Tender For Repairing And Maintenance Work (Using Mc 800)Over The Damage Surface At (1) Seikhpur To Kumarganj Road (From Ch. 2.370 To Ch. 2.380) (2) Pukuria Ferryghat To Kumarganj Road(From Ch. 5.445 To Ch. 5.460) (3) Bhaluka Road Railway Station To T
Tender Overview
Project Description
Tender for Repairing And Maintenance Work (Using Mc 800)Over The Damage Surface At (1) Seikhpur To Kumarganj Road (From Ch. 2.370 To Ch. 2.380) (2) Pukuria Ferryghat To Kumarganj Road(From Ch. 5.445 To Ch. 5.460) (3) Bhaluka Road Railway Station To Tulsihata Road(From Ch. 6.790 To Ch. 6.810) (4) Nh-81 To Harishchandrapur Railway Station Road(From Ch. 1.295 To Ch. 1.305) (5) Link Road From Tulshihata To Khushida To Bishunupur High School (From Ch. 0.395 To Ch. 0.405) (6) Feeder Road From Tulshihata To Khushidha Road(From Ch. 0.100 To Ch. 0.110) (7) Chanchal-Kharba-Churamanghat Road(From Ch. 3.010 To Ch. 3.020) (8) Link Road From Ckc Road To Koligram Village (From Ch. 0.310 To Ch. 0.320) (9) Paharpur Swarupganj Road (From Ch. 1.115 To Ch. 1.125) (10) Link Road To Vingol Health Centre From Chanchal Harishchandrapur Road (From Ch. 1.090 To Ch. 1.100), In The District Of Malda During The Year 2026-2027..
BOQ
| Sl. No. | Item Description |
| 1 | Pre- coating stone aggregates with cutbac bitumen MC-800 @ 6% of net volume of stone aggregate in mini hot mix plant/Mix it all including pre hetting and bitumen drums upto 85deg C and pre heating the sonne aggregate at suitable temparature, including cost of carriege of all materials at the mixing yeard and cost of filling the cold mix in empty cement bag, storing the mix filled bag at a suitable place as directed including cost and carriege of bitumen and hire charges of machinaries and all incidental charges complete as per direction of engineer In Charge(Ref: IRc: 116:2004) |
| 2 | Labour for mixing stable anti-stripping agent of approved quality conforming to Table - A4-1 of Appendix–4 of Specification for Road & Bridge Works of MoRT&H (5th Revision) to the binder @ 0.5% to 1% by weight of binder (depending up on size & stripping value of the aggregates) and allowing 15 to 30 minutes of circulation or stirring in the hot bitumen tank to ensure a homogeneous mix of binder and anti-stripping agent for different bituminous works as per Technical Specifications given in Appendix – 4 of Specification for Road & Bridge Works of MoRT&H (5th Revision) and direction of Engineer-in-Charge complete including cost and carriage of all materials, labours, hire charges of T&P but excluding the cost but including carriage of anti-stripping agent to site of works. |
| 3 | B. Repairing pot holes by pre-coated Chips: Repairing pot holes with pre-coated stone materials including cutting, loading pre-coated stone materials at departmental stack-yard or any other approved pre-defined location, including carriage of pre-coated stone materials from source to different kilometers of road by truck and laying directly from truck and compacting with plate compactor / power roller including cutting the pot hole to regular shape clearing the pot holes of loose materials, drying the bed of pot holes, where necessary, by soaking with gunny bags and using lime, where necessary, before laying of pre-coated materials etc. complete as per direction of Engineer-in-charge. (ii) Within a distance upto 10 kms. |
| 4 | Providing and laying Premixed Seal Coat (Type B) with approved quality grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and reading etc complte. II. By Manual Means: (i) With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.) |
| 5 | Providing and applying Fog Spray using low viscosity (SS Type) Cationic bitumen emulsion for sealing cracks less than 3 mm wide or incipient fretting or disintegration in an existing bituminous surfacing including thoroughly cleaning of surface using scrubber and compressed air jets, applying SS type Bituminous Emulsion using bitumen pressure distributor, including cost and carriage of all ingredients and hire and operational charges of all machinery, tools and plants including fuel, lubricants and cost of quality control as per Clause 513 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). II. By Manual Means:(i) With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.) |
| 6 | Add GST @ 18% |
| 7 | Add Labour Welfare Cess @ 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender