Tender For Installation,Diversion And Extension Of Electrical O/H Lines For Dbocp Coal Dump Road Weighbridge, Kalimati Quarry, And Palasia Basti And Chanch Colony.
Tender Value
11.13 Lakhs
Estimated cost
Bid Submission
31 Jul 2026
6 days left
EMD
14000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Dhanbad → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Installation,Diversion And Extension Of Electrical O/H Lines For Dbocp Coal Dump Road Weighbridge, Kalimati Quarry, And Palasia Basti And Chanch Colony.
BOQ
| Sl. No. | Item Description |
| 1 | A)INSTALLATION OF NEW 440V O/H LINE FOR SEPARATE POWER CONNECTION OF DBOCP COAL DUMP WEIGHBRIDGEPART-1 AS PER SOR-2012 |
| 2 | Fabrication, supply & erection of iron materials for holding insulator, cradle guard, etc. |
| 3 | Erection of steel tubular pole |
| 4 | Supplying and erection of stay set complete set |
| 5 | Stringing of ACR Conductor. |
| 6 | Dismantling of existing pole |
| 7 | Supply and erection of Suckle insulator. |
| 8 | Supplying and erection of three-piece nonlinear resistor type lightning arrestor. |
| 9 | PART-2 AS PER SOR-2012 |
| 10 | Transporting of Pole |
| 11 | Supply and erection of 4-Core 35sq.mm. aluminum cable (Armored). |
| 12 | Supply & erection of 2-core 10 sq.mm. aluminum cable. (Unarmored) |
| 13 | Supply and erection of 200 Amp Change Over. |
| 14 | B) Diversion of 3.3KV overhead line in Kalimati Quarry.9PART 1-As Per SOR 2012) |
| 15 | Fabrication, supply & erection of iron materials for holding insulator, cradle guard, etc. |
| 16 | Erection of steel tubular pole |
| 17 | Dismantling of existing pole |
| 18 | Supplying and erection of stay set complete set |
| 19 | Stringing of ACR Conductor. |
| 20 | Dismantling of overhead lines comprising of copper / aluminum overhead conductor, G. Wire, cross arms, insulators etc. as required |
| 21 | Supply and erection of pin insulator. |
| 22 | PART 2 - As Per Previous Work Order) |
| 23 | Transporting of old dismantled o/h materials from site to DBOCP Workshop. |
| 24 | Supply of GI Wire. |
| 25 | Erection of GI Wire. |
| 26 | Supply & making of cable jointing kit/pole mounting kit to XLPE cable. |
| 27 | Supply and erection of 200 Amp Change Over. |
| 28 | (C) Diversion of 440V O/HLine at Palasia Basti for Safety Concern.(PART 1-As Per SOR 2012) |
| 29 | Fabrication, supply & erection of iron materials for holding insulator, cradle guard, etc. |
| 30 | Erection of steel tubular pole |
| 31 | Dismantling of existing pole |
| 32 | Supplying and erection of stay set complete set |
| 33 | Stringing of ACR Conductor. |
| 34 | Dismantling of overhead lines comprising of copper / aluminum overhead conductor, G. Wire, cross arms, insulators etc. as required |
| 35 | (PART 2 - As Per Previous Work Order) |
| 36 | Concreating of steel tubular pole. |
| 37 | Supply and erection of 4-Core 35sq.mm. aluminum cable (Armored). |
| 38 | D)Diversion Of The 440V Overhead Line From Laikdih 2MVA To Chanch Colony, Passing Through Babu Dangal Colony In Th(PART 1 - As Per SOR 2012) |
| 39 | Fabrication, supply & erection of iron materials for holding insulator, cradle guard, etc. |
| 40 | Erection of steel tubular pole |
| 41 | Dismantling of existing pole |
| 42 | Supply and erection of Suckle insulator |
| 43 | Supplying and erection of stay set complete set |
| 44 | Dismantling of overhead lines comprising of copper / aluminum overhead conductor, G.l Wire, cross arms, insulators etc. as required |
| 45 | Stringing of ACR Conductor. |
| 46 | (PART 2 - As Per Previous Work Order) |
| 47 | Transportation of pole |
| 48 | Manpower Unskilled |
| 49 | Manpower Skilled |
| 50 | Manpower Highly skilled |
| 51 | A rounding the pole with bricks and concrete materials. |
| 52 | Transporting of old dismantled o/h materials from site to DBOCP Workshop, |
| 53 | Supply of 6 SWG G.l. wire |
| 54 | Erection of Cradle Guard. |
| 55 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 22, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 31, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysAug 01, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender