Tender For A) Complete Repairing And Rewinding Of 01 Mva ,11Kv/3.3Kv,Power Transformer Make-Marsons,S.No.8577 Installed At Sarubera Project Under Kuju Area.B) Complete Repairing And Rewinding Of 500 Kva ,11Kv/440V,Distribution Transformer Installed A

Issued by Boards / Undertakings / PSU · Ramgarh, Jharkhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
03 Aug 2026
7 days left
EMD
25100
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ramgarh → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for A) Complete Repairing And Rewinding Of 01 Mva ,11Kv/3.3Kv,Power Transformer Make-Marsons,S.No.8577 Installed At Sarubera Project Under Kuju Area.B) Complete Repairing And Rewinding Of 500 Kva ,11Kv/440V,Distribution Transformer Installed At Colony Substation Of Sarubera Project Under Kuju Area.C) Rewinding And Installation Of 11Kv/415V, 15Kva Transformer Along With Associated Works For Provision Of Separate Power Supply To The Weighbridge Installed Under Sarubera Project.

BOQ

Name of Work:- A) Complete repairing and rewinding of 01 MVA ,11KV/3.3KV,Power Transformer make-Marsons,S.No.8577 installed at Sarubera Project under Kuju Area.B) Complete repairing and rewinding of 500 KVA ,11KV/440V,Distribution Transformer installed at colony substation of Sarubera Project under Kuju Area.C) Rewinding and installation of 11KV/415V, 15KVA transformer along with associated works for provision of separate power supply to the weighbridge installed under Sarubera Project.
Sl. No. Item Description
1A) Complete repairing and rewinding of 01 MVA ,11KV/3.3KV,Power Transformer make-Marsons,S.No.8577 installed at Sarubera Project under Kuju Area.
2cost of copper wire/strip with DGC covering size 9SWG or 5.00 mm
3Insulation cost @15% of cost of copper
4Labour cost @15% of cost of copper
5Cost of Insulation Resistance (IR) test,Polarization Index (PI) test & High postest & Dissolved gas analysis test through NABL
6Less Scrap value @60% copper wire
7CCPOH@10%
8B) Complete repairing and rewinding of 500 KVA ,11KV/440V,Distribution Transformer installed at colony substation of Sarubera Project under Kuju Area.
9cost of copper wire/strip with DGC covering
10Insulation cost @15% of cost of copper
11Labour cost @15% of cost of copper
12Less Scrap value @60% copper wire
13Cost of Insulation Resistance (IR) test,Polarization Index (PI) test & High postest & Dissolved gas analysis test through NABL
14Cost of Gasket/Corksheet
15CCPOH@10%
16C) Rewinding and installation of 11KV/415V ,15KVA Transformer along with associated works for provision of separate power supply to the weighbridge installed at Sarubera Project.
17C)(i):-15 KVA 11KV/440Volt
18Supply & Fixing of 11 KV grade Air Break Switch 630Amp horizontal type
19Supply & Fixing of 11KV Drop out fuse, 400Amp
20Supplying of two lengths of channel iron 75 mm X 40 mm X 6 mm (7.14 kg3 per metre) double pole cross arm for three wire 11KVover head line conductors complete with through bolts and nuts for clamping to the poles, 50 mm X 6 mm M.S. flats welded onone side to the channel iron and with bolts and nuts on the otherside for tying the cross arms together, including drilling holes forinsulator pins/ fittings, bolts, nuts and washers etc (as per drawing)and painting with primer and finish paint as required.
21Earthing with copper earth plate 600 mm X 600 mm X 3 mm thick Including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal/coke and salt as required.
22Supply & Fixing of Aluminium Unarmoured cable single core1100 voltage grade 35 sq mm
23Supply & Fixing of Aluminium tub terminal 35 sq mm
24MCCB 36kA current rating-40 & 100 Amps 4 Pole & Micro-Processor Release, over load 40%-100% x In. & short circuit 1.5-8 x Ir. adjustable
25Supply & Fixing of RCCB 4 POLE 100AMP, 300mA
26Supplying of approved make TPN MCB DB metal double door IP 43 protection with provision for FP MCB/ Isolator/ RCCB/RCBO as incomer and SP MCBs as outgoing inclusive of busbar, neutral bar, earth bar, connection copper wire not less than 16 sq.mm & two earth terminals etc. complete as per IS:13032(exclusive of MCB & isolator):4 Way (4+12)
27Erection of pole of following length in cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 40mm nominal size) foundation including excavation and refilling etc. as required. Above 10.00 metre and upto 12.00 metre
28Supplying and erection of 11 KV pin insulator complete with largesteel head G.I. pin, nuts, washers etc. as required.
29Supplying of channel iron 75 mm X 40 mm X 6 mm (7.14 kg permetre) cross arm for two 11 KV over head line conductorscomplete with 50 mm X 50 mm X 6 mm (angle iron bracket welded to the channel iron and complete with 50 mm X 6mm M.S. flatiron clamps, bolts and nuts including drilling holes for insulatorpins, bolts, nuts and washers etc (as per drawing) and painting with primer and finish paint as required.
30Supplying and erection of bow stay set complete (galvanised)with 19/20 mm dia X 1.8 metres long stay rod, anchor plate ofsize 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, turn buckle(20 mm X 60 cm), 7/4.00 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 40 mm nominal size) foundationincluding excavation and refilling and also with 0.6 m long braceof size 50 mm X 50 mm X 6 mm angle iron with 50 mm dia pulleyfixed at one end of the brace as required
31Shifting, erection, & commissioning of 25/63/100/200/315/500 KVA (11/0.433 KV) distribution transformer on existing structure including Bi-metallic clamp, ACSR/AAAC Conductor i/c colour code sleeve, for connection from H.T. Line to transformer as required as per specification.
32Supplying & drawing/laying of PVC insulated XLPE aerial bunch power cable conductor H2/H4 grade aluminium solid/stranded conforming to IS-14255-1995, alu. alloy insulated messenger 1100 volts grade cable of approved make in air with necessary material as per specification of required size as mentioned below-3x70 sq.mm, 1x16(st. light), 1x35(insulated neutral messenger)
33C)(ii):-Rewinding and repairing of 15 KVA, 11 KV/440 Volt
34Cost of Copper wire 20 no
35Cost of Insulating materials @15% of copper wire
36Labour Cost @15% of copper wire
37Less Scrap value @60% copper wire
38Profit @ 10%
39Oil filtration of Transformer
40Supply & Fixing of Bushing for Transformer 11 KV grade
41Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56614291
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 03-08-2026
Authority
Authority Name Central Coalfields Limited
Work Description Tender for A) Complete Repairing And Rewinding Of 01 Mva ,11Kv/3.3Kv,Power Transformer Make-Marsons,S.No.8577 Installed At Sarubera Project Under Kuju Area.B) Complete Repairing And Rewinding Of 500 Kva ,11Kv/440V,Distribution Transformer Installed At Colony Substation Of Sarubera Project Under Kuju Area.C) Rewinding And Installation Of 11Kv/415V, 15Kva Transformer Along With Associated Works For Provision Of Separate Power Supply To The Weighbridge Installed Under Sarubera Project.
Basic Detail
Tender No GM (K)/EnM/eTender/26-27/38
Bidding Type Tender
Location
City Ramgarh
State Jharkhand
Key Dates
Publish Date 22 Jul 2026
Submission Date 03 Aug 2026
Open Date 04 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 25100
Exemption Not Available
Document List
ba2536f9-449c-451f-a1cd-9923a930c4c9.html
BOQ_375280.xls
Tendernotice_1 (17).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 22, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 03, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days
Aug 04, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 8 days

Tender Documents

Download All (ZIP) ↓
html

ba2536f9-449c-451f-a1cd-9923a930c4c9.html

xls

BOQ_375280.xls

pdf

Tendernotice_1 (17).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders