Defence Statutory Bodies & Commissions/Committees Closing in 3 days TDR #56633925

Tender For Provn Of External Works Services For Vertical Wind Tunnel At Af Stn Agra

Issued by Statutory Bodies & Commissions/Committees · Agra, Uttar Pradesh
Tender Value
2.47 Crore
Estimated cost
Bid Submission
14 Aug 2026
3 days left
EMD
3.22 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Agra → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Provn Of External Works Services For Vertical Wind Tunnel At Af Stn Agra

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 07-Aug-2026 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 14-Aug-2026

BOQ

Name of Work:- PROVN OF EXTERNAL WORKS SERVICES FOR VERTICAL WIND TUNNEL AT AF STN AGRA
Sl. No. Item Description
1Supply, installing, testing and commissioning outdoor type, Energy efficient Power Transformer, step down transformer, 33/11 KV,3 phase, 50 Hz Cycle, 3.15 MVA (3150 KVA), core type copper wound, oil immersed, naturally cooled, Oil natural, air natural (ONAN),complete with first filling of IS-335 ISI marked filtered and dehydrated transformer oil and other standard fitting/Accessories and 17 position on load tap changer (OLTC) (Tapping range +5%to -15% in steps of 1.25% Each) with remote tap cubical changer (RTCC) panel and automatic voltage regulator (AVR) DYN-11 (Vector Group). The Max voltage ratio HV/LV (36Kv/12Kv). Over voltage operating capability and duration 112.5% of rated voltage. Anticipated continuous loading of HV/LV continuous 110% rated current. HV power frequency (KV RMS)- 70. LV Power frequency (KV RMS)- 28. HV Impulse with stand voltage (KV peak) : 170 KV. LV Impluse with stand voltage (KV-75). The maximum temperature rise should not exceed 45 degree Celsius in oil and 55 degree Celsius in HV/LV winding when measured by resistance method after continuous full load run on an ambient temp. Standard IS :2026 with Copper wound and oil die electric strength more than 60 KV. Maximum no load loss in 3 Kw at rated voltage and frequency and maximum load loss in 17 KW at 75 deg celcius rated voltage and frequency . Load losses at rated Current & 75 Degree Celsius . Impedance - 6.25% complete all as specified and directed. The factory testing before dispatch of transformer will be carried out as nominated by Accepting Officer comprising of the following and including the base Plinth as per manufacturer recommendation :-
2Contd item No 1(a) On Load Tap Changer (OLTC) (b) Remote Tap Charger Control (RTCC) panel, Control & Relay (CR) panel alongwith indication panel and showing all necessary parameters of Transformer (c) Automatic Voltage Regulator (AVR). (d) Termination at 33 KV side outdoor bushing. Termination at 11 KV side -cable box and accessories. (e) Buchholz Relay double float type (having contacts for alarm and trip) alongwith suitable size of copper cable from Buchholz relay to control panel. (f) OTI (having contacts for Alarm & Trip) alongwith suitable size of copper cable upto control panel. (g) WTI (having contacts for Alarm & Trip) alongwith suitable size of copper cable upto control panel. (h) Marshalling box (having TTB only). (j) Oil conservator with filter type drain valve and oil level guage. (k) Dehydrating breather with first fill dehydrating agent (silica gel). (l) Explosive vent (m) Thermometer pocket on tank cover (n) One No 100 mm dia, dial type thermometer, vapour pressure type having range 0-120 degree Celsius with metal guard having maximum perimeter reading temperature indicator with resisting device for transformer. (o) Two earthing terminals. (p) Rating plate and terminal marking plate. (q) Oil level gauge. (r) Oil drain valve with plug. (s) Lifting lugs (t) Oil filling hole with cap/plug with connecting plate complete (u) Air release valve plug (v) Removable inspection opening on Top Cover. Please Enable Macros to View BoQ information
3Contd item No 1(a) On Load Tap Changer (OLTC) (b) Remote Tap Charger Control (RTCC) panel, Control & Relay (CR) panel alongwith indication panel and showing all necessary parameters of Transformer (c) Automatic Voltage Regulator (AVR). (d) Termination at 33 KV side outdoor bushing. Termination at 11 KV side -cable box and accessories. (e) Buchholz Relay double float type (having contacts for alarm and trip) alongwith suitable size of copper cable from Buchholz relay to control panel. (f) OTI (having contacts for Alarm & Trip) alongwith suitable size of copper cable upto control panel. (g) WTI (having contacts for Alarm & Trip) alongwith suitable size of copper cable upto control panel. (h) Marshalling box (having TTB only). (j) Oil conservator with filter type drain valve and oil level guage. (k) Dehydrating breather with first fill dehydrating agent (silica gel). (l) Explosive vent (m) Thermometer pocket on tank cover (n) One No 100 mm dia, dial type thermometer, vapour pressure type having range 0-120 degree Celsius with metal guard having maximum perimeter reading temperature indicator with resisting device for transformer. (o) Two earthing terminals. (p) Rating plate and terminal marking plate. (q) Oil level gauge. (r) Oil drain valve with plug. (s) Lifting lugs (t) Oil filling hole with cap/plug with connecting plate complete (u) Air release valve plug (v) Removable inspection opening on Top Cover. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56633925
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 2.47 Crore
LAST DATE 14-08-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Provn Of External Works Services For Vertical Wind Tunnel At Af Stn Agra
Basic Detail
Tender No 80025-52/E8
Bidding Type Tender
Location
City Agra
State Uttar Pradesh
Key Dates
Publish Date 07 Aug 2026
Submission Date 14 Aug 2026
Open Date 21 Aug 2026
Finance
Tender Value 2.47 Crore
Tender Fee 2000
EMD 3.22 Lakhs
Exemption Available
Document List
BOQ_874239.xls
e29581ae-0fa2-4e55-bc2f-2949a36e63c0.html
Retenderdocuments.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 14, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 3 days
Aug 14, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days
Aug 21, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_874239.xls

html

e29581ae-0fa2-4e55-bc2f-2949a36e63c0.html

pdf

Retenderdocuments.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders