of all materials to work site with payment of royalty, all taxes etc all complete as per P.W.D specification and direction of Engineer-in-charge
229Supplying all materials, labour, T and P and providing cement concrete (1:1½:3) with 12mm size crusher broken hard black granite chips for RCC works including hoisting, laying, watering, curing,cost of all materials, conveyance of all materials to worksite, payment of royalty,all taxes etc. all complete as per PWD specification and direction of the Engineer in charge.
230Supplying all materials, labour, T and P and providing steel reinforcement of Fe-415 /Fe-500 grade for RCC work including cutting,bending,binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge,cost of steel, conveyance of all materials to worksite, payment of royalty,all taxes etc all complete as per PWD specification and direction of the Engineer-in-charge.
231Supplying all materials, labour, T and P and providing rigid and smooth centering and shuttering for RCC works including false work and dismantling them after casting including conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of the Engineer-in-charge RCC floor, roof slab chhaja up to 4.430 m height
232Supplying all materials,labour,T and P and providing 12mm thick cement plaster(1:3) on brick work including watering,curing,cost of all materials, conveyance of all materials to worksite,payment of royalty,all taxes etc.all complete as per PWD specification and direction of the Engineer-in-charge.
233Supplying all materials, labour, T and P and providing cement punning including watering, curing,cost of all materials, conveyance of all materials to worksite, payment of royalty,all taxes etc. all complete as per specification and direction of the Engineer-in-charge
234Construction of 1nos production wells including scientific source finding through consolidated and unconsolidated rock with down the hammer drilling rig or combination rig with PVC pipe and installation of submersible pump set with all acessories. Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rig or combination rig as required to suit the site condition as per the direction of the Engineer in charge including use of own rig with its accessories, tools and plant and consumables etc for lowering of 200mm/150mm dia G.I/P.V.C/M.S casing pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/ P.V.C/ M.S casing pipes if required to prevent collapse of overburden is to be provided by the contractor including lowering and withdrawing after completion of the tube well), 200mm dia to 400mm dia in overburden portion including packing of gravel supplied by the contractor for 400mm dia bore only. Drilling of 200mm dia bore 00 mtr to 30mtr
23531 mtr to 48mtr
236Drilling of 150mm dia bore 49 mtr to above
237Lowering the following size of G.I/P.V.C/M.S housing pipes with or without slotted pipes as per the necessity from ground level up to 45.00m depth and fitted and fixed up in perfectly vertical position including cutting and threading of pipes and slotted pipes and supplying and fixing all jointing materials, tools and plant etc all complete and keeping the top of casing pipe threaded including plugging tube wells to prevent entry of foreign materials. Lowering of 200mm dia P.V.C casing pipes00 mtr to 30 mtrs
238Supplying polyvinyl chloride pipes as per ASTM-D-1785-89 having threads in accordance with DIN 2999 part-1/DIN-42225 part-II specification length of pipe (laying length) will be 3 mtrs. The pipes shall be supplied with both external and threaded with free socket. The pipe having external thread at one end i.e female and or belled end. The female end having internal thread is to be belled in order to accept the male end while jointing pipes with a bore threading shall be provided with a greave at the roof of the male thread accomodate flexible PVC/Rubber 'O' ring to make the joint water tight colour of the pipe shall be blue. The name of the manufacture along with batch No class of pipe shall be stranded legibly of each pipe length. 200mm dia PVC (sch-80) pipe
239Supplying all materials, labour, T and P and providing and providing sanitary sealing by cement concrete grouting of annular space around GI/PVC/MS housing pipe upto 5m below ground level (as per drawing) to plug the bore hole excluding cost of cement all complete as per direction of the Engineer in charge. Minimum one metre of casing pipe to be inserted in the bore into the rock at the bottom to ensure sanitary sealing (excluding cost of cement which will be supplied directly by the department)
240Cleaning and developing the tube well with supply of compressor worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipment and labour as per direction of the Engineer in charge. By DTH Rig
241Supplying all materials, equipment, labour and conducting reconnaissance survey, integrated Hydrological and Geophysical (Electrical Resistivity Method) survey and selection of potential source for exploration of Ground Water including selection and recommendation of site for drilling wells in selected locations in any part of Orissa under the following Geological formation: Rocky terrain with boulder formation for 300m depth
242Supplying all materials, labour, T and P and providing, fitting and fixing submersible pump with squirrel cage induction type submersible type submersible electric motor to run on 3 phase/1 phase line voltage ranging from 320 volt to 450 volt conforming to IS: 8034/89 with following specifications with suitable control panel, jointing with GI/PVC/HDPE pipes, electrification, testing, commissioning, trial running, conveyance of all materials to worksite, payment of taxes etc all complete as per specification and direction of the Engineer in charge (Texmo/Crompton Greaves/Kirloskar make) 1 H.P. Single phase/ three phase 3 stage head renge of 20 to 35 mtr with discharge capasity 145 to 110 L.P.M With outlet dia 25 mm (keeping 100 percentage standby)
243DOL Control panel
24440mm dia steel short piece
245Well cap
24650mm size CI bracket
2472.50sqmm flat cable
24820mm dia rigid UPVC pipes
249Steel rope with cover
250Labour charges for lowering including transportation
251Supplying all materials, labour, T and P and providing and fixing to wall or ceiling and floor HDPE pipes and pipe fittings conforming to IS: 4984/2000 (10kgf/sqcm) of the following nominal bore with clamps and jointing by Fusion welding method including testing, making good the wall, ceiling and floor all complete as per specification and direction of the Engineer in charge 32mm HDPE pipes (Finolex/Supreme make) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56642951
AUTHORITY Government Departments
TENDER VALUE 1.80 Crore
LAST DATE 07-08-2026
Authority
Authority Name Road And Building Department
Work Description Tender for Construction Of New Administrative Building At Kvk Semiliguda District Koraput
Basic Detail
Tender No C.C.E.J.C (R and B) -07/2026-27
Bidding Type Tender
Location
City Koraput
State Odisha
Key Dates
Publish Date 24 Jul 2026
Submission Date 07 Aug 2026
Open Date 10 Aug 2026
Finance
Tender Value 1.80 Crore
Tender Fee 10000
EMD 1.81 Lakhs
Exemption Available
Document List
BOQ_603216.xls
e443e751-7a48-4d42-8b29-4cc6336e92db.html
Tendernotice_1.pdf
Tendernotice_2 (6).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 24, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 07, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days
Aug 10, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 8 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_603216.xls

html

e443e751-7a48-4d42-8b29-4cc6336e92db.html

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2 (6).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders