Environment and Forests Government Departments Closing in 14 days TDR #56608621

Tender For Construction Of Dug Out Pond (30X7x3.9) In Co:- 8A/N At Piyas Reservoir, Co. 8A/N At Nawnatoo, Co. 8A/N At Pathernaki, Co. 6B/N At Chhichha, Construction Of 7A/N At Piyas, Range Nagseni, Kishtwar Forest Division Under Cat Kiru Hepp For The

Issued by Government Departments · Kishtwar, Jammu and Kashmir
Tender Value
8.47 Lakhs
Estimated cost
Bid Submission
10 Aug 2026
14 days left
EMD
25419
Bank guarantee accepted
Document Fee
600
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kishtwar → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of Dug Out Pond (30X7x3.9) In Co:- 8A/N At Piyas Reservoir, Co. 8A/N At Nawnatoo, Co. 8A/N At Pathernaki, Co. 6B/N At Chhichha, Construction Of 7A/N At Piyas, Range Nagseni, Kishtwar Forest Division Under Cat Kiru Hepp For The Year 2026-27.

BOQ

Name of Work:- Construction of Dug out Pond (30x7x3.9) in Co:- 8a/N at Piyas Reservoir, Co. 8a/N at Nawnatoo, Co. 8a/N at Pathernaki, Co. 6b/N at Chhichha, Co 7a/N at Piyas, Range Nagseni, Kishtwar Forest Division under CAT KIRU HEPP for the Year 2026-27.
Sl. No. Item Description
1(1) Comptt. 8a/N at Piyas: Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared
2Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All Kind of Soil 80%
3Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Ordinary Rock 20 %
4Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.
5(2) Comptt. 8a/N at Nawnatoo: Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared
6Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All Kind of Soil 80%
7Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Ordinary Rock 20 %
8Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.
9(3) Comptt. 8a/N at Pathernaki: Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared
10Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All Kind of Soil 80%
11Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Ordinary Rock 20 %
12Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.
13(4) Comptt. 6a/N at Chhichha Batme: Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared
14Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All Kind of Soil 80%
15Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Ordinary Rock 20 %
16Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.
17(5) Comptt. 7a/N at Piyas: Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared
18Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All Kind of Soil 80%
19Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Ordinary Rock 20 %
20Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56608621
AUTHORITY Government Departments
TENDER VALUE 8.47 Lakhs
LAST DATE 10-08-2026
Authority
Authority Name Forest Department
Work Description Tender for Construction Of Dug Out Pond (30X7x3.9) In Co:- 8A/N At Piyas Reservoir, Co. 8A/N At Nawnatoo, Co. 8A/N At Pathernaki, Co. 6B/N At Chhichha, Construction Of 7A/N At Piyas, Range Nagseni, Kishtwar Forest Division Under Cat Kiru Hepp For The Year 2026-27.
Basic Detail
Tender No 21 of 2026
Bidding Type Tender
Location
City Kishtwar
State Jammu and Kashmir
Key Dates
Publish Date 23 Jul 2026
Submission Date 10 Aug 2026
Open Date 12 Aug 2026
Finance
Tender Value 8.47 Lakhs
Tender Fee 600
EMD 25419
Exemption Not Available
Document List
60dc097f-aa14-47e7-9f03-bf29ca919091.html
BOQ_1039807.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 23, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 10, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 14 days
Aug 12, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 16 days

Tender Documents

Download All (ZIP) ↓
html

60dc097f-aa14-47e7-9f03-bf29ca919091.html

xls

BOQ_1039807.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders