Tender For Execution Of Works Related To Electricity Connections And Electrification Under The Mp Fund Throughout The Year Within The Robertsganj Electricity Distribution Division, Carried Out Via Running Tenders (Semi-Turnkey).
Tender Overview
Project Description
Tender For Execution Of Works Related To Electricity Connections And Electrification Under The Mp Fund Throughout The Year Within The Robertsganj Electricity Distribution Division, Carried Out Via Running Tenders (Semi-Turnkey).--- 1 Centralized Materials,Loading Unloading & Safe Cartage And Errection Of New Stp/Pcc Poles And Other Materials From Electricity Store Center, Robertsganj To The Work Place And Proper Stocking. (Distance Up To 50 Km.) 2 Pcc Pole 11 Mtr Long 3 Pcc Pole 8.5 Mtr 4 11 Kv V-Type X-Arm 5 Top Channel Ms 100X50X2240 Mm. Long 6 Acsr Weasel Conductor 7 Stay Complete 8 10 Kva T/F 9 25 Kva T/F 10 63 Kva T/F 11 Dropper Channel Ms 100X50X2000 Mm 12 Lt Ab Cable 1X25+1X16 Sq Mm 13 11 Kv T-Off Channel 14 Distribtuion Box 15 Gi Wire 6/10 Swg 16 S/S Base Angle 17 11 Kv Polymeric Pin Insulator With Pin 18 11 Kv Polymeric Disc Insulator With Fitting 19 Earthing Complete 20 De-Centralized Materials, Provided Contractor 21 Danger Board With Nut/Bolt 22 Barbed Wire 23 Distribution Clamp 24 Cross Arm Holding Clamp 25 Pg Clamp 26 I Hook With Dead End Clamp 27 I Hook With Suspenstion Clamp 28 F- Clamp 29 Top, T-Off Dropper Angle Clamp With Nut Bolt 30 Nut & Bolt Washear 31 Stone Pad 32 Clamp For T/F 33 Clamp With Nut & Bolt 34 Work Of Following Materials As Per Resspo/Puvvnl Norms At The Work Site. 35 Erection Of Single Support St/Pcc Pole For Construction Of 11 Kv Line Including Digging Of Pit, Fitting Of All Accessories, Back Filling Of Earth & Others Required Work. 36 Grouting Of Pole With 1:4:8 Ratio Of Cement Sand & Brick Ballast As Per Resspo Norms. (Cement Sand & Brick Ballast Wil Be Supplied By The Constractor On His Own His Own Cost) 37 Grouting Of Stay With 1:4:8 Ratio Of Cement Sand & Brick Ballast As Per Resspo Norms. (Cement Sand & Brick Ballast Wil Be Supplied By The Constractor On His Own His Own Cost) 38 Earthing Complete 39 Stringing & Sagging Of 3 Phase 11 Kv Line Upto Proper Sag Including Laying Of Weasel Al Conductor, Binding With Insulators & Jumpering. 40 10 Kva T/F
BOQ
| Sl. No. | Item Description |
| 1 | CENTRALIZED MATERIALS,Loading unloading & safe cartage and errection of new STP/PCC Poles and other materials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 50 Km.) |
| 2 | PCC Pole 11 Mtr Long |
| 3 | PCC Pole 8.5 Mtr |
| 4 | 11 KV V-type X-Arm |
| 5 | Top Channel MS 100x50x2240 MM. Long |
| 6 | ACSR Weasel Conductor |
| 7 | Stay Complete |
| 8 | 10 KVA T/F |
| 9 | 25 KVA T/F |
| 10 | 63 KVA T/F |
| 11 | Dropper Channel MS 100x50x2000 MM |
| 12 | LT AB Cable 1x25+1x16 SQ MM |
| 13 | 11 KV T-off Channel |
| 14 | Distribtuion Box |
| 15 | GI Wire 6/10 SWG |
| 16 | S/S Base Angle |
| 17 | 11 KV Polymeric Pin Insulator with Pin |
| 18 | 11 KV Polymeric Disc Insulator with Fitting |
| 19 | Earthing Complete |
| 20 | DE-CENTRALIZED MATERIALS, Provided Contractor |
| 21 | Danger Board with Nut/Bolt |
| 22 | Barbed Wire |
| 23 | Distribution Clamp |
| 24 | Cross Arm Holding Clamp |
| 25 | PG Clamp |
| 26 | I Hook With Dead End Clamp |
| 27 | I Hook With Suspenstion Clamp |
| 28 | F- Clamp |
| 29 | Top, T-off Dropper Angle Clamp with Nut Bolt |
| 30 | Nut & Bolt Washear |
| 31 | Stone Pad |
| 32 | Clamp for T/F |
| 33 | Clamp with Nut & Bolt |
| 34 | Work of following materials as Per RESSPO/PuVVNL norms at the work site. |
| 35 | Erection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work. |
| 36 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 37 | Grouting of stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) |
| 38 | Earthing Complete |
| 39 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of WEASEL AL Conductor, binding with insulators & jumpering. |
| 40 | 10 KVA T/F |
| 41 | 25 KVA T/F |
| 42 | 63 KVA T/F |
| 43 | LT AB Cable 1x25+1x16 SQ MM |
| 44 | Distribtuion Box Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender