Tender For Construction Of 100 Seated Girls Hostel At Larambha College, Larambha Gp Of Attabira Block For The Year 2025-26.
Tender Value
2.40 Crore
Estimated cost
Bid Submission
06 Aug 2026
8 days left
EMD
2.40 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Bargarh → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of 100 Seated Girls Hostel At Larambha College, Larambha Gp Of Attabira Block For The Year 2025-26.
BOQ
| Sl. No. | Item Description |
| 1 | Earth work excavation of foundation trench in hard soil including dressing and levelling the bed with initial lead of 50m. and 1.5 m. initial lift including all costs of labour materials required for the work etc. complete and as per direction of Engineer in charge. |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
| 3 | Cement concrete (1:3:6) with 4 cm. Hand Broken hard granite metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering, curing for seven days with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
| 4 | Brick work with Flyash Bricks foundation and plinth in cement mortar (1:6) having crushing strength not less than 75.00 Kg/cm2 immerging the bricks in water not less than six hours with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
| 5 | Brick work with Flyash Bricks in superstructure in cement mortar (1:6) having crushing strength not less than 75.00 Kg/cm2 immerging the bricks in water not less than six hours with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. {Ground Floor} |
| 6 | First Floor |
| 7 | Second Floor |
| 8 | Brick work with Flyash Bricks in superstructure of 5\\" partition wall in cement mortar (1:4) having crushing strength not less than 75.00 Kg/cm2 immerging the bricks in water not less than six hours with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. {Ground Floor} |
| 9 | First Floor |
| 10 | Second Floor |
| 11 | Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. {Column Footing} |
| 12 | Plinth Band |
| 13 | Column {Ground Floor} |
| 14 | First Floor |
| 15 | Second Floor |
| 16 | Beam {Ground Floor} |
| 17 | First Floor |
| 18 | Second Floor |
| 19 | Stair Case {Ground Floor} |
| 20 | First Floor |
| 21 | Second Floor |
| 22 | Lintel {Ground Floor} |
| 23 | First Floor |
| 24 | Second Floor |
| 25 | Chajja {Ground Floor} |
| 26 | First Floor |
| 27 | Second Floor |
| 28 | Roof Slab {Ground Floor} |
| 29 | First Floor |
| 30 | Second Floor |
| 31 | Fins & Shelves {Ground Floor} |
| 32 | First Floor |
| 33 | Second Floor |
| 34 | Labour charges for cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of TATA TISCON/SAIL steel rod and as per drawing, design and direction of Engineer-in-charge. {Ground Floor} |
| 35 | First Floor |
| 36 | Second Floor |
| 37 | Supplying, fitting & fixing of WPC.door including all cost of material & labour,etc. {Ground Floor} |
| 38 | First Floor |
| 39 | Second Floor |
| 40 | Supply fitting fixing of Moduled Pannel Door {Ground Floor} |
| 41 | First Floor |
| 42 | Second Floor |
| 43 | Glazed Pannelled Window {Ground Floor} |
| 44 | First Floor |
| 45 | Second Floor |
| 46 | Collapsible Gate |
| 47 | MS Square Bar Grills {Ground Floor} |
| 48 | First Floor |
| 49 | Second Floor |
| 50 | Angle Iron Choukaths {Ground Floor} |
| 51 | First Floor |
| 52 | Second Floor |
| 53 | Providing, fitting,fixing up window (sliding type) made up aluminium section 151-154,151-155 as windows frame section no 155-155,151-153 and 151-155 as shutter frame with 5mm thick glass as panel fitted with rubber beading including all fitting, cost of all material, labour, T&P, etc. complete as per direction of Engineer-in-charge. {Ground Floor} |
| 54 | First Floor |
| 55 | Second Floor |
| 56 | 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping with proper level and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. {Ground Floor} |
| 57 | First Floor |
| 58 | Second Floor |
| 59 | 12mm thick cement plster (1:6) over Brick work including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. {Ground Floor} |
| 60 | First Floor |
| 61 | Second Floor |
| 62 | 16mm thick cement Plaster in CM (1:6) over brick work including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. {Ground Floor] |
| 63 | First Floor |
| 64 | Second Floor |
| 65 | Supplying,fitting & fixing Vitrified plain ivery tiles in floors of size 600mm x600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar (1:4) and filling joints with white cement of approved quality including cost of all work all materials,taxes,labour, T&P ,etc. complete as per direction of Engineer-in-charge. {Ground Floor} |
| 66 | First Floor |
| 67 | Second Floor |
| 68 | Supplying & Fixing vertified tiles in dados skirting on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles,etc. complete as per direction of Engineer-in-charge. {Ground Floor} |
| 69 | First Floor |
| 70 | Second Floor |
| 71 | Supplying & Fixing ceramic floor tiles in Toilet Floors on 20mm thick cement plaster (1:4) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles and as per direction of Engineer-in-charge. {Ground Floor} |
| 72 | First Floor |
| 73 | Second Floor |
| 74 | Supplying & Fixing ceramic wall tiles in dados skirting on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles and as per direction of Engineer-in-charge. {Ground Floor} |
| 75 | First Floor |
| 76 | Second Floor |
| 77 | Supplying & Fixing of Granite tiles on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete excluding cost of precast tiles and as per direction of Engineer-in-Charge. {Ground Floor} |
| 78 | First Floor |
| 79 | Second Floor |
| 80 | Supplying fixing of Chequired Tiles on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed etc complete. {Ground Floor} |
| 81 | Providing Acrilic wall Putty finised smooth to receive painting . {Ground Floor} |
| 82 | First Floor |
| 83 | Second Floor |
| 84 | Painting two coats of enamel paint over a coat of Priming including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. {Ground Floor} |
| 85 | First Floor |
| 86 | Second Floor |
| 87 | Finishing wall Two Coats with Plastic Imulsion Paint over a coat primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. {Ground Floor} |
| 88 | First Floor |
| 89 | Second Floor |
| 90 | Finishing wall Two Coats with weather coat over a coat of oil bnound cement primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. {Ground Floor} |
| 91 | First Floor |
| 92 | Second Floor |
| 93 | 25mm thick grading concrete(1:2:2) on roof slab with 4.7 mm size hard broken granite chips on new works with proper plumb and line watering curing for proper period with cost, conveyance, royality, taxes of all materials, labour and T & P required for the work, etc. complete as per direction of Engineer-in-charge. {Second Floor} |
| 94 | Supplying, fitting and fixing of stainless steel of 304 grade in hand railing using 50 mm dia of 2 mm thick circular pipe with Balustrade of size 32 mm x 32 mm x 2 mm @ 0.9 mt C/C and stainless square pipe bracing of size 32 mm x 32 mm x 2 mm in 3 rows in stair case as per approved design specification buffing, polishing etc with cost, conveyance & taxes of all materials,etc. complete as per direction of Engineer-in-charge. {Ground Floor} |
| 95 | First Floor |
| 96 | Second Floor Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 23, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 06, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysAug 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender