Tender For Shifting Of Electrical Line Form Primary/Upper Primary School Electrical System From Emanating Over The School In The Area Of Electricity Distribution Division-Shahabad Hardoi
Tender Overview
Project Description
Tender for Shifting Of Electrical Line Form Primary/Upper Primary School Electrical System From Emanating Over The School In The Area Of Electricity Distribution Division-Shahabad Hardoi
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 06-Aug-2026 | Date037 | Date | 10-Aug-2026 |
| 2 | 31-Jul-2026 | date | Date | 06-Aug-2026 |
| 3 | 10-Aug-2026 | date2 | Date | 17-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Safe Loading carriage & unloading of following material from store centre to pit site/JE Dump store |
| 2 | PCC Pole 8.5 Mtr Long |
| 3 | CABLE LT ABC (1X16+1x25) SQMM. |
| 4 | CABLE LT ABC (3X50+1X35+1X16) SQMM. |
| 5 | G.I Wire 6 swg |
| 6 | GS Stay Set Complete 16*1800 mm |
| 7 | 11 KV Pin Insulator With Pin |
| 8 | 11 KV Disc insulator With fitting |
| 9 | MS Earthing Rod Complete 20 mm |
| 10 | ACSR Weasel Conductor |
| 11 | 11 KV M.S. Angel |
| 12 | V-Type Cross Arm |
| 13 | F-Clamp |
| 14 | 11 kv M.S. Top Channel |
| 15 | 11 kv Droper Channel |
| 16 | 11 kv MS T-Off Channel |
| 17 | Erection, pithing, Grouting of reused/new PCC 8.5 mtr long single pole with all accessories like clamp, nut bolt etc. (clamp, nut bolt and other necessary items provided by the contractor expect PCC pole) |
| 18 | Erection Pithing, Grouting, of Reused/New PCC 8.5 Mtr. Long Double pole with all accessories like clamp, nut bolt etc. (clamp, Nut bolt, M.S. dropper channel, guarding angle, LT Shackle insulator and other necessary items provided by the contractor expect STP Pole |
| 19 | Grouting and Nuzzling of 11 KV stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (sand, brick blast & cement). All material except stay wire shall be supplied by the contractor. |
| 20 | Ordinary earthing by 11 KV MS earth Rod 2500 mm long as per RESPO schedule. All material of earthing shall be arrange by the contractor. |
| 21 | Reused of existing/new ABC (1x16+1x25) sq mm. For Stringing & Sagging. |
| 22 | Reused of existing/new ABC (3x50+1x35+1x16)sqmm. For Stringing & Sagging. |
| 23 | Reused of existing/new ACSR weasel conductor for Stringing & Sagging of three phase 11 kv line Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
TodayCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
TodayCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 7 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents