Tender For Fixing Of Rate Contract For Handling And Fabrication Of Material At Divisional Store Udh Ur Of Electric Division, Jpdcl Udh Ur For Fy 2026-27 Or Till The Next Year Tender Is Finalized.
Tender Overview
Project Description
Tender for Fixing Of Rate Contract For Handling And Fabrication Of Material At Divisional Store Udh Ur Of Electric Division, Jpdcl Udh Ur For Fy 2026-27 Or Till The Next Year Tender Is Finalized. , Unloading Of Plain Cement Concrete Poles 11 Mtr Long , Unloading Of Plain Cement Concrete Poles 9 Mtr Long , Unloading Of Plain Cement Concrete Poles 8 Mtr Long , Unloading Of St Poles 13 Mtr Long , Unloading Of St Poles 11Mtr Long , Unloading Of St Poles 9 Mtr Long , Unloading Of St Poles 8 Mtr Long , Loading Of Plain Cement Concrete Poles 11 Mtr Long , Loading Of Plain Cement Concrete Poles 9 Mtr Long , Loading Of Plain Cement Concrete Poles 8 Mtr Long , Loading Of St Poles 13 Mtr Long , Loading Of St Poles 11Mtr Long , Loading Of St Poles 9 Mtr Long , Loading Of St Poles 8 Mtr Long , Shifting/ Dragging Of Existing/ New Plain Cement Concrete (8/9/11 Mtrs.) At A Average Distance Upto 25 Mtr For Stacking To Easily Accesible Place For Loading/Unoading Purpose And Its Stacking , Shifting/ Dragging Of Existing / New St Poles 8/9/11 Mtrs.) At A Average Distance Upto 25 Mtr For Stacking To Easily Accesible Place For Loading/Unoading Purpose And Its Stacking , Unloading Of 25 Kva Transformer(New/ Old/ Damaged Transformer) , Unloading Of 50/63 Kva Transformer(New/ Old/ Damaged Transformer) , Unloading Of 100 Kva Transformer(New/ Old/ Damaged Transformer) , Unloading Of 200/250 Kva Transformer(New/ Old/ Damaged Transformer) , Unloading Of 300/400/500 Kva Transformer(New/ Old / Damaged Transformer) , Unloading Of 630 Kva Transformer(New/ Old/ Damaged Transformer) , Loading Of 25 Kva Transformer , Loading Of 50/63 Kva Transformer , Loading Of 100 Kva Transformer , Loading Of 200/ 250 Kva Transformer , Loading Of 300/400/500 Kva Transformer , Loading Of 630 Kva Transformer , Dragging Of Existing / New / Damaged 25 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing / New 50/ 63 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing / New / Damaged 100 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing /New /Damaged 200/ 250 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing /New/Damaged 300/ 400/500 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing / New/ Damaged 630 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Unloading Of Old/ New Acsr Conductor , Loading Of Old/ New Acsr Conductor , Shifting Of Old/ New Acsr Conductor From Unloading Site To Stacking Site At An Average Distance Upto 25 Mtr. And Its Stacking , Unloading Of Dpc Cu/ Al Wire , Loading Of Dpc Cu/ Al Wire , Unloading Or Loading Of Se/Dpc Al Wire Of All Sizes , Unloading Or Loading Of Se/Dpc Cu Wire Of All Sizes , Unloading Or Loading Of Lv Bush Rod M-12 , Unloading Or Loading Of Lv Bush Rod M-20 , Unloading Or Loading Of Lv Bush Rod M-30 , Unloading Or Loading Of Hv Bush 11Kv , Unloading Or Loading Of Hv Bush Rod , Unloading Or Loading Of Lv Bush M-12 , Unloading Or Loading Of Lv Bush M-20 , Unloading Or Loading Of Lv Bush M-25/30 , Unloading Or Loading Of Lethoride Paper , Unloading Or Loading Of Khaki Paper , Unloading Or Loading Of Gutties , Unloading Or Loading Of Washer Of Sizes , Unloading Or Loading Of Cork Sheet Of Sizes , Unloading Or Loading Of Cork Srip Of Sizes , Unloading Or Loading Of Cotton Tape/Bovin Tape Of Sizes , Unloading Or Loading Of Craft Paper , Unloading Or Loading Of Packing Sheet/Pressboard , Unloading Or Loading Of Wooden Wedges , Unloading Or Loading Of Bakelite Tubes 1 Mtr , Unloading Or Loading Of Welding Rod , Unloading Or Loading Of Transformer Oil , Unloading Or Loading Of Breather , Unloading Or Loading Of Bamboo Ladder/Aluminium Telescopic Ladder , Shifting Of Allied Material For Ht/Lt/Substation(I.E Disc/Pin/Shackle/Busbar Insulator/Ai Busbar/Gi/Guy Wire/ Thimbles/Earthing Rodetc) From Unloading Site To Stacking Site And Stacking Properly , Shifting Of Allied Material For Ht/Lt/Substation(I.E Disc/Pin/Shackle/Busbar Insulator/Ai Busbar/Gi/Guy Wire/ Thimbles/Earthing Rod Etc) For Making Space For Other Store Material , Stacking Of Single/ Three Phase Meters , Unloading Of Channel/ Angle/ Flat Iron , Loading Of Channel/Angle/Flat Iron , Carriage/ Shifting Of Channel/ Angle/ Flat Iron At An Average Distance Upto 25 Mtr. From Unloading Site To Stacking Site And Its Stacking Properly , Unloading Of Pvc Cable Single Core 95/ 120/ 185 Mm Sq , Loading Of Pvc Cable Single Core 95/ 120/ 185 Mm Sq , Carriage/Shifting Of Pvc Cable Single Core 95/ 120/ 185 Mm Sq At An Average Distance Upto 25 Mtr. , Unloading Of Pvc Cable Single Core 300/ 400 Mm Sq , Loading Of Pvc Cable Single Core 300/ 400 Mm Sq , Carriage Of Pvc Cable Single Core 300/ 400 Mm Sq At An Average Distance Upto 25 Mtr. , Unloading Of Pvc Cable Single Core 630 Mm Sq , Loading Of Pvc Cable Single Core 630 Mm Sq , Carriage Of Pvc Cable Single Core 630 Mm Sq At An Average Distance Upto 25 Mtr. , Unloading Of Ab/Xlpe 25/ 35/ 50/ 70/ 95 Mm Sq Single Core Cable For Ht/ Lt Lines , Loading Of Ab/Xlpe 25/35/50/70/95 Mm Sq Single Core Cable For Ht/ Lt Lines , Carriage Of Ab/Xlpe 25 /35/ 50/ 70/ 95 Mm Sq Single Core Cable For Ht/ Lt Lines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/Xlpe 120/ 150/ 185/ 240 Mmsq Single Core Cable For Ht/ Lt Lines , Loading Of Ab/ Xlpe 120/ 150/ 185/ 240 Mm Sq Single Core Cable For Ht/Lt Lines , Carriage Of Ab/ Xlpe 120/ 150/ 185/ 240 Mm Sq Single Core Cable For Ht/ Ltlines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/Xlpe 25/ 35/ 50 Mm Sq Three Core Cable For Ht/ Lt Lines , Loading Of Ab/Xlpe 25/ 35/ 50 Mm Sq Three Core Cable For Ht/ Lt Lines , Carriage Of Ab/Xlpe 25/ 35/ 50 Mm Sq Three Core Cable For Ht/Lt Lines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/Xlpe 70/ 95 Mm Sq Three Core Cable For Ht/Lt Lines , Loading Of Ab/Xlpe 70/ 95Mmsq Three Core Cable For Ht/Lt Lines , Carriage Of Ab/Xlpe 70/ 95 Mm Sq Three Core Cable For Ht Lines Upto 25 Mtrs. , Unloading Of Ab/Xlpe 120/ 150 Mm Sq Three Core Cable For Ht Lines , Loading Of Ab/Xlpe 120/ 150 Mm Sq Three Core Cable For Ht /Ltlines , Carriage Of Ab/Xlpe 120/ 150 Mm Sq Three Core Cable For Ht/Lt Lines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/ Xlpe 185/ 240 Mm Sq Three Core Cable For Ht/ Lt Lines , Loading Of Ab/Xlpe 185/ 240 Mm Sq Three Core Cable For Ht Lines , Carriage Of Ab/Xlpe 185/240 Mm Sq Three Core Cable For Ht Lines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/ Xlpe 300/ 400 Mm Sq Three Core Cable For Ht Lines , Loading Of Ab/Xlpe 300/ 400 Mm Sq Three Core Cable For Ht/ Lt Lines , Carriage Of Ab/Xlpe 300/ 400 Mm Sq Three Core Cable For Ht/ Lt Lines At An Average Distance Upto 25 Mtr. , Fabrication Of Channel Cross Arms Of Sorts/Angle Arms Of Sorts , Fabrication Of Clamps From Ms Flat (Suitable For 8 Mtr/9Mtr, 11 Mtr And 13 Mtr Poles) , Fabrication Of Earthing Plates From Ms Plate , Fabrication Of Earthing Spikes From Ms Tar Steel Of Sorts As Per Rec Standards , Fabrication Of Foundation Bolts From Ms Tor Steel Including Threading As Per Rec Standards , Fabrication Of Earthing Pipe From Gi Pipe And Welding Of Earthing Plate As Per Rec Standards , Unloading/Loading Of Straight Jointing Kit/Heat Shrinkable Kit For Ab/ Xlpe Cables Of Ht/ Lt Lines , Unreeling, Laying Of Acsr Weasel/ Squirrel/ Rabbit Conductor , Cutting Of Acsr Weasel/ Squirrel/ Rabbit Conductor, Making Bundles Of Conductor And Stacking Within 25 Mtrs. , Unreeling, Laying Of Pvc Cables , Cutting And Making Bundles Of Pvc Cables And Stacking , Unreeling, Laying Of Xlpe Cables/Abc Cables , Cutting And Making Bundles Of Xlpe Cables And Stacking , Unreeling, Laying Of Pvc/ Xlpe/ Ab Cables , Cutting And Making Bundles Of Pvc/ Xlpe/ Ab Cables And Stacking , Unloading Of Link/ Knife/ Hg/ Do/ La Set , Loading Of Hg/ Do/ La/ Go Set , Carriage/ Stacking Of Hg/ Do/ La/ Go Set At An Average Distance Upto 25 Mtr. , Unloading Of Ct/ Pt Unit , Loading Of Ct/ Pt Unit , Carriage/ Stacking Of Ct/ Pt Unit At An Average Distance Upto 50 Mtr , Checking/Counting/Meggering Of Line/Hardware Materials Viz Disc Insulators ,Fittings, Pin Insulators With Pins Etc , Checking/Measuring/ Weighing Of Line/Workorkkshop Material Viz Nuts And Bolts, Guy Wire, Gi Wire, Al. Strips, Dpc Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol Etc.And Stacking , Cutting Of Vegetation, Bushes , Wild Grass, Trees To Avoid Any Mishappening Of Untoward Incidents , Carriage Of Green Vegetation Bushes , Wild Grass, Trees After Cutting And Dumping Away From Store , Straightening Of Tilted Fencing Posts In The Store Premises For Repair Of Fecning , Insertion Of New Fencing Posts In The Store For Repair Of Fencing , Dismantling Of Existing Mesh Fencing , Fixing Of Mesh Fencing , Fixing Of Cgi Sheets , Dismantling Of Cgi Sheets , Meggering, Tightening Of Nuts And Bolts, Oil Seals, Breathers Checkings, Visual Inspections Of Transfomers 25/63/100 Kva , Meggering, Tightening Of Nuts And Bolts, Oil Seals, Breathers Checkings, Visual Inspections Of Transfomers 250/400/630Kva , Lifting Of Unserviceable Items Like, Damaged Transformers(Outer Frame Of Dts), Broken Insulators Of Sorts, ,Al/ Cu/ Scrap/ Bushrods Of Sorts, Empty Barells, Broken Cgi Sheerts, Iron Scraps, Damaged Energy Meters, Ct/Pts Sets From Existing Place To Another Suitable Place And Its Stacking , Unloading Of Old Loose Conductor And Making Bundles , Unloading Of 11Kv Disc Insulators / Pin Insulators , Loading Of 11Kv Disc Insulators/ Pin Insulators , Carriage/ Stacking Of 11Kv Disc Insulators/ Pin Insulators , Unloading Of Shackle/ Busbar Insulators , Loading Of Shackle/ Busbar Insulators , Carriage/ Stacking Of Shackle/ Busbar Insulators , Unloading Of Al Busbar/ Al Strip , Loading Of Al Busbar/ Al Strip , Carriage/Stacking Of Al Busbar/ Al Strip , Unloading Of Gi Wire / Guy Wire , Loading Of Gi Wire / Guy Wire , Carriage/ Stacking Of Gi Wire / Guy Wire , Carriage/Stacking Of Hv/ Lv Bush Insulators , Carriage/Stacking Of Hv/Lv Bushrods , Unloading Of Earthing Rods Etc , Loading Of Earthing Rods Etc , Un Loading Of Lt Switch 100A/ 200A , Drainage Of Transformer Oil From Damaged Transformer , Filling Of Transformer Oil Old In Barrel , Loading Of Lt Switch 100A/ 200A , Unloading/Loading Of Flood Light , Unloading/Loading Of Changeover Switch , Unloading/Loading Of Trivector Meter , Carriage/Stacking Of Lt Switch 100A/200A , Carriage/ Stacking Of Earthing Rods Etc , Fabrication Of Guy Rod ,Tb,Ap , Fabrication Of V-Cross , Making Of Holes For Fabrication Of Channel/Flat/Angles , Testing Of Transformers (25/63/200/250/400/630 Kva)
BOQ
| Sl. No. | Item Description |
| 1 | Unloading of PCC Poles 11 Mtr Long |
| 2 | Unloading of PCC Poles 9 Mtr Long |
| 3 | Unloading of PCC Poles 8 Mtr Long |
| 4 | Unloading of ST Poles 13 Mtr Long |
| 5 | Unloading of ST Poles 11Mtr Long |
| 6 | Unloading of ST Poles 9 Mtr Long |
| 7 | Unloading of ST Poles 8 Mtr Long |
| 8 | Loading of PCC Poles 11 Mtr Long |
| 9 | Loading of PCC Poles 9 Mtr Long |
| 10 | Loading of PCC Poles 8 Mtr Long |
| 11 | Loading of ST Poles 13 Mtr Long |
| 12 | Loading of ST Poles 11Mtr Long |
| 13 | Loading of ST Poles 9 Mtr Long |
| 14 | Loading of ST Poles 8 Mtr Long |
| 15 | Shifting/ Dragging of existing/ New PCC (8/9/11 mtrs.) at a average distance upto 25 Mtr for stacking to easily accesible place for loading/Unoading Purpose and its stacking |
| 16 | Shifting/ Dragging of existing / New ST Poles 8/9/11 mtrs.) at a average distance upto 25 Mtr for stacking to easily accesible place for loading/Unoading Purpose and its stacking |
| 17 | Unloading of 25 KVA Transformer(New/ Old/ Damaged Transformer) |
| 18 | Unloading of 50/63 KVA Transformer(New/ Old/ Damaged Transformer) |
| 19 | Unloading of 100 KVA Transformer(New/ Old/ Damaged Transformer) |
| 20 | Unloading of 200/250 KVA Transformer(New/ Old/ Damaged Transformer) |
| 21 | Unloading of 300/400/500 KVA Transformer(New/ Old / Damaged Transformer) |
| 22 | Unloading of 630 KVA Transformer(New/ Old/ Damaged Transformer) |
| 23 | Loading of 25 KVA Transformer |
| 24 | Loading of 50/63 KVA Transformer |
| 25 | Loading of 100 KVA Transformer |
| 26 | Loading of 200/ 250 KVA Transformer |
| 27 | Loading of 300/400/500 KVA Transformer |
| 28 | Loading of 630 KVA Transformer |
| 29 | Dragging of existing / New / Damaged 25 KVA Tranformer at an average distance upto 25 Mtr. and its stacking properly |
| 30 | Dragging of existing / New 50/ 63 KVA Tranformer at an average distance upto 25 Mtr. and its stacking properly |
| 31 | Dragging of existing / New / Damaged 100 KVA Tranformer at an average distance upto 25 Mtr. and its stacking properly |
| 32 | Dragging of existing /New /Damaged 200/ 250 KVA Tranformer at an average distance upto 25 Mtr. and its stacking properly |
| 33 | Dragging of existing /New/Damaged 300/ 400/500 KVA Tranformer at an average distance upto 25 Mtr. and its stacking properly |
| 34 | Dragging of existing / New/ Damaged 630 KVA Tranformer at an average distance upto 25 Mtr. and its stacking properly |
| 35 | Unloading of Old/ New ACSR Conductor |
| 36 | Loading of Old/ New ACSR Conductor |
| 37 | Shifting of Old/ New ACSR Conductor from unloading site to stacking site at an average distance upto 25 Mtr. and its stacking |
| 38 | Unloading of DPC CU/ AL Wire |
| 39 | Loading of DPC CU/ AL Wire |
| 40 | Unloading or Loading of SE/DPC AL Wire of all sizes |
| 41 | Unloading or Loading of SE/DPC Cu Wire of all sizes |
| 42 | Unloading or Loading of LV Bush Rod M-12 |
| 43 | Unloading or Loading of LV Bush Rod M-20 |
| 44 | Unloading or Loading of LV Bush Rod M-30 |
| 45 | Unloading or Loading of HV Bush 11KV |
| 46 | Unloading or Loading of HV Bush Rod |
| 47 | Unloading or Loading of LV Bush M-12 |
| 48 | Unloading or Loading of LV Bush M-20 |
| 49 | Unloading or Loading of LV Bush M-25/30 |
| 50 | Unloading or Loading of Lethoride Paper |
| 51 | Unloading or Loading of Khaki Paper |
| 52 | Unloading or Loading of Gutties |
| 53 | Unloading or Loading of Washer of sizes |
| 54 | Unloading or Loading of Cork Sheet of sizes |
| 55 | Unloading or Loading of Cork Srip of sizes |
| 56 | Unloading or Loading of Cotton tape/Bovin Tape of sizes |
| 57 | Unloading or Loading of Craft Paper |
| 58 | Unloading or Loading of Packing sheet/pressboard |
| 59 | Unloading or Loading of Wooden wedges |
| 60 | Unloading or Loading of Bakelite tubes 1 mtr |
| 61 | Unloading or Loading of Welding rod |
| 62 | Unloading or Loading of Transformer Oil |
| 63 | Unloading or Loading of Breather |
| 64 | Unloading or Loading of Bamboo Ladder/Aluminium Telescopic ladder |
| 65 | Shifting of allied material for HT/LT/Substation(i.e Disc/Pin/Shackle/Busbar Insulator/AI Busbar/GI/Guy wire/ Thimbles/Earthing RodETC) from unloading site to stacking site and stacking properly |
| 66 | Shifting of allied material for HT/LT/Substation(i.e Disc/Pin/Shackle/Busbar Insulator/AI Busbar/GI/Guy wire/ Thimbles/Earthing Rod etc) for making space for other store material |
| 67 | Stacking of Single/ Three phase meters |
| 68 | UnLoading of Channel/ Angle/ Flat Iron |
| 69 | Loading of Channel/Angle/Flat Iron |
| 70 | Carriage/ Shifting of Channel/ Angle/ Flat Iron at an average distance upto 25 Mtr. from unloading site to stacking site and its stacking properly |
| 71 | Unloading of PVC Cable single core 95/ 120/ 185 mm sq |
| 72 | Loading of PVC Cable single core 95/ 120/ 185 mm sq |
| 73 | Carriage/shifting of PVC Cable single core 95/ 120/ 185 mm sq at an average distance upto 25 Mtr. |
