Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; 1692939; Service Provider - Monthly S Ling, Testing, Analysis As Per Norms Set By Up Pollution Control Board For Water Effluents Of A
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Industry Unit; 1692939; Service Provider - Monthly S Ling, Testing, Analysis As Per Norms Set By Up Pollution Control Board For Water Effluents Of Ash Pond 2X110 Mw, Ash Pond 2X210 Mw, Cooling Water, Colony Sewage And Drain Discharge Of Unit-I, Ii,Iii,Iv,V & Vi (One Job=S Le At Each Place). , S Ling, Testings, Analysis For Water Effluents As Per Norms Set By Up Pollution Control Board Of Etp 2X210mw & 2X250mw, Betwa Downstream And Betwa Up Stream (One Job=S Le At Each Place). , Monthly S Ling Testing And Ansalysis Of Ambient Air As Per Norms Of Uppcb Near Coal Handling Planst, Near Main Gate Of Plant, Near Vip Guest House, Near Reporting Police Station Parichha And Nearby Village Area Which Are Cover All The Four Directions Of Plant. (One Job=S Le At Each Place). , Monthly S Ling Testing, Analysis Of Stack Emission And Dg Sets Of 2X210 Mw& 2X250mw (One Job=S Le At Each Place). , Monthly S Ling Testing, Analysis For Noise Level At Turbine Floor Of 2X210 Mw& 2X250mw, Ground Floor Near Bfp Of 2X210 Mw & 2X250mw & Near Crusher House , Dg Sets Of 2X210 Mw& 2X250mw (One Job=S Le At Each Place). , Monthly S Ling Testing, Analysis For Ground Water At Main Gate, Coal Handling Plant, Ash Dyke Of 2X110mw, Ash Dyke 2X210 Mw/2X250 Mw & Colony (One Job=S Le At Each Place). , Preparation Of Annual Environmental Audit Report For Parichha Thermal Power Project.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Monthly sampling, testing, analysis as per norms set by UP Pollution Control Board for water effluents of Ash Pond 2X110 MW, Ash Pond 2X210 MW, Cooling water, Colony sewage and Drain discharge of Unit-I, II,III,IV,V & VI (One job=sample at each place). | Monthly sampling, testing, analysis as per norms set by UP Pollution Control Board for water effluents of Ash Pond 2X110 MW, Ash Pond 2X210 MW, Cooling water, Colony sewage and Drain discharge of Unit-I, II,III,IV,V & VI (One job=sample at each place). |
| 2 | Sampling, testings, analysis for water effluents as per norms set by UP Pollution Control board of ETP 2x210MW & 2x250MW, Betwa downstream and Betwa up stream (one job=sample at each place). | Sampling, testings, analysis for water effluents as per norms set by UP Pollution Control board of ETP 2x210MW & 2x250MW, Betwa downstream and Betwa up stream (one job=sample at each place). |
| 3 | Monthly sampling testing and ansalysis of ambient air as per norms of UPPCB near coal handling planst, near main gate of plant, near VIP guest house, near reporting Police Station Parichha and nearby village area which are cover all the four directions of plant. (one job=sample at each place). | Monthly sampling testing and ansalysis of ambient air as per norms of UPPCB near coal handling planst, near main gate of plant, near VIP guest house, near reporting Police Station Parichha and nearby village area which are cover all the four directions of plant. (one job=sample at each place). |
| 4 | Monthly sampling testing, analysis of stack emission and DG sets of 2x210 MW& 2x250MW (one job=sample at each place). | Monthly sampling testing, analysis of stack emission and DG sets of 2x210 MW& 2x250MW (one job=sample at each place). |
| 5 | Monthly sampling testing, analysis for noise level at turbine floor of 2x210 MW& 2x250MW, ground floor near BFP of 2x210 MW & 2x250MW & near crusher house , DG sets of 2x210 MW& 2x250MW (one job=sample at each place). | Monthly sampling testing, analysis for noise level at turbine floor of 2x210 MW& 2x250MW, ground floor near BFP of 2x210 MW & 2x250MW & near crusher house , DG sets of 2x210 MW& 2x250MW (one job=sample at each place). |
| 6 | Monthly sampling testing, analysis for ground water at Main gate, Coal handling Plant, Ash dyke of 2x110MW, Ash dyke 2x210 MW/2x250 MW & colony (one job=sample at each place). | Monthly sampling testing, analysis for ground water at Main gate, Coal handling Plant, Ash dyke of 2x110MW, Ash dyke 2x210 MW/2x250 MW & colony (one job=sample at each place). |
| 7 | Preparation of annual environmental audit report for Parichha Thermal Power Project. | Preparation of annual environmental audit report for Parichha Thermal Power Project. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
TodayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 21 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender