Tender For Repair/ Maintenance/ Service Of B Vehicle Under Age E/M-Ii Of Ge(N) Mamun
Tender Value
10 Lakhs
Estimated cost
Bid Submission
13 Aug 2026
19 days left
EMD
20000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Pathankot → Punjab
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair/ Maintenance/ Service Of B Vehicle Under Age E/M-Ii Of Ge(N) Mamun
BOQ
| Sl. No. | Item Description |
| 1 | REPAIRS TO EICHER 10.75 |
| 2 | M&L Opening/Dismantaling Suspension System (Complete) from the EICHER 10.75 and replacement wornout part of Front Suspension Complete, Anti-Roll Bars, Rear Suspension worn out part complete, spring type Shock Absorbers, tension the leaf spring by heat process including adjustment the same as required with necessary Nut, Bolts, Washers and rubber gaskets including minor respect of parts etc.complete all as specified and as directed. MAKE : EICHER 10.75 or as approved. |
| 3 | M&L Brake Master Cylinder Kit suitable for EICHER 10.75 including Taking out existing Brake Master Cylinder Kit from the Vehicle, complete all as specified and as directed. MAKE : TVS/ TATA/BOSCH |
| 4 | Taking down Self Starter from EICHER 10.75 for Servicing/Overhauling at Contractor’s Workshop including replacement of worn out Pinoin, Varnish of Coil, Replacement of Solenoid Switch, Carbon Bush, Armature Winding and re-assembling with Engine, complete all as specified and as directed. MAKE : MICO/LUCAS. |
| 5 | M&L for Taking out front and rear wheels complete from vehicle, cleaning, polishing and overhauling of brake system (of 02X04 Nos of wheels) by providing new wheel cylinder kit 2xeach wheel and replacement brake shoe, brake liner, brake pipes complete (Make: TVS/Rane/Bosch), cleaning & polishing of wheel drum, greasing of front and rear and front wheels bearing, taking out complete each wheels, cleaning of each wheels/disc/rims after making smooth surface, re-assembling of wheels and re-fixing all parts & wheel from workshop complete with recommendations etc testing on complition for Eicher 10.75 complete all as as specified and directed. |
| 6 | M&L Taking down the existing Clutch System from EICHER 10.75, Replacement of Clutch Plate (MAKE : REPCO/ TATA ), Pressure Plate (MAKE : REPCO/ TATA /Value) With Bearing (MAKE : SKF/ REPCO/ TATA /Value) or as approved by GE/ Engineer-in-Charge and fixing to Vehicle, Testing on Complition for Smooth Working, complete all as specified and as directed. NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate. |
| 7 | Taking down complete differential assembly of EICHER 10.75 and replacement diffrential side gear,spider gear,ring gear,axle shafts ,drive pinion,change complete differential oil and testing on completion,complete all as specified and directed. |
| 8 | Taking down propeller shaft of EICHER 10.75 and replacement universal joint,U-joint spider,snap ring,intermediate shaft, bearings,roller bearing,oil rings,U- joint flange yoke,nut, bolt,washer, testing on completion,complete all as specified and directed. |
| 9 | M&L Opening Complete Window with Inner Flap, locking arrangement. Servicing and repairs for Opening and Closing of Window glass including replacement of locking system with complete machine, ,inner flap,Window Opening Handle from Inner and Outer Side, Window Mirror up and down Handle and re-fixing of all Parts, Testing on completion, complete all as specified and as directed.(as per sample) |
| 10 | Taking down unsv wiper blade and replacement wipper blade complete including service of motor.Make-TVS/LUCAS,Value. |
| 11 | M&L for replacement of Mud flap as per existing shape and size and models for EICHER10.75.complete all as specified and directed . |
| 12 | Removeing the existing wornout/ deteriaorated complete electrical wrining,disconnected the wiring from extisting lights/dashbored and replacement with new electrical wiring with all connection required with all minor thimbles of EICHER 10.75 complete all as specified and as directed. |
| 13 | S&F Plastic Foot Mat suitable for EICHER 10.75 including Taking out/down existing unserviceable mat, complete all as as specified and as directed. |
| 14 | M&L Horn complete Assembly as per existing Size/Shape) suitable for EICHER 10.75 including Taking down/out unserviceable Horn Assembly, complete all as specified and as directed. MAKE : MINDA,roots |
| 15 | M&L Side Indicator complete Assembly (Front) with Cover and Lamps of appropriate Wattage (as approved/ as per existing Size/Shape) suitable for EICHER 10.75 including Taking down/out unserviceable Front Side Indicator Assembly, complete all as specified and as directed. MAKE : LUCAS or as approved |
| 16 | M&L Tail Light Assembly Complete (Brake Light/ Side Indicator Light/ Parking Light) with Lamps of appropriate Wattage and suitable for EICHER 10.75, Testing on Completion including Taking down/out Unserviceable Tail Light Assembly, complete all as specified and as directed. MAKE : KK/LUCAS/TATA /Lumax |
| 17 | M&L Window Rear View Mirror (as approved/ as per existing) suitable for EICHER 10.75 including Taking down existing Window Rear View Mirror, complete all as as specified and as directed. MAKE : NEO GOLD/TATA |
| 18 | M&L repair/ servicing carefully Water Pump alongwith Waterbody Assembly with necessary Accessories for EICHER 10.75, Taking down unserviceable parts with existing water Shape/ size, refitting the same, testing on completion, complete all as specified and as directed. Make-TATA, TVS |
| 19 | S&F Alternator (as per existing), 12 Volt suitable for EiCHER 10.75 including removing existing Alternator, complete all as specified and as directed.MAKE : LUCAS/ MICO/TATA/BOSCH. |
| 20 | Removing the existing wornout complete seat front/rear and replacement with rexine super quality seat Covers suitable for EICHER 10.75 and fixing properly of driver seat,co driver seat and rear seat of Vehicle, complete all as specified and as directed. |
| 21 | M&L Taking down Complete Steering System from EICHER10.75 by Opening/ Dismantalling, Taking Out All Parts, Cleaning of Serviceable Parts and Replace-ment of worn out Parts (Steering Column, Tie Rod, Spindles, Universal Joints, Pitman arms, Steering Gear Box Assembly, Drag Link Assembly) and Re-assembling and Refixing with Vehicle and Testing on completion, complete all as as specified and as directed. MAKE : TATA /RANE/ZF or as approved NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate. |
| 22 | Supply & Filling Engine Oil 20W40 including Draining out the Outlived Engine Oil and Cleaning the Oil Sump, complete all as specified and as directed. MAKE : CASTROL/GULF/SERVO. |
| 23 | Servicing,washing and cleaning of vehicle model Eicher 10.75 at authorised workshop by replacment of fuel filters, oil filter, air filter, engine oil etc, greasing to all the moving part of the veh, checking all the electrical wiring of the veh with alignment of wheel and repalcement of any damaged as well as worn out minor parts. Note :- Engine oil will be issued and paid separately in relevent items of sch. |
| 24 | REPAIRS TO TATA 207 |
| 25 | M&L Taking down the existing Clutch System from TATA 207, Replacement of Clutch Plate (MAKE : REPCO/ TATA /VALUE), Pressure Plate (MAKE : REPCO/ TATA ), With Bearing (MAKE : SKF/ REPCO/ TATA /VALUE) or as approved by GE/ Engineer-in-Charge and fixing to Vehicle, Testing on Complition for Smooth Working, complete all as specified and as directed. NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate. |
| 26 | M&L Opening Self Starter from TATA 207 for Servicing/Overhauling at Contractor’s Workshop including replacement of worn out Pinoin, Varnish of Coil, Replacement of Solenoid Switch, Carbon Bush, Armature Winding and re-assembling with Engine, complete all as specified and as directed. MAKE : MICO/LUCAS /TVS/BOSCH. |
| 27 | M&L repair/ sevicing of Water Pump alongwith Waterbody Assembly with necessary Accessories for TATA 207, replacing unsv parts with existing shape/ size, re-fitting the same,testing on completion, complete all as specified and as directed. Make-Tata,Rane.Note - Cost of new parts will deem to be included in the quoted unit rate. |
| 28 | M&L Opening/Dismantaling Suspension System (Complete) from the TATA 207 and replacement wornout part of Front Suspension Complete, Anti-Roll Bars, Rear Suspension worn out part complete, spring type Shock Absorbers, tension the leaf spring by heat process including adjustment the same as required with necessary Nut, Bolts, Washers and rubber gaskets including minor respect of parts etc. complete all as specified and as directed. |
| 29 | M&L Opening Complete Window with Inner Flap, locking arrangement, Opening (Outer and Inner) arrangements of Tata 207. Servicing and repairs for Opening and Closing of Window glass including replacement of locking system with complete machine,inner flap, Window Opening Handle from Inner and Outer Side, Window Mirror up and down Handle and re-fixing of all Parts, Testing on completion, complete all as specified and as directed. NOTE : New Parts will be as per existing One and as approved by GE/ Engineer-in-Charge. |
| 30 | M&L Taking down Complete Gear Box from TATA 207 by Opening, Dismantalling, Taking out all Parts, Cleaning of serviceable Parts with Diesel, Replacement of Unserviceable Parts, Re-assembling Gear Box and Re-fixing with Vehicle,complete change gear oil as per requirment, Testing on completion for the smooth functioning of shifting of all Forward and Reverse Gear, complete all as specified and as directed. MAKE : TATA /ZF.NOTE : Cost of new parts will deem to be included in the quoted unit rate. Gear Oil will be issued withy respect item. |
| 31 | M&L Taking down Complete Steering System from TATA 207 by Opening/ Dismantalling, Taking Out All Parts, Cleaning of Serviceable Parts and Replace-ment of worn out Parts (Steering Column, Tie Rod, Spindles, Universal Joints, Pitman arms, Steering Gear Box Assembly, Drag Link Assembly) and Re-assembling and Refixing with Vehicle and Testing on completion, complete all as as specified and as directed. MAKE : MARUTI GENUINE/RANE/TATA. NOTE : Cost of new parts will deem to be included in the quoted unit rate. |
| 32 | M&L Taking out Front/Rear Wheels Complete from TATA 207, Cleaning, Polishing & Overhauling of Brake System (of 2x2 No. of Wheels) by providing new Wheel Cylinder Kit, Brake Shoe, Brake Liner, Brake Pipes Complete (MAKE : TVS/BOSCH/TATA ), Cleaning & Polishing of Wheel Drum, Greasing of Front and Rear Wheels Bearing, Taking out Tyres, Tubes of Each Wheels, Cleaning of Each Wheels/Disc/Rims and applying Two Coats of Anti-corrosive Paint after obtaining a Smooth Surface, Re-assembling of Wheels and Re-fixing all Parts including Wheel Alignment from Authorised Workshop, Testing on Completion, complete all as as specified and as directed. |
| 33 | M&L Brake Master Cylinder Kit suitable for TATA 207 including Taking out existing Leakage Brake Master Cylinder Kit from the Vehicle, complete all as specified and as directed. MAKE : TVS/ TATA /BOSCH. |
| 34 | Removing the existing wornout complete seat front/rear and replacement with rexine super quality seat Covers suitable for TATA 207 and fixing properly of driver seat,co driver seat and rear seat of Vehicle, complete all as specified and as directed. NOTE - Seat Covers will be as approved by GE/ Engineer-in-Charge. |
| 35 | M&L Steering Covers, Clutch,Gear, Brake & Accelerator Pedal Rubber Shoes and other Auxiliaries suitable for TATA 207 including removing existing steering Covers, Clutch, Brake & Accelerator Pedal Rubber Shoes, etc., complete all as specified and as directed.MAKE : KK/LUCAS/TATA |
| 36 | M&L Side Indicator complete Assembly (Front) with Cover and Lamps of appropriate Wattage (as per existing Size/Shape) suitable for TATA 207 including Taking down/out unserviceable Front Side Indicator Assembly, complete all as specified and as directed. MAKE : LUCAS . |
| 37 | M&L Tail Light Assembly Complete (Brake Light/ Side Indicator Light/ Parking Light) with Lamps of appropriate Wattage and suitable for TATA 207, Testing on Completion including Taking downout Unserviceable Tail Light Assembly, complete all as specified and as directed. MAKE : KK/LUCAS/TATA |
| 38 | M&L Window Rear View Mirror (as per existing) suitable for TATA 207 including Taking down existing Window Rear View Mirror, complete all as as specified and as directed. MAKE : NEO GOLD/TATA /LUMAX. |
| 39 | M&L Wheel/Tyre Top Plastic Cover with all neccessary Fittings (as approved/ as per existing Shape & Size) suitable for TATA 207 and Testing on Completion in Running Condition including Taking down existing Wheel/Tyre Top Plastic Cover, complete all as as specified and as directed. |
| 40 | S&F Alternator (as per existing/ approved), 12 Volt suitable for TATA 207 including removing existing unserviceable Alternator, complete all as specified and as directed.MAKE : LUCAS/ MICO or as approved |
| 41 | Supply & Filling Engine Oil 20W40 including Draining out the Outlived Engine Oil and Cleaning the Oil Sump, complete all as specified and as directed. MAKE : CASTROL/GULF/SERVO or equivalent as approved |
| 42 | Servicing,washing and cleaning of vehicle model TATA 207 at authorised workshop by replacement of fuel filters, oil filter, air filter, engine oil etc, greasing to all the moving part of the veh, checking all the electrical wiring/lights of the veh,alignment of tyres and repalcement of any damaged as well as worn out minor parts. Note :- Engine oil will be issued and paid separately in relevent items of sch. |
| 43 | M&L wipper blade complete including serviceing of motor including taking down unserviceable wiper blade complete all as specified and directed . |
| 44 | M&L for replacement of Mud flap as per existing shape and size and models for Tata 207 complete all as specified and directed . |
| 45 | M&L for Taking down the chocked radiator with hoses, clamps from the vehicle, supply and fixing of new radiator assembly Brazed Aluminium Plate & Bar Type of the existing dimensions, with hoses, clamps, radiator cap & testing on completion for Tata 207 . Make- Hexsol/Standard/Jodhpur. |
| 46 | M&L for opening and dismantling of Fuel Injection Pump from Vehicle TATA 207 carefully and replacement of unservicieable parts as per existing size and make for the following :- Plunger - 04 Nos. Fuel pipe line- 04 Nos. Delivery valve – 04 No. Bearing - 04 Nos. Bearing Bush – 04 Nos. Niddle valve– 04 Nos & grinding of nozzles complete and re-fixing the same and testing on completion complete all as speicifed and directed. |
| 47 | M&L for supply and fixing reflector of red colour suitable for Tata 207 complete all as specified and directed . |
| 48 | Removing the existing wornout/ deteriaorated complete electrical wrining,disconnected the wiring from extisting lights/dashbored and replacement with new electrical wiring with all connection required with all minor thimbles of Tata 207 complete all as specified and as directed. |
| 49 | REPAIRS OF OMNI CAR/ SWIFT DZIRE |
| 50 | M&L Taking down the existing Clutch System from omni car, Replacement of Clutch Plate (MAKE : REPCO/TATA), Pressure Plate (MAKE : REPCO/ TATA ), With Bearing (MAKE : SKF/ REPCO/ TATA ) and fixing to Vehicle, Testing on Complition for Smooth Working, complete all as specified and as directed. NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate. |
| 51 | Taking down complete differential assembly of omni car and replacement diffrential side gear,spider gear,ring gear,axle shafts drive pinion,change complete differential oil and testing on completion,complete all as specified and directed. |
| 52 | Taking down propeller shaft of omni car and replacement universal joint,U-joint spider,snap ring,intermidate shaft bearing,roller bearing,oil rings,U- joint flange yoke,nut, bolt,washer, testing on completion,complete all as specified and directed. |
| 53 | Servicing,washing and cleaning of vehicle model omni car at authorised workshop by replacment of fuel filters, oil filter, air filter, engine oil and alingnment of tyre with tuning of engine etc, greasing to all the moving part of the veh, checking all the electrical wiring of the veh and repalcement of any damaged as well as worn out minor parts.Note :- Engine oil will be issued and paid separately in relevent items of sch. |
| 54 | Supply & Filling Engine Oil 20W40 including Draining out the Outlived Engine Oil and Cleaning the Oil Sump, complete all as specified and as directed. MAKE : CASTROL/GULF/SERVO or equivalent as approved |
| 55 | S&F Plastic Foot Mat suitable for omni car including Taking out/down existing mat complete all as as specified and as directed. |
| 56 | M&L Opening Complete Window with Inner Flap, locking arrangement, Opening (Outer and Inner) arrangements of omni car. Servicing and repairs for Opening and Closing of Window glass including replacement of locking system with complete machine, inner flap,Window Opening Handle from Inner and Outer Side, Window Mirror up and down Handle and re-fixing of all Parts, Testing on completion, complete all as specified and as directed. |
| 57 | M&L Taking out Front/Rear Wheels Complete from omni car, Cleaning, Polishing & Overhauling of Brake System (of 2x2 No. of Wheels) by providing new Wheel Cylinder Kit, Brake Shoe, Brake Liner, Brake Pipes Complete (MAKE : TVS/BOSCH/TATA ), Cleaning & Polishing of Wheel Drum, Greasing of Front and Rear Wheels Bearing, Taking out Tyres, Tubes of Each Wheels, Cleaning of Each Wheels/Disc/Rims and applying Two Coats of Anti-corrosive Paint after obtaining a Smooth Surface, Re-assembling of Wheels and Re-fixing all Parts including Wheel Alignment, Testing on Completion, complete all as as specified and as directed. |
| 58 | REPAIR OF MOTOR CYCLE |
| 59 | Servicing,washing and cleaning motorcycle at authorised workshop by replacement of air filter, engine oil,plug etc, greasing to all the moving part of the veh, checking all the electrical wiring of the veh and repalcement of any damaged as well as worn out minor parts. Note :- Engine oil will be issued and paid separately in relevent items of sch. |
| 60 | Removing the existing wornout complete brake pad/brake shoe and replacement with new best quality brake pad/shoe as per suitable for Motorcycle complete all as specified and as directed. |
| 61 | M&L Taking down the existing Clutch System from motorcycle and replacement of Clutch Plate , clutch cover assembly, clutch rod or any other part needed to make clutch system functional. Testing on Complition for Smooth Working, complete all as specified and as directed. NOTE : Cost of New Parts will deem to be included in the Quoted Unit Rate. |
| 62 | Removing the existing wornout complete seat cover with foam and replacement with new rexine best quality seat Covers and foam suitable for motorcycle complete all as specified and as directed.Note :- Seat covers will be as approved by GE/ Engineer-in-Charge. |
| 63 | M&L for replacement of Grip covers,accelerator wire,brake wire,footrest pads,tool box cover,side indicators,side stand assembly as per existing shape and size and models for motorcycle complete all as specified and directed by GE/ Engineer-in-Charge. |
| 64 | M&L for replacement timing chain kit as per existing shape and size and models for suitable for motorcycle complete all as specified and directed . |
| 65 | M&L taking down front and rear shock absorber assembly to the motorcycle,cleaning of serviceable parts with petrol,replacement of unserviceable parts as per existing shape and refixing the all component to motorcycle, complete all as specified and directed . |
| 66 | M&L for replacement speedometer assembly as per existing shape and size and models and suitable for motorcycle Make of Hero Honda splender, complete all as specified and directed . |
| 67 | M&L for replacement main chain, sprocket set,dumper rubber,bearing set as per existing shape and size and models for suitable for motorcycle hero honda splender complete all as specified and directed . |
| 68 | M&L for replacement carburetor as per existing shape and size and models for suitable for motercycle complete all as specified and directed. |
| 69 | MISC ITEM FOR ALL TYPE OF VEHICLES |
| 70 | Replacement for existing battery capacity 12V 2.5/ 5AH, complete all as specified and directed.Make - Exide or Equivalent. |
| 71 | Replacement for existing battery capacity 12V 80AH, complete all as specified and directed.Make - Exide or Equivalent. |
| 72 | Supply & Greasing with Grease LG 280 suitable for ALL TYPE VEHICLES including cleaning old used Grease, complete all as specified and as directed. MAKE : CASTROL/ GULF |
| 73 | Supply & Filling Engine Oil 20W40 including Draining out the Outlived Engine Oil and Cleaning the Oil Sump, complete all as specified and as directed. MAKE : CASTROL/GULF/SERVO or equivalent as approved |
| 74 | Supply & Filling Brake Oil in 500 ml packing including Draining out the Outlived Brake Oil, complete all as specified and as directed. MAKE : BOSCH/ KBX/ TVS GRILLING |
| 75 | Supply & Filling Gear Oil in 80W-90W, including Draining out the Outlived gear Oil, complete all as specified and as directed. MAKE : CASTROL/GULF/HP |
| 76 | Supply & Filling Radiator Coolant, including Draining out used Radiator Coolent, complete all as specified and as directed. MAKE : CASTROL/ GOLDEN CRUISER/ SERVO |
| 77 | Supply only old cotton clothes saari width not less than 1.0 Mtr without any tearing suitable for cleaning of ALL TYPE VEHICLES, complete all as specified and as directed. |
| 78 | Supply & Filling Sulphuric Acid suitable for batteries, complete all as specified and as directed. |
| 79 | Supply & Filling Distilled Water for batteries, complete all as specified and as directed. |
| 80 | Supply & Fixing heavy duty brass attery terminals with existing copper lad/ battery for TATA 207/ Maruti Gupsy/ EICHER |
| 81 | Deduct : Total amount of SCH 'A' SECTION-II (SCH OF CREDIT) Rs. 8910.00 to be deducted from Schedule ‘A’ (BOQ) to arrive at the Contract Sum. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 23, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 13, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysAug 20, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 26 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender