Rural Development Government Departments Closing in 7 days TDR #56604280

Tender For Construction Of Sh3 At 74Th Km To Pipalpali Road In The District Of Bargarh Under Mmsy(Unconnected Habitations Under Gramodaya) For The Year 2026-27

Issued by Government Departments · Bargarh, Odisha
Tender Value
1.38 Crore
Estimated cost
Bid Submission
03 Aug 2026
7 days left
EMD
1.38 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bargarh → Odisha
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Construction Of Sh3 At 74Th Km To Pipalpali Road In The District Of Bargarh Under Mmsy(Unconnected Habitations Under Gramodaya) For The Year 2026-27

BOQ

Name of Work:- Construction of SH3 at 74th km to Pipalpali Road in the District of Bargarh under MMSY(Unconnected habitations under Gramodaya) for the year 2026-27
Sl. No. Item Description
1Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site by manual means within a lead of 5kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H Specifications for Road & Bridge works (4th Revision)and as per the direction of engineer in charge.
2Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per MORD technical Specification Clause 301 and direction of the Engineer in Charge (excluding cost of excavation and transportation to site).
3Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub-base, with 43 grade cement or any other type as per Clause 1501.2.2, M30 (grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars near approaches to bridges and culverts (expansion joints), admixtures as approved, curing of concrete slabs for 14 days, curing compound and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
4Earth work in excavation of fondation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of Engineer in Charge.
5Filling sand-Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge.
6Providing and laying reinforced cement concrete pipe NP3 for culverts including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 of MoRD but excluding the charges of GST & as per direction of the Engineer-in-Charge.-600 mm dia Single row
7Supplying, fitting and placing HYSD bar reinforcement complete as per drawings and technical specification Clauses 1000 and 1200 of MoRD and as per direction of the Engineer-in-Charge.
8Cement concrete of M-150 having maximum compressive strength of 150 kg./cm2 ( test to be conducted) on 150 mm. cubes tested at 28 days including curing (tests conducted in accordance with IS-456 & IS-516) & conforming to clause-302 of IRC 21/1987 using clean crusher broken hard granite coarse aggregate of 40 mm. size down grade of approved quality to be protested in the laboratory) obtained from approved quarry the proportion mix, grading conforming to relevant ISI/IRC codes pre-approved including arranging of reinforcement as per approved drawing including hoisting, lowering concrete in layers not exceeding 150 mm. thick each compacting with vibrator watering & curing for 28 days centering shuttering & finishing the exposed surface smooth providing grooves & beads where necessary including cost, conveyance royality & taxes of all labour machineries etc. required for the work complete in all respects including dismantling the centering & shuttering as per specification & direction of Engineer-in-Charge.-Foundation
9Cement concrete of M-150 having maximum compressive strength of 150 kg./cm2 ( test to be conducted) on 150 mm. cubes tested at 28 days including curing (tests conducted in accordance with IS-456 & IS-516) & conforming to clause-302 of IRC 21/1987 using clean crusher broken hard granite coarse aggregate of 40 mm. size down grade of approved quality to be protested in the laboratory) obtained from approved quarry the proportion mix, grading conforming to relevant ISI/IRC codes pre-approved including arranging of reinforcement as per approved drawing including hoisting, lowering concrete in layers not exceeding 150 mm. thick each compacting with vibrator watering & curing for 28 days centering shuttering & finishing the exposed surface smooth providing grooves & beads where necessary including cost, conveyance royality & taxes of all labour machineries etc. required for the work complete in all respects including dismantling the centering & shuttering as per specification & direction of Engineer-in-Charge.-Sub-Structure
10CC of design mix of M-25 grade having specified characteristics compressive strength/ target mean strength of 300kg./cm2 in design mix with minimum quantity of cement as specified in IRC Code of 150 mm. cubes at 28 days curing after mixing & tests conducted in accordance with relevant clauses of IS 456/IS 516/IRC 216/1987/IRC-78/1983 using crusher broken granite course aggregate of 20mm. .sizes & proportion as specified in clause-302.6.2 of IRC 21/1987 & IS-10262 & subject to mix design in conformity with the grading & proportion of different materials for concrete as specified in the relevant codes of approved quality, obtained from approved quarry & using minimum quantity of cement confirming to codal provision including hoisting, lowering & laying concrete in layers not exceeding 15cm thick compacting with vibrators watering & curing for 28 days including water tight steel centering , shuttering & form works finishing the exposed surface smooth providing beads & grooves wherever necessary including cost, conveyance royalties and all other taxes of all materials with all leads & lifts, cost of all labour T&P & machineries etc. required for the work including dewatering if necessary, complete in all respects as per direction of the Engineer-in-Charge -Superstructure
11Providing Weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 of MORD specification for Rural roads but excluding the charges of GST and as per direction of Engineer-in- charge.
12Reinforced cement concrete M15 grade Kilometer stone/ local stone of standard design as per IRC:8 fixing in position including painting & printing etc. as per the drawing &technical specification clause 1703 of MoRD but excluding the charges of GST and as per direction of Engineer-in-Charge.-Fixing of Km. Stone
13Reinforced cement concrete M15 grade Kilometer stone/ local stone of standard design as per IRC:8 fixing in position including painting & printing etc. as per the drawing &technical specification clause 1703 of MoRD but excluding the charges of GST and as per direction of Engineer-in-Charge.-200 mm Stone (Precast)
14Reinforced cement concrete M15 grade Kilometer stone/ local stone of standard design as per IRC:8 fixing in position including painting & printing etc. as per the drawing &technical specification clause 1703 of MoRD but excluding the charges of GST and as per direction of Engineer-in-Charge.-Guide Post (M-20)
15Supplying, fitting, fixing of roads sign board as per approve drawing including cost, conveyance, royality, taxes of all materials, labour, T & P etc. providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC: 67-2010 made of A.C.P. (Aluminium composite panel) used for sign boards with a thermoplastic core of low density polyethylene (LDPE) between two thick sheets of aluminium with over all thickness of 4mm and aluminum thickness of 0.5mm on both sides as per requirement in table 6.1 of IRC-67/2010 and as per technical specifically of clause 801.3 supported on a mild steel angle iron post 75mm x 75mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 40cm x 40cm x 60cm. 60cm below ground level as per approved drawing including excavation, curring but excluding the charges of GST etc. complete as per MoRD Technical Specification Clause 1701 and as per direction of Engineer-in-charge.- Information signs
16Providing and fixing of typical MMSy Citizen sign board with logo as per MORD specifications and drawing. Two MS plates of 2mm thick, top & middle plate duly welded with MS flat iron 25mmx5mm size on back on edges. The flat iron frame of both plate will be welded to 2nos 75mmx75mm of 12SWG sheet tubes posts duly embeded in C.C. M-15 grade blocks of 600mmx600mmx750mm, 750mm below ground level. The top most dimond plate will be welded to middle plate by 47mmx47mm of 12SWG steel tube. All M.S. will be stove enameled on both sides. Lettering & printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quailty in required shade & colour. All sections of framed posts & steel tubes will be painted with primer & two coats of paint as per drawing clause 1701 and Annexure 1700.1
17Providing and erecting overhead signs with a corrosion resistant 2mm thick aluminium alloy sheet reflectorised with high intensity retro-reflective sheeting of encapsulated lense type with vertical and lateral clearance given in clause 802.2 and 802.3 etc complete including cost conveyance etc required as per specification but excluding the charges of GST & direction of Engineer-in-Charge.-600mm equilateral triangle
18Providing and erecting overhead signs with a corrosion resistant 2mm thick aluminium alloy sheet reflectorised with high intensity retro-reflective sheeting of encapsulated lense type with vertical and lateral clearance given in clause 802.2 and 802.3 etc complete including cost conveyance etc required as per specification but excluding the charges of GST & direction of Engineer-in-Charge.-600mm Circular
19Restoration of rain cuts with soil, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORD technical specifications Clause 1902 by manual means as per direction of the Engineer in charge-1st year
20Restoration of rain cuts with soil, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORD technical specifications Clause 1902 by manual means as per direction of the Engineer in charge-2nd year
21Restoration of rain cuts with soil, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORD technical specifications Clause 1902 by manual means as per direction of the Engineer in charge-3rd year
22Restoration of rain cuts with soil, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORD technical specifications Clause 1902 by manual means as per direction of the Engineer in charge-4th year
23Restoration of rain cuts with soil, clearing the loose soil, benching for 300mm width laying fresh material in layers not exceeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MORD technical specifications Clause 1902 by manual means as per direction of the Engineer in charge-5th year
24Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MORD technical specification Clause 1903 as per direction of the Engineer in charge.-1st year
25Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MORD technical specification Clause 1903 as per direction of the Engineer in charge.-2nd year
26Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MORD technical specification Clause 1903 as per direction of the Engineer in charge.-3rd year
27Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MORD technical specification Clause 1903 as per direction of the Engineer in charge.-4th year
28Making up loss of material/irregularities on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipment at OMC upto a lead of 1000 m as per MORD technical specification Clause 1903 as per direction of the Engineer in charge.-5th year
29Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903.-1st year
30Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903.-2nd year
31Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903.-3rd year
32Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903.-4th year
33Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903.-5th year
34Maintenance of Hume pipe /Slab/Boxcell Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 of MORD and as per direction of the Engineer in charge. -1st year
35Maintenance of Hume pipe /Slab/Boxcell Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 of MORD and as per direction of the Engineer in charge. -2nd year
36Maintenance of Hume pipe /Slab/Boxcell Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 of MORD and as per direction of the Engineer in charge. -3rd year
37Maintenance of Hume pipe /Slab/Boxcell Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 of MORD and as per direction of the Engineer in charge. -4th year
38Maintenance of Hume pipe /Slab/Boxcell Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 of MORD and as per direction of the Engineer in charge. -5th year
39Maintenance of 200 metre, km stones & 5th Km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 of MORD as per direction of the Engineer in charge.-1st year
40Maintenance of 200 metre, km stones & 5th Km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 of MORD as per direction of the Engineer in charge.-2nd year
41Maintenance of 200 metre, km stones & 5th Km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 of MORD as per direction of the Engineer in charge.-3rd year
42Maintenance of 200 metre, km stones & 5th Km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 of MORD as per direction of the Engineer in charge.-4th year
43Maintenance of 200 metre, km stones & 5th Km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 of MORD as per direction of the Engineer in charge.-5th year
44Cutting of branches of trees from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.-1st year
45Cutting of branches of trees from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.-2nd year
46Cutting of branches of trees from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.-3rd year
47Cutting of branches of trees from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.-4th year
48Cutting of branches of trees from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.-5th year
49Cutting of shurb from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.-1st year
50Cutting of shurb from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.-2nd year
51Cutting of shurb from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.-3rd year
52Cutting of shurb from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.-4th year
53Cutting of shurb from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge.-5th year
54Triming of grass and weeds from the shoulder/berms and disposal the same to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge-1st year
55Triming of grass and weeds from the shoulder/berms and disposal the same to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge-2nd year
56Triming of grass and weeds from the shoulder/berms and disposal the same to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge-3rd year
57Triming of grass and weeds from the shoulder/berms and disposal the same to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge-4th year
58Triming of grass and weeds from the shoulder/berms and disposal the same to suitable location as per technical specification Clause 1914 of MORD as per direction of the Engineer in charge-5th year Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56604280
AUTHORITY Government Departments
TENDER VALUE 1.38 Crore
LAST DATE 03-08-2026
Authority
Authority Name Rural Works Department
Work Description Tender for Construction Of Sh3 At 74Th Km To Pipalpali Road In The District Of Bargarh Under Mmsy(Unconnected Habitations Under Gramodaya) For The Year 2026-27
Basic Detail
Tender No Road Tender Online RWCSBP-16/2026-27
Bidding Type Tender
Location
City Bargarh
State Odisha
Key Dates
Publish Date 22 Jul 2026
Submission Date 03 Aug 2026
Open Date 04 Aug 2026
Finance
Tender Value 1.38 Crore
Tender Fee 10000
EMD 1.38 Lakhs
Exemption Available
Document List
0d24682e-0fc4-48a2-9e78-c7f1fd3d7702.html
BOQ_602907.xls
Tendernotice_1.pdf
Tendernotice_2 (6).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 22, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 03, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days
Aug 04, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 8 days

Tender Documents

Download All (ZIP) ↓
html

0d24682e-0fc4-48a2-9e78-c7f1fd3d7702.html

xls

BOQ_602907.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2 (6).pdf