| 74 | UnLoading of PVC Cable single core 300/ 400 mm sq |
| 75 | Loading of PVC Cable single core 300/ 400 mm sq |
| 76 | Carriage of PVC Cable single core 300/ 400 mm sq at an average distance upto 25 Mtr. |
| 77 | UnLoading of PVC Cable single core 630 mm sq |
| 78 | Loading of PVC Cable single core 630 mm sq |
| 79 | Carriage of PVC Cable single core 630 mm sq at an average distance upto 25 Mtr. |
| 80 | Unloading of AB/XLPE 25/ 35/ 50/ 70/ 95 mm sq single core Cable for HT/ LT Lines |
| 81 | Loading of AB/XLPE 25/35/50/70/95 mm sq single core Cable for HT/ LT Lines |
| 82 | Carriage of AB/XLPE 25 /35/ 50/ 70/ 95 mm sq single core Cable for HT/ LT Lines at an average distance upto 25 Mtr. |
| 83 | Unloading of AB/XLPE 120/ 150/ 185/ 240 mmsq single core Cable for HT/ LT Lines |
| 84 | Loading of AB/ XLPE 120/ 150/ 185/ 240 mm sq single core Cable for HT/LT Lines |
| 85 | Carriage of AB/ XLPE 120/ 150/ 185/ 240 mm sq single core Cable for HT/ LTLines at an average distance upto 25 Mtr. |
| 86 | Unloading of AB/XLPE 25/ 35/ 50 mm sq three core Cable for HT/ LT Lines |
| 87 | Loading of AB/XLPE 25/ 35/ 50 mm sq three core Cable for HT/ LT Lines |
| 88 | Carriage of AB/XLPE 25/ 35/ 50 mm sq three core Cable for HT/LT Lines at an average distance upto 25 Mtr. |
| 89 | Unloading of AB/XLPE 70/ 95 mm sq three core Cable for HT/LT Lines |
| 90 | Loading of AB/XLPE 70/ 95mmsq three core Cable for HT/LT Lines |
| 91 | Carriage of AB/XLPE 70/ 95 mm sq three core Cable for HT Lines upto 25 mtrs. |
| 92 | Unloading of AB/XLPE 120/ 150 mm sq three core Cable for HT Lines |
| 93 | Loading of AB/XLPE 120/ 150 mm sq three core Cable for HT /LTLines |
| 94 | Carriage of AB/XLPE 120/ 150 mm sq three core Cable for HT/LT Lines at an average distance upto 25 Mtr. |
| 95 | UnLoading of AB/ XLPE 185/ 240 mm sq three core Cable for HT/ LT Lines |
| 96 | Loading of AB/XLPE 185/ 240 mm sq three core Cable for HT Lines |
| 97 | Carriage of AB/XLPE 185/240 mm sq three core Cable for HT Lines at an average distance upto 25 Mtr. |
| 98 | UnLoading of AB/ XLPE 300/ 400 mm sq three core Cable for HT Lines |
| 99 | Loading of AB/XLPE 300/ 400 mm sq three core Cable for HT/ LT Lines |
| 100 | Carriage of AB/XLPE 300/ 400 mm sq three core Cable for HT/ LT Lines at an average distance upto 25 Mtr. |
| 101 | Fabrication of Channel Cross Arms of sorts/angle arms of sorts |
| 102 | Fabrication of clamps from MS flat (suitable for 8 mtr/9mtr, 11 mtr and 13 mtr poles) |
| 103 | Fabrication of Earthing Plates from MS plate |
| 104 | Fabrication of earthing spikes from MS tar steel of sorts as per REC Standards |
| 105 | Fabrication of foundation bolts from MS tor steel including threading as per REC Standards |
| 106 | Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards |
| 107 | Unloading/Loading of Straight jointing kit/Heat shrinkable Kit for AB/ XLPE cables of HT/ LT Lines |
| 108 | Unreeling, laying of ACSR Weasel/ Squirrel/ Rabbit Conductor |
| 109 | Cutting of ACSR Weasel/ Squirrel/ Rabbit conductor, making bundles of conductor and stacking within 25 mtrs. |
| 110 | Unreeling, laying of PVC Cables |
| 111 | Cutting and making bundles of PVC Cables and stacking |
| 112 | Unreeling, laying of XLPE Cables/ABC Cables |
| 113 | Cutting and making bundles of XLPE Cables and stacking |
| 114 | Unreeling, laying of PVC/ XLPE/ AB Cables |
| 115 | Cutting and making bundles of PVC/ XLPE/ AB Cables and stacking |
| 116 | Unloading of Link/ Knife/ HG/ DO/ LA Set |
| 117 | Loading of HG/ DO/ LA/ GO Set |
| 118 | Carriage/ Stacking of HG/ DO/ LA/ GO Set at an average distance upto 25 Mtr. |
| 119 | Unloading of CT/ PT Unit |
| 120 | Loading of CT/ PT Unit |
| 121 | Carriage/ Stacking of CT/ PT Unit at an average distance upto 50 Mtr |
| 122 | Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators ,fittings, Pin insulators with pins etc |
| 123 | Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc.and stacking |
| 124 | Cutting of Vegetation, Bushes , Wild Grass, trees to avoid any mishappening of untoward incidents |
| 125 | Carriage of Green Vegetation Bushes , Wild Grass, trees after cutting and dumping away from store |
| 126 | Straightening of tilted fencing posts in the store premises for repair of fecning |
| 127 | Insertion of new fencing Posts in the store for repair of fencing |
| 128 | Dismantling of existing mesh fencing |
| 129 | Fixing of mesh Fencing |
| 130 | Fixing of CGI Sheets |
| 131 | Dismantling of CGI sheets |
| 132 | Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 25/63/100 KVA |
| 133 | Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 250/400/630KVA |
| 134 | Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking |
| 135 | Unloading of old loose conductor and making bundles |
| 136 | UnLoading of 11KV Disc Insulators / Pin Insulators |
| 137 | Loading of 11kv Disc Insulators/ Pin Insulators |
| 138 | Carriage/ Stacking of 11kv Disc Insulators/ Pin Insulators |
| 139 | UnLoading of Shackle/ Busbar Insulators |
| 140 | Loading of Shackle/ Busbar Insulators |
| 141 | Carriage/ Stacking of Shackle/ Busbar Insulators |
| 142 | UnLoading of Al Busbar/ Al Strip |
| 143 | Loading of Al Busbar/ Al Strip |
| 144 | Carriage/Stacking of Al Busbar/ Al Strip |
| 145 | UnLoading of GI wire / Guy wire |
| 146 | Loading of GI wire / Guy wire |
| 147 | Carriage/ Stacking of GI wire / Guy wire |
| 148 | Carriage/Stacking of HV/ LV Bush Insulators |
| 149 | Carriage/Stacking of HV/LV Bushrods |
| 150 | Unloading of Earthing rods etc |
| 151 | Loading of Earthing rods etc |
| 152 | Un loading of LT Switch 100A/ 200A |
| 153 | Drainage of transformer oil from damaged transformer |
| 154 | Filling of transformer oil old in barrel |
| 155 | Loading of LT Switch 100A/ 200A |
| 156 | Unloading/Loading Of Flood light |
| 157 | Unloading/Loading of changeover switch |
| 158 | Unloading/Loading of Trivector Meter |
| 159 | Carriage/Stacking of LT Switch 100A/200A |
| 160 | Carriage/ Stacking of Earthing rods etc |
| 161 | Fabrication of Guy Rod ,TB,AP |
| 162 | Fabrication of V-cross |
| 163 | Making of Holes for fabrication of Channel/Flat/Angles |
| 164 | Testing of Transformers (25/63/200/250/400/630 KVA) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender