Housing Urban and Rular Development Local Bodies Closing in 12 days TDR #56618912

Tender For Strengthening And 5 Year Maintenance Of 2 Road Work In Package No: Tn-Kkm-06 In Munchirai Block Under Nabard Ridf 2026-27

Issued by Local Bodies · Kanniyakumari, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
06 Aug 2026
12 days left
EMD
1.55 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kanniyakumari → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Strengthening And 5 Year Maintenance Of 2 Road Work In Package No: Tn-Kkm-06 In Munchirai Block Under Nabard Ridf 2026-27

BOQ

Name of Work:- Strengthening and 5 Year Maintenance of 2 Road work in Package No: TN-KKM-06 in Munchirai Block under NABARD RIDF 2026-27
Sl. No. Item Description
1Strengthening of Thachakodu Manavilagam Korottorkulam via vazapalli road in Adaikkakuzhi Panchayat of Munchirai Panchayat Union KM 0/0-1/730R -115 VPR
2Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
3Earthwork Excavation for formation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A
4Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools etc.
5collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
6Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
7Km 0/0-1/0
8Km 1/0-1/730
9Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
10Km 0/0-1/0
11Km 1/0-1/730
12Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
13Km 0/0-1/0
14Km 1/0-1/730
15BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
16Km 0/0-1/0
17Km 1/0-1/730
18Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
19Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
20Provision of 15nos Rumble Strips Coverd with Premix bituuminous carpet 15.20mm high at Centrre 250mm wide placed at 1 cm centre at approved at location to controll speed marked with white strips of road marking paint.
21Sub Estimate Proctetive wall
22Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
23Cement Concrete 1:4:8 one cement, Four Crusser Stone sand and Eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
24Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
25Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
26Sub Estimate CC Pavement KM 0/0 - 1/0
27Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
28Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
29Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
30Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
31Supplying and erecting for sides and soffits including supports and strutting for plane surfaces in all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffered welded with mild angles of size 25x25x3mm for boarding laid over silver oak joists of size 10cmx65cm dia spaced at 75cm centre to centre etc, complete complying with standard specification and as directed for the following items, R.C.C. floor slab, bench slab all RCC works.
32Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
33Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
34Sub Estimate CC Pavement KM 1/0 - 1/730
35Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
36Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
37Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
38Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
39Supplying and erecting for sides and soffits including supports and strutting for plane surfaces in all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffered welded with mild angles of size 25x25x3mm for boarding laid over silver oak joists of size 10cmx65cm dia spaced at 75cm centre to centre etc, complete complying with standard specification and as directed for the following items, R.C.C. floor slab, bench slab all RCC works.
40Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
41Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
4260 cm Equilateral Triangle Cautionary Sign Board
43Road Marking / Road Stud with Lens Reflector
44Providing and laying of hot applied Thermoplastic Compound 2.5mnm thick including with reflectorising glass beads as per IRC : 35. The finished surface to be level uniform and free from streaks and holes etc. complete as per MORTH & H Specification No. 803
45MAINTENANCE OF NABARD ROADS
46For the First Year from the date of completion of work
47For the Second Year from the date of completion of work
48For the Third Year from the date of completion of work
49For the Fourth Year from the date of completion of work
50For the Fifth Year from the date of completion of work
51Strengthening of vattavilai sundavilai road km 0/0-1/5 R -135 in choozal Village Panchayat in Munchirai Union .
52Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
53Earthwork Excavation for formation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A
54Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools etc.
55collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
56Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
57Km 0/0-1/0
58Km 1/0-1/500
59Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
60Km 0/0-1/0
61Km 1/0-1/500
62Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
63Km 0/0-1/0
64Km 1/0-1/500
65BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
66Km 0/0-1/0
67Km 1/0-1/500
68Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
69Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
70Provision of 15nos Rumble Strips Coverd with Premix bituuminous carpet 15.20mm high at Centrre 250mm wide placed at 1 cm centre at approved at location to controll speed marked with white strips of road marking paint.
71Sub Estimate Proctetive wall 1
72Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
73Cement Concrete 1:4:8 one cement, Four Crusser Stone sand and Eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
74Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
75Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
76Sub Estimate Proctetive wall 2
77Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
78Cement Concrete 1:4:8 one cement, Four Crusser Stone sand and Eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
79Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
80Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
81Sub Estimate CC Pavement KM 0/0 - 1/0
82Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
83Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
84Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
85Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
86Supplying and erecting for sides and soffits including supports and strutting for plane surfaces in all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffered welded with mild angles of size 25x25x3mm for boarding laid over silver oak joists of size 10cmx65cm dia spaced at 75cm centre to centre etc, complete complying with standard specification and as directed for the following items, R.C.C. floor slab, bench slab all RCC works.
87Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
88Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
89Sub Estimate CC Pavement KM 1/0 - 1/500
90Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
91Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
92Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
93Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
94Supplying and erecting for sides and soffits including supports and strutting for plane surfaces in all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffered welded with mild angles of size 25x25x3mm for boarding laid over silver oak joists of size 10cmx65cm dia spaced at 75cm centre to centre etc, complete complying with standard specification and as directed for the following items, R.C.C. floor slab, bench slab all RCC works.
95Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
96Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
9760 cm Equilateral Triangle Cautionary Sign Board
98Road Marking / Road Stud with Lens Reflector
99Providing and laying of hot applied Thermoplastic Compound 2.5mnm thick including with reflectorising glass beads as per IRC : 35. The finished surface to be level uniform and free from streaks and holes etc. complete as per MORTH & H Specification No. 803
100MAINTENANCE OF NABARD ROADS
101For the First Year from the date of completion of work
102For the Second Year from the date of completion of work
103For the Third Year from the date of completion of work
104For the Fourth Year from the date of completion of work
105For the Fifth Year from the date of completion of work
106GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56618912
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 06-08-2026
Authority
Authority Name Rural Development And Panchayats Department
Work Description Tender for Strengthening And 5 Year Maintenance Of 2 Road Work In Package No: Tn-Kkm-06 In Munchirai Block Under Nabard Ridf 2026-27
Basic Detail
Tender No A4/488/2026 dated 20.07.2026
Bidding Type Tender
Location
City Kanniyakumari
State Tamil Nadu
Key Dates
Publish Date 23 Jul 2026
Submission Date 06 Aug 2026
Open Date 06 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 1.55 Lakhs
Exemption Not Available
Document List
4a84c7f8-6c21-491c-806f-200203866d10.html
BOQ_827001.xls
NABARD_Price_Bid.pdf
NBARD_Technical_bid.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 06, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Aug 06, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 12 days

Tender Documents

Download All (ZIP) ↓
html

4a84c7f8-6c21-491c-806f-200203866d10.html

xls

BOQ_827001.xls

pdf

NABARD_Price_Bid.pdf

pdf

NBARD_Technical_bid.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders