Tender For Annual Rate Contract For Repair/ Replacement Of Damaged Parts Of Hc Pumps, Submersible Pumps,Mono Sub. , Replacement / Rewinding Of Coils Of Various Types Of Submersible / Induction Motors Etc. At Various T/Wells, D/Wells Of Phe(M) Sub Div. Sam
Tender Overview
Project Description
Tender For Annual Rate Contract For Repair/ Replacement Of Damaged Parts Of Hc Pumps, Submersible Pumps,Mono Sub. , Replacement / Rewinding Of Coils Of Various Types Of Submersible / Induction Motors Etc. At Various T/Wells, D/Wells Of Phe(M) Sub Div. Samba-Ii
BOQ
| Sl. No. | Item Description |
| 1 | RKB make: Decoupling of pump from motor, checking for damage, minor repairs to be done at site if required and recoupling of repaired pump with motor, checking of realignment of pump and motor. |
| 2 | Manual carriage of the pump wherever required to the nearest roadside and loading into mechanical transport for carrage to workshop and back manual carrage of repaired pump from nearest roadside to the pumping station. for head load distance 0 to 1 kms. |
| 3 | for head load distance 1-3 kms |
| 4 | for head load distance >3 kms |
| 5 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) |
| 6 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) |
| 7 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) |
| 8 | Fabrication of new S.S. pump shaft as per size and specification. (3 Stage Pump) |
| 9 | Fabrication of new S.S. pump shaft as per size and specification. (4 Stage Pump) |
| 10 | Fabrication of new S.S. pump shaft as per size and specification. (5 Stage Pump) |
| 11 | Fabrication of new S.S. pump shaft as per size and specification. (6 Stage Pump) |
| 12 | Fabrication of new S.S. pump shaft as per size and specification. (7 Stage Pump) |
| 13 | Fabrication of new S.S. pump shaft as per size and specification. (8 Stage Pump) |
| 14 | Fabrication of new S.S. pump shaft as per size and specification. (9 Stage Pump) |
| 15 | Fabrication of new S.S. pump shaft as per size and specification. (10 Stage Pump) |
| 16 | Fabrication of new S.S. pump shaft as per size and specification. (12 Stage Pump) |
| 17 | Fabrication of new S.S. pump shaft as per size and specification. (14 Stage Pump) |
| 18 | Providing of Brass Impeller as per sample |
| 19 | Providing of C.I Impeller as per sample |
| 20 | Repairing of brass Impeller |
| 21 | Repairing of C.I Impeller |
| 22 | Fabrication & fitting of neck ring |
| 23 | Fabrication & fitting of diffuser bush |
| 24 | Fabrication & fitting of stainless steel shaft sleeves |
| 25 | Fabrication & fitting of chuck nut |
| 26 | Providing & fitting of pump bowl |
| 27 | Repair to bearing housing by sleeve fitting & boring for bearing size |
| 28 | Providing bearing housing along with side cover plate |
| 29 | Providing of Delivery Body |
| 30 | Providing of Suction Body |
| 31 | Providing of diffuser |
| 32 | Providing of Oil seal |
| 33 | Providing Coupling bolts nuts & rubber bushes |
| 34 | Fabrication & fitting of gland plated along with studs |
| 35 | Fabrication & fitting of tie rod bolts |
| 36 | Dismantling & fitting of Pump (3 stage to 5 stage) |
| 37 | Dismantling & fitting of Pump (6 stage to 10 stage) |
| 38 | Dismantling & fitting of Pump (Beyond 10 stage) |
| 39 | FNC Make: Decoupling of pump from motor, checking for damage, minor repairs to be done at site if required and recoupling of repaired pump with motor, checking of realignment of pump and motor. |
| 40 | Manual carriage of the pump wherever required to the nearest roadside and loading into mechanical transport for carrage to workshop and back manual carrage of repaired pump from nearest roadside to the pumping station. for head load distance 0 to 1 kms. |
| 41 | for head load distance 1-3 kms |
| 42 | for head load distance >3 kms |
| 43 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) |
| 44 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) |
| 45 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) |
| 46 | Fabrication of new S.S. pump shaft as per size and specification. (3 Stage Pump) |
| 47 | Fabrication of new S.S. pump shaft as per size and specification. (4 Stage Pump) |
| 48 | Fabrication of new S.S. pump shaft as per size and specification. (5 Stage Pump) |
| 49 | Fabrication of new S.S. pump shaft as per size and specification. (6 Stage Pump) |
| 50 | Fabrication of new S.S. pump shaft as per size and specification. (7 Stage Pump) |
| 51 | Fabrication of new S.S. pump shaft as per size and specification. (8 Stage Pump) |
| 52 | Fabrication of new S.S. pump shaft as per size and specification. (9 Stage Pump) |
| 53 | Fabrication of new S.S. pump shaft as per size and specification. (10 Stage Pump) |
| 54 | Fabrication of new S.S. pump shaft as per size and specification. (12 Stage Pump) |
| 55 | Fabrication of new S.S. pump shaft as per size and specification. (14 Stage Pump) |
| 56 | Providing of Brass Impeller as per sample |
| 57 | Providing of C.I Impeller as per sample |
| 58 | Repairing of brass Impeller |
| 59 | Repairing of C.I Impeller |
| 60 | Fabrication of neck ring |
| 61 | Fabrication of diffuser bush |
| 62 | Fabrication of gland bush |
| 63 | Fabrication of chuck nut |
| 64 | Providing of pump bowl |
| 65 | Repair to bearing housing by sleeve fitting & boring for bearing size |
| 66 | Providing bearing housing along with side cover plate |
| 67 | Providing of Delivery Body |
| 68 | Providing of Suction Body |
| 69 | Providing of diffuser |
| 70 | Providing of Oil seal |
| 71 | Providing Coupling bolts nuts & rubber bushes. |
| 72 | Fabrication & fitting of gland plated along with studs |
| 73 | Fabrication & fitting of tie rod bolts |
| 74 | Dismantling & fitting of Pump (3 stage to 5 stage) |
| 75 | Dismantling & fitting of Pump (6 stage to 10 stage) |
| 76 | Dismantling & fitting of Pump (Beyond 10 stage) |
| 77 | MATHER & PLATT make: Decoupling of pump from motor, checking for damage, minor repairs to be done at site if required and recoupling of repaired pump with motor, checking of realignment of pump and motor. |
| 78 | Manual carriage of the pump wherever required to the nearest roadside and loading into mechanical transport for carrage to workshop and back manual carrage of repaired pump from nearest roadside to the pumping station. for head load distance 0 to 1 kms. |
| 79 | for head load distance 1-3 kms |
| 80 | for head load distance >3 kms |
| 81 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) |
| 82 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) |
| 83 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) |
| 84 | Fabrication of new S.S. pump shaft as per size and specification. (3 Stage Pump) |
| 85 | Fabrication of new S.S. pump shaft as per size and specification. (4 Stage Pump) |
| 86 | Fabrication of new S.S. pump shaft as per size and specification. (5 Stage Pump) |
| 87 | Fabrication of new S.S. pump shaft as per size and specification. (6 Stage Pump) |
| 88 | Fabrication of new S.S. pump shaft as per size and specification. (7 Stage Pump) |
| 89 | Fabrication of new S.S. pump shaft as per size and specification. (8 Stage Pump) |
| 90 | Fabrication of new S.S. pump shaft as per size and specification. (9 Stage Pump) |
| 91 | Fabrication of new S.S. pump shaft as per size and specification. (10 Stage Pump) |
| 92 | Fabrication of new S.S. pump shaft as per size and specification. (12 Stage Pump) |
| 93 | Fabrication of new S.S. pump shaft as per size and specification. (14 Stage Pump) |
| 94 | Providing of Brass Impeller as per sample |
| 95 | Providing and fitting of C.I Impeller as per sample |
| 96 | Repairing of brass Impeller |
| 97 | Repairing of C.I Impeller |
| 98 | Fabrication of neck ring |
| 99 | Fabrication of diffuser bush |
| 100 | Fabrication of gland bush |
| 101 | Fabrication of chuck nut |
| 102 | Providing of pump bowl |
| 103 | Repair to bearing housing by sleeve fitting & boring for bearing size |
| 104 | Providing bearing housing along with side cover plate |
| 105 | Providing of oil cooled brass bush |
| 106 | Providing of Delivery Body |
| 107 | Providing of Suction Body |
| 108 | Providing of diffuser |
| 109 | Providing of Oil seal |
| 110 | Providing Coupling bolts nuts & rubber bushes. |
| 111 | Fabrication & fitting of gland plated along with studs |
| 112 | Fabrication & fitting of tie rod bolts |
| 113 | Dismantling & fitting of Pump (3 stage to 5 stage) |
| 114 | Dismantling & fitting of Pump (6 stage to 10 stage) |
| 115 | Dismantling & fitting of Pump (Beyond 10 stage) |
| 116 | KSB make : Decoupling of pump from motor, checking for damage, minor repairs to be done at site if required and recoupling of repaired pump with motor, checking of realignment of pump and motor. |
| 117 | Manual carriage of the pump wherever required to the nearest roadside and loading into mechanical transport for carrage to workshop and back manual carrage of repaired pump from nearest roadside to the pumping station.for head load distance 0 to 1 kms. |
| 118 | for head load distance 1-3 kms |
| 119 | for head load distance >3 kms |
| 120 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (up to 5 stage) |
| 121 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (6 stage to 10 stage) |
| 122 | Repairing of pump shaft by remetalling with S.S. welding, turning & polishing to exact size (Beyond 10 stage) |
| 123 | Fabrication of new S.S. pump shaft as per size and specification. (3 Stage Pump) |
| 124 | Fabrication of new S.S. pump shaft as per size and specification. (4 Stage Pump) |
| 125 | Fabrication of new S.S. pump shaft as per size and specification. (5 Stage Pump) |
| 126 | Fabrication of new S.S. pump shaft as per size and specification. (6 Stage Pump) |
| 127 | Fabrication of new S.S. pump shaft as per size and specification. (7 Stage Pump) |
| 128 | Fabrication of new S.S. pump shaft as per size and specification. (8 Stage Pump) |
| 129 | Fabrication of new S.S. pump shaft as per size and specification. (9 Stage Pump) |
| 130 | Fabrication of new S.S. pump shaft as per size and specification. (10 Stage Pump) |
| 131 | Fabrication of new S.S. pump shaft as per size and specification. (12 Stage Pump) |
| 132 | Fabrication of new S.S. pump shaft as per size and specification. (14 Stage Pump) |
| 133 | Providing and fitting of Brass Impeller |
| 134 | Providing and fitting of C.I Impeller |
| 135 | Repairing of brass Impeller |
| 136 | Repairing of C.I Impeller |
| 137 | Fabrication of neck ring |
| 138 | Fabrication of diffuser bush |
| 139 | Fabrication of gland bush |
| 140 | Fabrication of chuck nut |
| 141 | Providing of pump bowl |
| 142 | Repair to bearing housing by sleeve fitting & boring for bearing size |
| 143 | Providing bearing housing along with side cover plate |
| 144 | Fabrication of spacer bush |
| 145 | Providing of Delivery Body |
| 146 | Providing of Suction Body |
| 147 | Providing of diffuser |
| 148 | Providing of Oil seal |
| 149 | Providing Coupling bolts nuts & rubber bushes. |
| 150 | Fabrication & fitting of gland plated along with studs |
| 151 | Fabrication & fitting of tie rod bolts |
| 152 | Dismantling & fitting of Pump (3 stage to 5 stage) |
| 153 | Dismantling & fitting of Pump (6 stage to 10 stage) |
| 154 | Dismantling & fitting of Pump (Beyond 10 stage) |
| 155 | Repairing of Submersible Pump (V-4 make): Repairing of pump shaft by welding, turning, polishing & making of key ways |
| 156 | Fabrication / providing of pump shaft as per exact size & specification |
| 157 | Fabrication / providing of impeller |
| 158 | Providing of V-4 plastic impeller |
| 159 | Repairs to Impeller |
| 160 | Fabrication / providing of Neck Ring |
| 161 | Fabrication / providing of Body Bush |
| 162 | Fabrication / providing of Guide Bush |
| 163 | Fabrication / providing of Spacer Bush |
| 164 | Fabrication / providing of Cotter |
| 165 | Fabrication / providing of Coupling pulley with cotter |
| 166 | Fabrication / providing of Pump Body |
| 167 | Fabrication / providing of Suction Body |
| 168 | Dismantling and fitting charges of V-4 submersible pump |
| 169 | Repairing of Submersible Pump (V-6 make): Repairing of pump shaft by welding, turning, polishing & making of key ways |
| 170 | Fabrication / providing of pump shaft as per exact size & specification (up to 5 stage) |
| 171 | Fabrication / providing of S.S. pump shaft as per exact size & specification (6 stage to 10 stage) |
| 172 | Fabrication / providing of pump shaft as per exact size & specification (11 stage to 15 stage) |
| 173 | Fabrication / providing of pump shaft as per exact size & specification (16 stage to 20 stage) |
| 174 | Fabrication / providing of S.S. pump shaft as per exact size & specification (Beyond 20 stage) |
| 175 | Fabrication / providing of impeller |
| 176 | Providing of V-6 plastic impeller |
| 177 | Repairs to Impeller |
| 178 | Fabrication / providing of Neck Ring |
| 179 | Fabrication / providing of Body Bush |
| 180 | Fabrication / providing of Guide Bush |
| 181 | Fabrication / providing of Spacer Bush |
| 182 | Fabrication / providing of Cotter |
| 183 | Fabrication / providing of Pump Body |
| 184 | Fabrication / providing of Suction Body |
| 185 | Fabrication / providing of Coupling pulley with cotter for V-6 Submersible motor |
| 186 | Fabrication / providing of 50 mm dia. flanged adaptor with threading at other side |
| 187 | Fabrication / providing of 65 mm dia. flanged adaptor with threading at other side |
| 188 | Fabrication / providing of 80 mm dia. flanged adaptor with threading at other side |
| 189 | Dismantling and fitting charges of pump (up to 5 stage) |
| 190 | Dismantling and fitting charges of pump (6 stage to 10 stage) |
| 191 | Dismantling and fitting charges of pump (11 stage to 15 stage) |
| 192 | Dismantling and fitting charges of pump (Beyond 15 stage) |
| 193 | Repairing of Submersible Pump (V-8 make): Repairing of pump shaft by welding, turning, polishing & making of key ways |
| 194 | Fabrication / providing of pump shaft as per exact size & specification |
| 195 | Fabrication / providing of Impeller |
| 196 | Repairs to Impeller |
| 197 | Fabrication / providing of Neck Ring |
| 198 | Fabrication / providing of Body Bush |
| 199 | Fabrication / providing of Guide Bush |
| 200 | Fabrication / providing of Spacer Bush |
| 201 | Fabrication / providing of Cotter |
| 202 | Fabrication / providing of Coupling pulley with cotter for V-8 submersible pump |
| 203 | Fabrication / providing of Pump Body |
| 204 | Fabrication / providing of Suction Body |
| 205 | Fabrication / providing of NRV with adaptor for V8 pump |
| 206 | Fabrication / providing of flanged adaptor with threading at other end for V8 pump |
| 207 | Dismantling and fitting charges of V-8 submersible pump |
| 208 | Replacement by providing & fitting of bearing-7307 (SKF/NBC/FAG/Reputed make) |
| 209 | Replacement by providing & fitting of bearing-7308 (SKF/NBC/FAG/Reputed make) |
| 210 | Replacement by providing & fitting of bearing-7309 (SKF/NBC/FAG/Reputed make) |
| 211 | Replacement by providing & fitting of bearing-6209 (SKF/NBC/FAG/Reputed make) |
| 212 | Replacement by providing & fitting of bearing-6212 (SKF/NBC/FAG/Reputed make) |
| 213 | Replacement by providing & fitting of bearing-6213 (SKF/NBC/FAG/Reputed make) |
| 214 | Replacement by providing & fitting of bearing NU-204 (SKF/NBC/FAG/Reputed make) |
| 215 | Replacement by providing & fitting of bearing NU-205 (SKF/NBC/FAG/Reputed make) |
| 216 | Replacement by providing & fitting of bearing NU-206 (SKF/NBC/FAG/Reputed make) |
| 217 | Replacement by providing & fitting of bearing NU-208 (SKF/NBC/FAG/Reputed make) |
| 218 | Replacement by providing & fitting of bearing NU-308 (SKF/NBC/FAG/Reputed make) |
| 219 | Replacement by providing & fitting of bearing NU-309 (SKF/NBC/FAG/Reputed make) |
| 220 | Replacement by providing & fitting of bearing N- 6305 (SKF/NBC/FAG/Reputed make) |
| 221 | Replacement by providing & fitting of bearing 6306-ZZ (SKF/NBC/FAG/Reputed make) |
| 222 | Replacement by providing & fitting of bearing 6307-ZZ (SKF/NBC/FAG/Reputed make) |
| 223 | Replacement by providing & fitting of bearing 6308-ZZ (SKF/NBC/FAG/Reputed make) |
| 224 | Replacement by providing & fitting of bearing 6309-ZZ (SKF/NBC/FAG/Reputed make) |
| 225 | Replacement by providing & fitting of bearing 6310-ZZ (SKF/NBC/FAG/Reputed make) |
| 226 | Replacement by providing & fitting of bearing 6311-ZZ (SKF/NBC/FAG/Reputed make) |
| 227 | Replacement by providing & fitting of bearing 6312-ZZ (SKF/NBC/FAG/Reputed make) |
| 228 | Replacement by providing & fitting of bearing 6313-ZZ (SKF/NBC/FAG/Reputed make) |
| 229 | Replacement by providing & fitting of bearing - 6314 (SKF/NBC/FAG/Reputed make) |
| 230 | Replacement by providing & fitting of bearing - 6315 (SKF/NBC/FAG/Reputed make) |
| 231 | Replacement by providing & fitting of bearing - 6316 (SKF/NBC/FAG/Reputed make) |
| 232 | Star Coupling Complete L-150 (Reputed Make) |
| 233 | Star Coupling Complete L-190 (Reputed Make) |
| 234 | Star Coupling Complete L-225 (Reputed Make) |
| 235 | Star Coupling Complete L-226 (Reputed Make) |
| 236 | Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (100 mm dia) |
| 237 | Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (125 mm dia) |
| 238 | Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (150 mm dia) |
| 239 | Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (175 mm dia) |
| 240 | Fabrication / providing of heavy duty MS coupling pulley set machined to exact size with cotters (200 mm dia) |
| 241 | Providing & fitting of 50 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 242 | Providing & fitting of 65 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 243 | Providing & fitting of 80 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 244 | Providing & fitting of 100 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 245 | Providing & fitting of 150 mm dia heavy duty ISI sluice valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 246 | Providing & fitting of 50 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 247 | Providing & fitting of 65 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 248 | Providing & fitting of 80 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 249 | Providing & fitting of 100 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 250 | Providing & fitting of 150 mm dia heavy duty ISI reflux valve C.I. (Kirloskar / Kartar / equivalent ISI make) |
| 251 | Fabrication & providing of MS Clamp 3\\" |
| 252 | Fabrication & providing of MS Clamp 4\\" |
| 253 | Providing of Gland Packing of assorted size 8mm, 10mm, 12mm (Champion/Reputed Make) |
| 254 | Providing of Rubber insertion Sheet (Reputed Make ) |
| 255 | Providing of Nut Bolts of assorted size & length (19 no.,21 no.,24 no. 27 no. etc.) |
| 256 | Providing of Puncher Roll (Reputed Make) |
| 257 | Providing of Insulation Tape (Reputed Make) |
| 258 | Providing of Grease |
| 259 | Providing of M-Oil for HC pumps |
| 260 | Mono Submersible pumps: Fabrication / fitting of neck ring. |
| 261 | Providing & fitting of New Impeller of brass. |
| 262 | Providing & fitting of New Impeller of C. I |
| 263 | Repair of the exisitng impeller of brass |
| 264 | Repair of the exisitng impeller of C.I |
| 265 | Providing and fitting of body casing. |
| 266 | Providing and fitting of pump cover NDE. |
| 267 | Repair to rotor of Horizontal Squirrel cage High Speed Induction Motors: 7.5 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job. |
| 268 | Repair to rotor of 10 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 269 | Repair to rotor of 12.5 HP induction motor.The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 270 | Repair to rotor of 15 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 271 | Repair to rotor of 20 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 272 | Repair to rotor of 25 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 273 | Repair to rotor of 30 HP induction motor.The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 274 | Repair to rotor of 35 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 275 | Repair to rotor of 40 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 276 | Repair to rotor of 50 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 277 | Repair to rotor of 60 HP induction motor.The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 278 | Repair to rotor of 75 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 279 | Repair to rotor of 80 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 280 | Repair to rotor of 100 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 281 | Repair to rotor of 125 HP induction motor. The job includes repairs to induction motor rotor shaft by turning, finishing to size & polishing, Fabrication & fitting of C.I. sleeves of exact size - 02 nos to end covers. P/F of bearings of reputed make at DE and NDE as per sample. P/F of studs, nuts and bolts in place of damaged studs/nuts/bolts as per requirement, Complete assembling of induction motor & testing at no load. Complete job |
| 282 | Rewinding of Submersible Motors along with providing & fitting of submersible cable leads, each of length 1 mtr. and of suitable specification. :Complete rewinding of 5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 283 | Complete rewinding of 7.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 284 | Complete rewinding of 10 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 285 | Complete rewinding of 12.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 286 | Complete rewinding of 15 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 287 | Complete rewinding of 17.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 288 | Complete rewinding of 20 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 289 | Complete rewinding of 22.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 290 | Complete rewinding of 25 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 291 | Complete rewinding of 27.5 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 292 | Complete rewinding of 30 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 293 | Complete rewinding of 35 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 294 | Complete rewinding of 40 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 295 | Complete rewinding of 45 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 296 | Complete rewinding of 50 HP submersible motor. The job includes repairs to submersible motor rotor shaft by turning, finishing & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of studs with nuts and T-bolts (08 nos.) in place of damaged studs/nuts/bolts as per requirement, Complete assembling of submersible motor & testing in the test pit. Complete job includes cost of material and labour charges. |
| 297 | Complete Rewinding of Induction motors: Disconnecting the electrical connections, disengaging the coupling pulley set, foot bolts of Horizontal Centrifugal Motor. |
| 298 | Carriage of the HC motor (to and fro) by head load nearest roadside and loading of the same into the mechanical transport for carriage to the workshop. for head load 0-1 km |
| 299 | for head load 1-3 kms |
| 300 | for head load > 3kms |
| 301 | Disassembling the Rotor & Stator of HC motor. (at work shop/at site) |
| 302 | Reconditioning of Rotor shaft by way of welding, turning and finishing as per required size. |
| 303 | Assembling the Rotor & Stator of HC motor. (at work shop/at site) |
| 304 | Fitting of Horizontal centrifugal motor on the base frame by way of engaging the coupling pulley set, fitting of foot bolts, making of electrical connections , making alignment with the pump and testing thereof . |
| 305 | Horizontal Squirrel cage High Speed Induction Motors: Complete rewinding of 10 HP induction motor. |
| 306 | Complete rewinding of 12.5 HP induction motor. |
| 307 | Complete rewinding of 15 HP induction motor. |
| 308 | Complete rewinding of 20 HP induction motor. |
| 309 | Complete rewinding of 25 HP induction motor. |
| 310 | Complete rewinding of 30 HP induction motor. |
| 311 | Complete rewinding of 35 HP induction motor. |
| 312 | Complete rewinding of 40 HP induction motor. |
| 313 | Complete rewinding of 50 HP induction motor. |
| 314 | Complete rewinding of 60 HP induction motor. |
| 315 | Complete rewinding of 70 HP induction motor. |
| 316 | Complete rewinding of 75 HP induction motor. |
| 317 | Complete rewinding of 80 HP induction motor. |
| 318 | Complete rewinding of 90 HP induction motor. |
| 319 | Complete rewinding of 100 HP induction motor. |
| 320 | Complete rewinding of 120 HP induction motor. |
| 321 | Complete rewinding of 125 HP induction motor. |
| 322 | Horizontal Squirrel cage Slow Speed (1440 RPM) Induction Motors: Complete rewinding of 10 HP slow speed induction motor. |
| 323 | Complete rewinding of 12.5 HP slow speed induction motor. |
| 324 | Complete rewinding of 15 HP slow speed induction motor. |
| 325 | Complete rewinding of 20 HP slow speed induction motor. |
| 326 | Complete rewinding of 25 HP slow speed induction motor. |
| 327 | Complete rewinding of 30 HP slow speed induction motor. |
| 328 | Complete rewinding of 35 HP slow speed induction motor. |
| 329 | Complete rewinding of 40 HP slow speed induction motor. |
| 330 | Complete rewinding of 50 HP slow speed induction motor. |
| 331 | Complete rewinding of 60 HP slow speed induction motor. |
| 332 | Complete rewinding of 70 HP slow speed induction motor. |
| 333 | Complete rewinding of 75 HP slow speed induction motor. |
| 334 | Complete rewinding of 80 HP slow speed induction motor. |
| 335 | Complete rewinding of 90 HP slow speed induction motor. |
| 336 | Complete rewinding of 100 HP slow speed induction motor. |
| 337 | Complete rewinding of 120 HP slow speed induction motor. |
| 338 | Complete rewinding of 125 HP slow speed induction motor. |
| 339 | Complete rewinding of 180 HP slow speed induction motor. |
| 340 | Complete Rewinding of motors of monosubmersible pumpset: 2 hp |
| 341 | 10 hp |
| 342 | Extraction/ Lowering of submersible pump set: Extraction of submersible pump set having G.I. / M.S. pipe flanged column assembly from deep bore tube wells and lowering of the repaired submersible pump set after coupling and jointing of submersible cable with the connection cables. Lowering the submersible pump along with column pipes one by one using chain pulley block (manually or by long boom crane). The flanges shall have to be tightened by placing rubber insertion sheets and suitable nuts, bolts and washers etc (nuts, bolts, washers, rubber insertion sheets, patch rolls, insulation tapes to be provided by contractor) with due care under the jurisdiction of Jal Shakti PHE Division Samba as per details below: Column pipes having 50 / 65 / 80 mm dia up to a depth of 30 meters (Pump dia 100 / 150 / 200 mm) |
| 343 | Column pipes having 50 / 65 / 80 mm dia up to a depth of 60 meters (Pump dia 100 / 150 / 200 mm) |
| 344 | Column pipes having 50 / 65 / 80 mm dia up to a depth of 130 meters (Pump dia 100 / 150 / 200 mm) |
| 345 | Column pipes having 100 mm dia up to a depth of 50 meters (Pump dia 150 / 200 mm) |
| 346 | Submersible pump set from the Dugwells / open wells. |
| 347 | Providing of additional lowering pipe of 2 inch dia and 10 feet length for submersible pumpset along with suitable size flanges welded on each end, rubber sheets, suitable nuts and bolts as per site requirement |
| 348 | Providing of additional lowering pipe of 2.5 inch dia and 10 feet length for submersible pumpset along with suitable size flanges welded on each end, rubber sheets, suitable nuts and bolts as per site requirement |
| 349 | Providing of additional lowering pipe of 3 inch dia and 10 feet length for submersible pumpset along with suitable size flanges welded on each end, rubber sheets, suitable nuts and bolts as per site requirement Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender