Tender For Insertion Of New 100 Kva Transformer At Peringalam (Cw-4583-202627-25) Under Electrical Section East Kallada Of Electrical Division Kundara
Tender Overview
Project Description
Tender for Insertion Of New 100 Kva Transformer At Peringalam (Cw-4583-202627-25) Under Electrical Section East Kallada Of Electrical Division Kundara
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 07-Aug-2026 | Date extension corrigendum | Date | 18-Aug-2026 |
| 2 | 20-Aug-2026 | Date extension corrigendumII | Date | 02-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Erecting one 100 KVA Transformer to existing DP and giving connections , including loading from TMR/SRS/ other stacking place and unloading at site but excluding cost for transporting transformer |
| 2 | Transporting transformers by hired vehicle to a distance upto 5 km and carrying upto 2 transformers of 63/100/160/250 KVA Transformers / Ring main units excluding loading and unloading charges |
| 3 | Additional rate for providing one disc set , PG Clamp etc complete on any type of HT pole for making cut point |
| 4 | Fitting and erecting one HT Double pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing(excluding provision of earthing) |
| 5 | Fitting one additional 2.4m/3m channel cross arm (100X50X6mm) in existing 11 KV DP including conveyance of materials |
| 6 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site(transportation by any vehicle) |
| 7 | Fitting and erecting one HT PSC single pole in position including fitting cross arm , digging and back filling pit in ordinary soil (as per standards), drawing sufficient lenth of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing) |
| 8 | Fitting and erecting one HT double pole structure using PSC pole in position , providing 2 stays , fitting 8 channel cross arms , fitting AB switch, DO fuse, station class LA etc , drawing GI earthing leads (separate GI strip for LA through insulated conduit) to the ground, mounting of 100 KVA transformer on DP structure , clamping with transformer belt, fixing 2 way distribution box, DTR meter with box, giving all HT and LT connections upto OH lines fixing/sign writing all statutory display boards etc including digging and backfilling pit in ordinary soil excluding provision of pipe earthing , yard fencing and metalling |
| 9 | Loading one transformer ( upto and including 160 KVA from ground to any vehicle including conveyance upto 25 m at site |
| 10 | Providing strut using LT PSC pole including digging and back filling pit in ordinary soil |
| 11 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil and backfilling |
| 12 | Providing one coil earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 13 | Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators , refitting the same on the new pole binding etc complete |
| 14 | Dismantling ( without damage) one LT PSC/RCC pole after disconnecting stays, strut, etc.attached thereon and stacking the same |
| 15 | Dismantling (without damage) one LT PSC/RCC strut pole including removal of clamps and stacking |
| 16 | Fitting one set AB switch on existing DP , giving connection and drawing sufficient length of GI earthing leads to the ground for earthing excluding provision of earthing |
| 17 | Additional rate for refitting/redoing one disc set while renewing any type of 11 KV cut pole |
| 18 | Additional rate for reinstalling LT line on the renewed 11 KV pole having both HT and LT (HT/LT) lines |
| 19 | Fitting and providing one HT stay for 11 KV pole , including digging and backfilling pit in ordinary soil |
| 20 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling esisting cross arm and insulators ,refitting the same on new pole , binding etc complete |
| 21 | Erecting one LT PSC pole in position including digging and backfilling pit in ordinary soil |
| 22 | Additional rate for refitting/redoing one shackle set ,including reshackling one span, while renewing any type of LT pole |
| 23 | Stringing of one Km 3 Ph 11 KV line with XLPE insulated ACSR Raccoon or equivalent ( 3 conductors) after fitting insulators , binding conductors to pin insulators using suitable tie and anchoring with wedge type anchoring clamps including cutting and removing tree branches wherever necessary excluding cut point works |
| 24 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work |
| 25 | Transporting HT PSC poles by county boat/vallam upto 6 Km including loading and unloading charges and hire charge of country boat/vallam |
| 26 | Transporting one HT PSC pole by Hand cart -normally limited to 4 Km (excluding loading and unloading) |
| 27 | Providing concrete muffing of size 0.45X0.45X1.5m (0.5 m above GL and 1 m below GL ), Excavation 0.45X0.45X1 m ,concrete (1:3:6, 20 mm ) 0.45X0.45X1.5 m ,plastering (1:3) 12mm 0.45X0.45m X 5 sides |
| 28 | Providing one driven earth using GI earth pipe of size 38.1 mm dia 2.5 m length at minimum distance of 1.5 m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 9 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.