Tender for Tender for Supply Of Decentralized Materials And Shiffting Dismantling Of 11 Kv Lt Line Which In The Construction Of Semara Chauraha To Gadbada Dham Block Halliya Under Deposit Scheme Of Edd Kachhawa Mirzapur
Tender Value
Ref. Documents
Estimated cost
Bid Submission
03 Aug 2026
5 days left
EMD
9700
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Mirzapur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Supply Of Decentralized Materials And Shiffting Dismantling Of 11 Kv Lt Line Which In The Construction Of Semara Chauraha To Gadbada Dham Block Halliya Under Deposit Scheme Of Edd Kachhawa Mirzapur
BOQ
| Sl. No. | Item Description |
| 1 | Supply of following Decentralized materials at the works site as per RESSPO norms |
| 2 | X-arms holding clamps with bolts & nuts for ST/PCC poles |
| 3 | Stone pad, 300x300x75 mm |
| 4 | F-bracket with bolts & nuts for ST/PCC poles |
| 5 | Clamps for Guarding Angle with nut & bolts for ST/PCC poles |
| 6 | PG clamps |
| 7 | All. Binding wire 6 mm |
| 8 | Danger Board with clamps & bolts for ST/PCC poles |
| 9 | E-bracket with nut & bolts |
| 10 | Barbed wire GI |
| 11 | Dead end clamp with nuts & bolts |
| 12 | Eye-Hook |
| 13 | Suspension clamp with nuts & bolts |
| 14 | J Hook |
| 15 | Three phase Distribution Box Clamp with nuts & bolts for ST/PCC poles |
| 16 | Three phase Distribution Box |
| 17 | Clamps for T/F (75x8 mm) |
| 18 | 11 KV TPMO set |
| 19 | 11 KV Fuse set |
| 20 | LT Fuse Set Protection unit with SMC box for 16 KVA T/F |
| 21 | LT Fuse Set Protection unit with SMC box for 63 KVA T/F |
| 22 | LT Fuse Set Protection unit with SMC box for 100 KVA T/F |
| 23 | LT incoming Pannel with metering equipment & fixing arragement |
| 24 | Clamps with nuts & bolts for various size Top /T-off./Dropper Channel, Fuse set & TPMO for ST/PCC poles |
| 25 | Stay clamp with nut & bolts for ST/PCC poles |
| 26 | Stay Insulator |
| 27 | Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge |
| 28 | ST Poles 11 mtr long |
| 29 | PCC Poles 8.5 mtr long |
| 30 | Line materials with ACSR Weasel Conductor |
| 31 | Arial Bunch Cable 3x95+1x70+1x16 mm2 |
| 32 | Erection |
| 33 | Erection of single support ST/PCC Pole for construction of 11 KV/LT line including digging of pit, fitting of all accessories, back filling of earth & others required work as per RESSPO norms. |
| 34 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 35 | Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 36 | Earthing of Poles as per RESSPO norms |
| 37 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering as per RESSPO norms |
| 38 | Laying, Streaching of Arial Bunch Cable size 3x95+1x70+1x16 mm2 as per RESSPO norms |
| 39 | Erection of Sectional Double Pole Structure of ST Pole for 11 KV Section, including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & other required works as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 40 | Erection of Sectional Double Pole Structure of ST Pole for distribution T/F, including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & other required works as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 41 | Drill/cut of stone in hilly area |
| 42 | Guarding of 11 KV line as per RESSPO norms |
| 43 | Shifting of 10 KVA Transformer at proposed site alongwith mounting as per RESSPO norms |
| 44 | Shifting of 16 KVA Transformer at proposed site alongwith mounting as per RESSPO norms |
| 45 | Shifting of 63 KVA Transformer at proposed site alongwith mounting as per RESSPO norms |
| 46 | Shifting of 100 KVA Transformer at proposed site alongwith mounting as per RESSPO norms |
| 47 | Dismantalling charge of old 11 KV line & poles |
| 48 | Dismantalling charge of old LT line & poles |
| 49 | Cartage charge of received back scrap ACSR Weasel Conductor from site to ESC, Mirzapur |
| 50 | Cartage charge of received back scrap AB Cable from site to ESC, Mirzapur |
| 51 | Cartage charge of received back scrap Iron from site to ESC, Mirzapur |
| 52 | Disconnection & re-connection of consumers |
| 53 | Installation of 11 KV TPMO set complete work as per RESSPO norms |
| 54 | Installation of 11 KV Fuse set complete work as per RESSPO norms |
| 55 | LT Fuse Set Protection unit with SMC box for 16/63/100 KVA T/F |
| 56 | Installation of LT incoming Pannel with metering equipment & fixing arragement as per RESSPO norms Installation of 11 KV Pilfer proof metering cubicle inside meter room, by fixing rag bolts after checking alignment with trench & conneting incomming & outgoing cable in the CT chamber Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 23, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 03, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysAug 04, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender