Tender For 1. Construction Of Community Soak Pit In Kokkumedu Colony Oht @ Thadaperumbakkam Panchayat 2.Construction Of Community Soak Pit In Kokkumedu Village Oht @ Thadaperumbakkam Panchayat 3.Construction Of Community Soak Pit In Singilimedu Colon
Tender Overview
Project Description
Tender for 1. Construction Of Community Soak Pit In Kokkumedu Colony Oht @ Thadaperumbakkam Panchayat 2.Construction Of Community Soak Pit In Kokkumedu Village Oht @ Thadaperumbakkam Panchayat 3.Construction Of Community Soak Pit In Singilimedu Colony Oht @ Thadaperumbakkam Panchayat 4.Construction Of Community Soak Pit In Singilimedu Village Oht @ Thadaperumbakkam Panchayat 5.Construction Of Community Soak Pit In Thadaperumbakkam Colony Oht @ Thadaperumbakkam Panchayat 6. Construction Of Community Soak Pit In Thadaperumbakkam Village Oht @ Thadaperumbakkam Panchayat 7. Construction Of Community Soak Pit In Thiruvenkadapuram Anna Street Oht @ Thadaperumbakkam Panchayat 8. Construction Of Community Soak Pit In Thiruvenkadapuram Sasthri Street Oht @ Thadaperumbakkam Panchayat 9. Construction Of Community Soak Pit In Sai Nagar T.H Road Oht @ Thadaperumbakkam Panchayat 10. Construction Of Community Soak Pit In Sai Nagar (Annamalai Nagar) Oht @ Thadaperumbakkam Panchayat 11. Construction Of Community Soak Pit In Ponniyamman Nagar Oht @ Thadaperumbakkam Panchayat 12. Construction Of Community Soak Pit In Pallavan Nagar Oht @ Thadaperumbakkam Panchayat 13. Construction Of Community Soak Pit In Kuyavermedu Oht @ Thadaperumbakkam Panchayat 14. Construction Of Community Soak Pit In Upparapalayam Oht @ Thadaperumbakkam Panchayat 15. Construction Of Community Soak Pit In Pon Nagar Oht @ Thadaperumbakkam Panchayat 16. Construction Of Community Soak Pit In Gandhi Nagar Oht @ Thadaperumbakkam Panchayat 17. Construction Of Community Soak Pit In Balamurugan Nagar Oht @ Thadaperumbakkam Panchayat 18. Construction Of Community Soak Pit In Balaji Nagar Oht @ Thadaperumbakkam Panchayat 19. Construction Of Community Soak Pit In Gayathri Nagar Oht @ Thadaperumbakkam Panchayat 20. Construction Of Community Soak Pit In Dasaradhan Nagar Oht @ Thadaperumbakkam Panchayat In Minjur Panchayat Union Under Sbm- Phase -Ii/2026 - 2027/Rd/Tvlr/Mjr01
BOQ
| Sl. No. | Item Description |
| 1 | 1. CONSTRUCTION OF COMMUNITY SOAK PIT IN KOKKUMEDU COLONY OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 3 | Filling the soak pit with 225mm Boulders Rough stone |
| 4 | Filling the soak pit with 40mm Metal |
| 5 | Filling the soak pit with 20mm Metal |
| 6 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 7 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 8 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 9 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 10 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 11 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 12 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 13 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 14 | Provision for Name Board Charges |
| 15 | 2.CONSTRUCTION OF COMMUNITY SOAK PIT IN KOKKUMEDU VILLAGE OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 16 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 17 | Filling the soak pit with 225mm Boulders Rough stone |
| 18 | Filling the soak pit with 40mm Metal |
| 19 | Filling the soak pit with 20mm Metal |
| 20 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 21 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 22 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 23 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 24 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 25 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 26 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 27 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 28 | Provision for Name Board Charges |
| 29 | 3.CONSTRUCTION OF COMMUNITY SOAK PIT IN SINGILIMEDU COLONY OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 30 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 31 | Filling the soak pit with 225mm Boulders Rough stone |
| 32 | Filling the soak pit with 40mm Metal |
| 33 | Filling the soak pit with 20mm Metal |
| 34 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 35 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 36 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 37 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 38 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 39 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 40 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 41 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 42 | Provision for Name Board Charges |
| 43 | 4. CONSTRUCTION OF COMMUNITY SOAK PIT IN SINGILIMEDU VILLAGE OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 44 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 45 | Filling the soak pit with 225mm Boulders Rough stone |
| 46 | Filling the soak pit with 40mm Metal |
| 47 | Filling the soak pit with 20mm Metal |
| 48 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 49 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 50 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 51 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 52 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 53 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 54 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 55 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 56 | Provision for Name Board Charges |
| 57 | 5. CONSTRUCTION OF COMMUNITY SOAK PIT IN THADAPERUMBAKKAM COLONY OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 58 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 59 | Filling the soak pit with 225mm Boulders Rough stone |
| 60 | Filling the soak pit with 40mm Metal |
| 61 | Filling the soak pit with 20mm Metal |
| 62 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 63 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 64 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 65 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 66 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 67 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 68 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 69 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 70 | Provision for Name Board Charges |
| 71 | 6. CONSTRUCTION OF COMMUNITY SOAK PIT IN THADAPERUMBAKKAM VILLAGE OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 72 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 73 | Filling the soak pit with 225mm Boulders Rough stone |
| 74 | Filling the soak pit with 40mm Metal |
| 75 | Filling the soak pit with 20mm Metal |
| 76 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 77 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 78 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 79 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 80 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 81 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 82 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 83 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 84 | Provision for Name Board Charges |
| 85 | 7. CONSTRUCTION OF COMMUNITY SOAK PIT IN THIRUVENKADAPURAM ANNA STREET OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 86 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 87 | Filling the soak pit with 225mm Boulders Rough stone |
| 88 | Filling the soak pit with 40mm Metal |
| 89 | Filling the soak pit with 20mm Metal |
| 90 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 91 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 92 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 93 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 94 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 95 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 96 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 97 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 98 | Provision for Name Board Charges |
| 99 | 8. CONSTRUCTION OF COMMUNITY SOAK PIT IN THIRUVENKADAPURAM SASTHRI STREET OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 100 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 101 | Filling the soak pit with 225mm Boulders Rough stone |
| 102 | Filling the soak pit with 40mm Metal |
| 103 | Filling the soak pit with 20mm Metal |
| 104 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 105 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 106 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 107 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 108 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 109 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 110 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 111 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 112 | Provision for Name Board Charges |
| 113 | 9. CONSTRUCTION OF COMMUNITY SOAK PIT IN SAI NAGAR T.H ROAD OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 114 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 115 | Filling the soak pit with 225mm Boulders Rough stone |
| 116 | Filling the soak pit with 40mm Metal |
| 117 | Filling the soak pit with 20mm Metal |
| 118 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 119 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 120 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 121 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 122 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 123 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 124 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 125 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 126 | Provision for Name Board Charges |
| 127 | 10. CONSTRUCTION OF COMMUNITY SOAK PIT IN SAI NAGAR (ANNAMALAI NAGAR) OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 128 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 129 | Filling the soak pit with 225mm Boulders Rough stone |
| 130 | Filling the soak pit with 40mm Metal |
| 131 | Filling the soak pit with 20mm Metal |
| 132 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 133 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 134 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 135 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 136 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 137 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 138 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 139 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 140 | Provision for Name Board Charges |
| 141 | 11. CONSTRUCTION OF COMMUNITY SOAK PIT IN PONNIYAMMAN NAGAR OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 142 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 143 | Filling the soak pit with 225mm Boulders Rough stone |
| 144 | Filling the soak pit with 40mm Metal |
| 145 | Filling the soak pit with 20mm Metal |
| 146 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 147 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 148 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 149 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 150 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 151 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 152 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 153 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 154 | Provision for Name Board Charges |
| 155 | 12. CONSTRUCTION OF COMMUNITY SOAK PIT IN PALLAVAN NAGAR OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 156 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 157 | Filling the soak pit with 225mm Boulders Rough stone |
| 158 | Filling the soak pit with 40mm Metal |
| 159 | Filling the soak pit with 20mm Metal |
| 160 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 161 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 162 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 163 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 164 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 165 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 166 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 167 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 168 | Provision for Name Board Charges |
| 169 | 13. CONSTRUCTION OF COMMUNITY SOAK PIT IN KUYAVERMEDU OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 170 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 171 | Filling the soak pit with 225mm Boulders Rough stone |
| 172 | Filling the soak pit with 40mm Metal |
| 173 | Filling the soak pit with 20mm Metal |
| 174 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 175 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 176 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 177 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 178 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 179 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 180 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 181 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 182 | Provision for Name Board Charges |
| 183 | 14. CONSTRUCTION OF COMMUNITY SOAK PIT IN UPPARAPALAYAM OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 184 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 185 | Filling the soak pit with 225mm Boulders Rough stone |
| 186 | Filling the soak pit with 40mm Metal |
| 187 | Filling the soak pit with 20mm Metal |
| 188 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 189 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 190 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 191 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 192 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 193 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 194 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 195 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 196 | Provision for Name Board Charges |
| 197 | 15. CONSTRUCTION OF COMMUNITY SOAK PIT IN PON NAGAR OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 198 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 199 | Filling the soak pit with 225mm Boulders Rough stone |
| 200 | Filling the soak pit with 40mm Metal |
| 201 | Filling the soak pit with 20mm Metal |
| 202 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 203 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 204 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 205 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 206 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 207 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 208 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 209 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 210 | Provision for Name Board Charges |
| 211 | 16. CONSTRUCTION OF COMMUNITY SOAK PIT IN GANDHI NAGAR OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 212 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 213 | Filling the soak pit with 225mm Boulders Rough stone |
| 214 | Filling the soak pit with 40mm Metal |
| 215 | Filling the soak pit with 20mm Metal |
| 216 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 217 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 218 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 219 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 220 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 221 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 222 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 223 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 224 | Provision for Name Board Charges |
| 225 | 17. CONSTRUCTION OF COMMUNITY SOAK PIT IN BALAMURUGAN NAGAR OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 226 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 227 | Filling the soak pit with 225mm Boulders Rough stone |
| 228 | Filling the soak pit with 40mm Metal |
| 229 | Filling the soak pit with 20mm Metal |
| 230 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 231 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 232 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 233 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 234 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 235 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 236 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 237 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 238 | Provision for Name Board Charges |
| 239 | 18. CONSTRUCTION OF COMMUNITY SOAK PIT IN BALAJI NAGAR OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 240 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 241 | Filling the soak pit with 225mm Boulders Rough stone |
| 242 | Filling the soak pit with 40mm Metal |
| 243 | Filling the soak pit with 20mm Metal |
| 244 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 245 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 246 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 247 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 248 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 249 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 250 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 251 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 252 | Provision for Name Board Charges |
| 253 | 19. CONSTRUCTION OF COMMUNITY SOAK PIT IN GAYATHRI NAGAR OHT @ THADAPERUMBAKKAM PANCHAYAT |
| 254 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 255 | Filling the soak pit with 225mm Boulders Rough stone |
| 256 | Filling the soak pit with 40mm Metal |
| 257 | Filling the soak pit with 20mm Metal |
| 258 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 259 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 260 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 261 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 262 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 263 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 264 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 265 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 266 | Provision for Name Board Charges |
| 267 | 20. CONSTRUCTION OF COMMUNITY SOAK PIT IN DASARADHAN NAGAR OHT @ THADAPERUMBAKKAM PANCHAYAT IN MINJUR PANCHAYAT |
| 268 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation complete as per standard specification. |
| 269 | Filling the soak pit with 225mm Boulders Rough stone |
| 270 | Filling the soak pit with 40mm Metal |
| 271 | Filling the soak pit with 20mm Metal |
| 272 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 273 | Cement Concrete 1:4:8 (Hard Broken stone) using 40 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. |
| 274 | Brick Work in CM 1:5 Mix Using C. Brick including cost conveyance and all labour charges etc. complete. |
| 275 | Plastering CM 1:5 Mix 12mm thick including cost conveyance and all labour charges etc. complete |
| 276 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
| 277 | Supply and Fixing of RCC Rings 600mm Dia for Leach Pit with Slab |
| 278 | Supply and Fixing of 0.45x0.45x0.45m size cement tank with cost etc |
| 279 | Supply and Fixing of 110mm rainwater downfall pipe Pvc Pipe includes all cost and conveyanc etc completed |
| 280 | Provision for Name Board Charges |
| 281 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender