Power Government Departments Closing in 8 days TDR #56621126

Work Related To Providing Electricity Connections And Electrification Under The Mla Fund Within The Electricity Distribution Division, Robertsganj, On A Year-Round Basis Via A Running Tender. (Semi-Turnkey)

Issued by Government Departments · Sonbhadra, Uttar Pradesh
Tender Value
26.96 Lakhs
Estimated cost
Bid Submission
03 Aug 2026
8 days left
EMD
27000
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Sonbhadra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Work Related To Providing Electricity Connections And Electrification Under The Mla Fund Within The Electricity Distribution Division, Robertsganj, On A Year-Round Basis Via A Running Tender. (Semi-Turnkey)- 1 Centralized Materials,Loading Unloading & Safe Cartage And Errection Of New Stp/Pcc Poles And Other Materials From Electricity Store Center, Robertsganj To The Work Place And Proper Stocking. (Distance Up To 50 Km.) 2 Pcc Pole 8.5 Mtr 3 11 Kv V-Type X-Arm 4 Top Channel Ms 100X50X2240 Mm. Long 5 Acsr Weasel Conductor 6 Stay Complete 7 10 Kva T/F 8 25 Kva T/F 9 63 Kva T/F 10 Dropper Channel Ms 100X50X2000 Mm 11 Lt Ab Cable 1X25+1X16 Sq Mm 12 11 Kv T-Off Channel 13 S/S Base Angle 14 Earthing Complete 15 De-Centralized Materials, Provided Contractor 16 11 Kv Polymeric Pin Insulator With Pin 17 11 Kv Polymeric Disc Insulator With Fitting 18 Top, T-Off Dropper Clamp With Nut Bolt 19 Cross Arm Holding Clamp 20 Pg Clamp 21 Lt Shackle Insulator 22 Lt Shackle Insulator For Clamp Nut & Bolt 23 I Hook With Dead End Clamp 24 I Hook With Suspenstion Clamp 25 F- Clamp 26 Nut & Bolt Washear 27 Stone Pad 28 Clamp For T/F 29 Clamp With Nut & Bolt 30 Work Of Following Materials As Per Resspo/Puvvnl Norms At The Work Site. 31 Erection Of Single Support St/Pcc Pole For Construction Of 11 Kv Line Including Digging Of Pit, Fitting Of All Accessories, Back Filling Of Earth & Others Required Work. 32 Grouting Of Pole With 1:4:8 Ratio Of Cement Sand & Brick Ballast As Per Resspo Norms. (Cement Sand & Brick Ballast Wil Be Supplied By The Constractor On His Own His Own Cost) 33 Grouting Of Stay With 1:4:8 Ratio Of Cement Sand & Brick Ballast As Per Resspo Norms. (Cement Sand & Brick Ballast Wil Be Supplied By The Constractor On His Own His Own Cost) 34 Earthing Complete 35 Stringing & Sagging Of 3 Phase 11 Kv Line Upto Proper Sag Including Laying Of Weasel Al Conductor, Binding With Insulators & Jumpering.

BOQ

Name of Work:- fo|qr forj.k [k.M jkoV~Zlxat ds vUrxZr okZ Ik;ZUr fo/kk;d fuf/k ds v/khu dk;ksZ dks jfuxa Vs.Mj ds ek/;e ls fo|qr dusDku ,oa fo|qrhdj.k djk;s tkus dk dk;ZA¼lseh VuZdh½
Sl. No. Item Description
1CENTRALIZED MATERIALS,Loading unloading & safe cartage and errection of new STP/PCC Poles and other materials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 50 Km.)
2PCC Pole 8.5 Mtr
311 KV V-type X-Arm
4Top Channel MS 100x50x2240 MM. Long
5ACSR Weasel Conductor
6Stay Complete
710 KVA T/F
825 KVA T/F
963 KVA T/F
10Dropper Channel MS 100x50x2000 MM
11LT AB Cable 1x25+1x16 SQ MM
1211 KV T-off Channel
13S/S Base Angle
14Earthing Complete
15DE-CENTRALIZED MATERIALS, Provided Contractor
1611 KV Polymeric Pin Insulator with Pin
1711 KV Polymeric Disc Insulator with Fitting
18Top, T-off Dropper Clamp with Nut Bolt
19Cross Arm Holding Clamp
20PG Clamp
21LT Shackle Insulator
22LT Shackle Insulator for Clamp Nut & Bolt
23I Hook With Dead End Clamp
24I Hook With Suspenstion Clamp
25F- Clamp
26Nut & Bolt Washear
27Stone Pad
28Clamp for T/F
29Clamp with Nut & Bolt
30Work of following materials as Per RESSPO/PuVVNL norms at the work site.
31Erection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work.
32Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
33Grouting of stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
34Earthing Complete
35Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of WEASEL AL Conductor, binding with insulators & jumpering.
3610 KVA T/F
3725 KVA T/F
3863 KVA T/F
39LT AB Cable 1x25+1x16 SQ MM Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56621126
AUTHORITY Government Departments
TENDER VALUE 26.96 Lakhs
LAST DATE 03-08-2026
Authority
Authority Name Purvanchal Vidyut Vitaran Nigam Limited
Work Description Work Related To Providing Electricity Connections And Electrification Under The Mla Fund Within The Electricity Distribution Division, Robertsganj, On A Year-Round Basis Via A Running Tender. (Semi-Turnkey)- 1 Centralized Materials,Loading Unloading & Safe Cartage And Errection Of New Stp/Pcc Poles And Other Materials From Electricity Store Center, Robertsganj To The Work Place And Proper Stocking. (Distance Up To 50 Km.) 2 Pcc Pole 8.5 Mtr 3 11 Kv V-Type X-Arm 4 Top Channel Ms 100X50X2240 Mm. Long 5 Acsr Weasel Conductor 6 Stay Complete 7 10 Kva T/F 8 25 Kva T/F 9 63 Kva T/F 10 Dropper Channel Ms 100X50X2000 Mm 11 Lt Ab Cable 1X25+1X16 Sq Mm 12 11 Kv T-Off Channel 13 S/S Base Angle 14 Earthing Complete 15 De-Centralized Materials, Provided Contractor 16 11 Kv Polymeric Pin Insulator With Pin 17 11 Kv Polymeric Disc Insulator With Fitting 18 Top, T-Off Dropper Clamp With Nut Bolt 19 Cross Arm Holding Clamp 20 Pg Clamp 21 Lt Shackle Insulator 22 Lt Shackle Insulator For Clamp Nut & Bolt 23 I Hook With Dead End Clamp 24 I Hook With Suspenstion Clamp 25 F- Clamp 26 Nut & Bolt Washear 27 Stone Pad 28 Clamp For T/F 29 Clamp With Nut & Bolt 30 Work Of Following Materials As Per Resspo/Puvvnl Norms At The Work Site. 31 Erection Of Single Support St/Pcc Pole For Construction Of 11 Kv Line Including Digging Of Pit, Fitting Of All Accessories, Back Filling Of Earth & Others Required Work. 32 Grouting Of Pole With 1:4:8 Ratio Of Cement Sand & Brick Ballast As Per Resspo Norms. (Cement Sand & Brick Ballast Wil Be Supplied By The Constractor On His Own His Own Cost) 33 Grouting Of Stay With 1:4:8 Ratio Of Cement Sand & Brick Ballast As Per Resspo Norms. (Cement Sand & Brick Ballast Wil Be Supplied By The Constractor On His Own His Own Cost) 34 Earthing Complete 35 Stringing & Sagging Of 3 Phase 11 Kv Line Upto Proper Sag Including Laying Of Weasel Al Conductor, Binding With Insulators & Jumpering.
Basic Detail
Tender No 39/EDC(SO)/2026-27
Bidding Type Tender
Location
City Sonbhadra
State Uttar Pradesh
Key Dates
Publish Date 22 Jul 2026
Submission Date 03 Aug 2026
Open Date 04 Aug 2026
Finance
Tender Value 26.96 Lakhs
Tender Fee 3540
EMD 27000
Exemption Not Available
Document List
8bf2fe37-6e47-4738-84fa-be068956407e.html
BOQ_2199512.xls
Technical.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 22, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 03, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Aug 04, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
html

8bf2fe37-6e47-4738-84fa-be068956407e.html

xls

BOQ_2199512.xls

pdf

Technical.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders