Tender For Construction Of Line And Installation Of Different Capacity Of Transformer In Jurisdiction Of Edsd- Sohawal, Rudauli And Patranga (Running Work) Under Electricity Distribution Division-Rudauli, Ayodhya.
Tender Value
25.69 Lakhs
Estimated cost
Bid Submission
05 Aug 2026
4 days left
EMD
25700
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ayodhya → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Line And Installation Of Different Capacity Of Transformer In Jurisdiction Of Edsd- Sohawal, Rudauli And Patranga (Running Work) Under Electricity Distribution Division-Rudauli, Ayodhya.
BOQ
| Sl. No. | Item Description |
| 1 | Part - A ( Material)Following Material Supplied by the Contractor:- |
| 2 | LT Clamp for ST Pole/PCC Pole |
| 3 | LT Shackle Insulator |
| 4 | Distribution Box Clamp |
| 5 | 11 KV Pin Insulator with Pin |
| 6 | 11 KV Disc Insulator with fitting |
| 7 | Top Channel Clamp |
| 8 | Dropper Channel |
| 9 | Dropper Channel Clamp |
| 10 | Tee- off Channel |
| 11 | 11 KV V type Cross Arm holding Clamp |
| 12 | 11 KV F Clamp for ST Pole |
| 13 | Nut & Bolt |
| 14 | Carriage including loading,unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 50 Kms. (distance approx) |
| 15 | S.T. Pole 9/11 Mtr. Long LT/HT |
| 16 | PCC Pole 11/13 Mtr. Long HT |
| 17 | PCC Pole 8.5/9.0 Mtr. Long LT/HT |
| 18 | AB Cable (1x16+1x25) sqmm |
| 19 | AB Cable (3x50+1x35+1x16) sqmm |
| 20 | Distribution Box Single Phase/Three Phase |
| 21 | ACSR Weasel Conductor |
| 22 | ACSR Dog Conductor |
| 23 | Transformer 10/16 KVA |
| 24 | Transformer 25 KVA |
| 25 | Transformer 63 KVA |
| 26 | Transformer 100 KVA |
| 27 | Transformer 250 KVA |
| 28 | Transformer 400/630 KVA |
| 29 | 11 KV XLPE Cable 3x70/3x120/3x185/3x300 sqmm |
| 30 | 11 KV Cable Jointing kit outdoor 3x70/3x120/3x185/3x300 sqmm |
| 31 | 33 KV XLPE Cable 3x300 sqmm |
| 32 | 33 KV Cable Jointing Kit |
| 33 | 33 KV Staight Through of Size |
| 34 | 11 KV Staight Through of Size |
| 35 | 11 KV Pilfer Proof Metring Cubical |
| 36 | Other Line material i.e. cross arm/conductor/pin/ insulator/stay/earthing/cable Box etc. A.B. Cable |
| 37 | Dragging of PCC/ST pole as per RESPO Norms. |
| 38 | Fabrication and Erection of Single Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, Sand & Brick Ballast & including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. ( Cost of clamps borne by contractor) |
| 39 | Fabrication and Erection of Double Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, Sand & Brick Ballast & including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. ( Cost of clamps borne by contractor) |
| 40 | Fabrication and Erection of Four Pole Support on PCC/ST Pole including grouting with 1:4:8 ratio Cement, Sand & Brick Ballast & including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. ( Cost of clamps borne by contractor) |
| 41 | Grouting and Binding of Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms. |
| 42 | Earthing of Poles as per RESPO Norms. |
| 43 | Stringing, Sagging, Binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms. |
| 44 | Stringing, Sagging, Binding and jumpering of ACSR Dog Conductor as per RESSPO Norms. |
| 45 | Stringing, Sagging, Binding and jumpering of AB Cable Single Phase Size (1x16+1x25) as per RESSPO Norms. |
| 46 | Stringing, Sagging, Binding and jumpering of AB Cable Single Phase Size (3x50+1x35+1x16) sqmm as per RESSPO Norms. |
| 47 | Erection & Commissioning of Single/Three Phase Distribution Box with help of clamps (Cost of clamp & Bolt & Nut shall be borne by contactor) as per Norms. |
| 48 | Laying of underground 11 KV 3x70/3x120/3x185/3x300 sq mm XLPE Cable in Normal Soil by digging of trench 1050 mm deep, 500 mm wide including supply of required material as fine sand, Ist class bricks as per norms. (All the material will be supplied by the contractor except 11 KV XLPE cable) |
| 49 | Hanaging, Hosting & clamping of G.I. Pipe, channel, nut & Bolt 3x7 mm2 XLPE 11 KV cable as per RESSPO Norms (cost of all accessories will be borne by contracotr) |
| 50 | Installation of Heat Shrinkable Type cable jointing kits outdoor end Termination suitable for 11 KV XLPE Cable 3x70/3x120/3x185/3x300 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.) |
| 51 | Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 11 KV XLPE cable 3x70 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.) |
| 52 | Transformer 10/16 KVA |
| 53 | Transformer 25 KVA |
| 54 | Transformer 63 KVA |
| 55 | Transformer 100 KVA |
| 56 | Transformer 250 KVA |
| 57 | Transformer 400/630 KVA |
| 58 | Installation of 11 KV Pilfer Proof Metering Cubical |
| 59 | Earthing by way of boring and lowering of \\"B\\" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.) |
| 60 | Construction of Plinth of 250 KVA Transformer including excavation of foundation, base concreting of 1:6:12 (Cement mortar of Ratio 1:4 foundation, CC in 1:4:8 ratio (Cement fine sand and brick ballast ) and RCC work with ratio 1:2:4 Cement, Coarse sand and Stone Grit of 20 mm gause as per RESSPO norms |
| 61 | Fencing of Transformer Plinth 250 KVAwith the help of wire mesh/Barbed wire after grouting proper size of angle as per RESSPO Norms. Inclusive of all material such as Wiremesh/Barbed Wire, Angle Flats, Nut Bolts etc. |
| 62 | Supply and Installation of G.I. Pipe 6\\" dia. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 23, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 05, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysAug 06, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender