Power Government Departments Closing in 20 days TDR #56603213

Tender For Fixing Of Rate Contract For Handling And Fabrication Of Material At Divisional Store Udh Ur Of Electric Division, Jpdcl Udh Ur For Fy 2026-27 Or Till The Next Year Tender Is Finalized.

Issued by Government Departments · Udhampur, Jammu and Kashmir
Tender Value
Ref. Documents
Estimated cost
Bid Submission
12 Aug 2026
20 days left
EMD
1 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Udhampur → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Fixing Of Rate Contract For Handling And Fabrication Of Material At Divisional Store Udh Ur Of Electric Division, Jpdcl Udh Ur For Fy 2026-27 Or Till The Next Year Tender Is Finalized. , Unloading Of Plain Cement Concrete Poles 11 Mtr Long , Unloading Of Plain Cement Concrete Poles 9 Mtr Long , Unloading Of Plain Cement Concrete Poles 8 Mtr Long , Unloading Of St Poles 13 Mtr Long , Unloading Of St Poles 11Mtr Long , Unloading Of St Poles 9 Mtr Long , Unloading Of St Poles 8 Mtr Long , Loading Of Plain Cement Concrete Poles 11 Mtr Long , Loading Of Plain Cement Concrete Poles 9 Mtr Long , Loading Of Plain Cement Concrete Poles 8 Mtr Long , Loading Of St Poles 13 Mtr Long , Loading Of St Poles 11Mtr Long , Loading Of St Poles 9 Mtr Long , Loading Of St Poles 8 Mtr Long , Shifting/ Dragging Of Existing/ New Plain Cement Concrete (8/9/11 Mtrs.) At A Average Distance Upto 25 Mtr For Stacking To Easily Accesible Place For Loading/Unoading Purpose And Its Stacking , Shifting/ Dragging Of Existing / New St Poles 8/9/11 Mtrs.) At A Average Distance Upto 25 Mtr For Stacking To Easily Accesible Place For Loading/Unoading Purpose And Its Stacking , Unloading Of 25 Kva Transformer(New/ Old/ Damaged Transformer) , Unloading Of 50/63 Kva Transformer(New/ Old/ Damaged Transformer) , Unloading Of 100 Kva Transformer(New/ Old/ Damaged Transformer) , Unloading Of 200/250 Kva Transformer(New/ Old/ Damaged Transformer) , Unloading Of 300/400/500 Kva Transformer(New/ Old / Damaged Transformer) , Unloading Of 630 Kva Transformer(New/ Old/ Damaged Transformer) , Loading Of 25 Kva Transformer , Loading Of 50/63 Kva Transformer , Loading Of 100 Kva Transformer , Loading Of 200/ 250 Kva Transformer , Loading Of 300/400/500 Kva Transformer , Loading Of 630 Kva Transformer , Dragging Of Existing / New / Damaged 25 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing / New 50/ 63 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing / New / Damaged 100 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing /New /Damaged 200/ 250 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing /New/Damaged 300/ 400/500 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing / New/ Damaged 630 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Unloading Of Old/ New Acsr Conductor , Loading Of Old/ New Acsr Conductor , Shifting Of Old/ New Acsr Conductor From Unloading Site To Stacking Site At An Average Distance Upto 25 Mtr. And Its Stacking , Unloading Of Dpc Cu/ Al Wire , Loading Of Dpc Cu/ Al Wire , Unloading Or Loading Of Se/Dpc Al Wire Of All Sizes , Unloading Or Loading Of Se/Dpc Cu Wire Of All Sizes , Unloading Or Loading Of Lv Bush Rod M-12 , Unloading Or Loading Of Lv Bush Rod M-20 , Unloading Or Loading Of Lv Bush Rod M-30 , Unloading Or Loading Of Hv Bush 11Kv , Unloading Or Loading Of Hv Bush Rod , Unloading Or Loading Of Lv Bush M-12 , Unloading Or Loading Of Lv Bush M-20 , Unloading Or Loading Of Lv Bush M-25/30 , Unloading Or Loading Of Lethoride Paper , Unloading Or Loading Of Khaki Paper , Unloading Or Loading Of Gutties , Unloading Or Loading Of Washer Of Sizes , Unloading Or Loading Of Cork Sheet Of Sizes , Unloading Or Loading Of Cork Srip Of Sizes , Unloading Or Loading Of Cotton Tape/Bovin Tape Of Sizes , Unloading Or Loading Of Craft Paper , Unloading Or Loading Of Packing Sheet/Pressboard , Unloading Or Loading Of Wooden Wedges , Unloading Or Loading Of Bakelite Tubes 1 Mtr , Unloading Or Loading Of Welding Rod , Unloading Or Loading Of Transformer Oil , Unloading Or Loading Of Breather , Unloading Or Loading Of Bamboo Ladder/Aluminium Telescopic Ladder , Shifting Of Allied Material For Ht/Lt/Substation(I.E Disc/Pin/Shackle/Busbar Insulator/Ai Busbar/Gi/Guy Wire/ Thimbles/Earthing Rodetc) From Unloading Site To Stacking Site And Stacking Properly , Shifting Of Allied Material For Ht/Lt/Substation(I.E Disc/Pin/Shackle/Busbar Insulator/Ai Busbar/Gi/Guy Wire/ Thimbles/Earthing Rod Etc) For Making Space For Other Store Material , Stacking Of Single/ Three Phase Meters , Unloading Of Channel/ Angle/ Flat Iron , Loading Of Channel/Angle/Flat Iron , Carriage/ Shifting Of Channel/ Angle/ Flat Iron At An Average Distance Upto 25 Mtr. From Unloading Site To Stacking Site And Its Stacking Properly , Unloading Of Pvc Cable Single Core 95/ 120/ 185 Mm Sq , Loading Of Pvc Cable Single Core 95/ 120/ 185 Mm Sq , Carriage/Shifting Of Pvc Cable Single Core 95/ 120/ 185 Mm Sq At An Average Distance Upto 25 Mtr. , Unloading Of Pvc Cable Single Core 300/ 400 Mm Sq , Loading Of Pvc Cable Single Core 300/ 400 Mm Sq , Carriage Of Pvc Cable Single Core 300/ 400 Mm Sq At An Average Distance Upto 25 Mtr. , Unloading Of Pvc Cable Single Core 630 Mm Sq , Loading Of Pvc Cable Single Core 630 Mm Sq , Carriage Of Pvc Cable Single Core 630 Mm Sq At An Average Distance Upto 25 Mtr. , Unloading Of Ab/Xlpe 25/ 35/ 50/ 70/ 95 Mm Sq Single Core Cable For Ht/ Lt Lines , Loading Of Ab/Xlpe 25/35/50/70/95 Mm Sq Single Core Cable For Ht/ Lt Lines , Carriage Of Ab/Xlpe 25 /35/ 50/ 70/ 95 Mm Sq Single Core Cable For Ht/ Lt Lines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/Xlpe 120/ 150/ 185/ 240 Mmsq Single Core Cable For Ht/ Lt Lines , Loading Of Ab/ Xlpe 120/ 150/ 185/ 240 Mm Sq Single Core Cable For Ht/Lt Lines , Carriage Of Ab/ Xlpe 120/ 150/ 185/ 240 Mm Sq Single Core Cable For Ht/ Ltlines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/Xlpe 25/ 35/ 50 Mm Sq Three Core Cable For Ht/ Lt Lines , Loading Of Ab/Xlpe 25/ 35/ 50 Mm Sq Three Core Cable For Ht/ Lt Lines , Carriage Of Ab/Xlpe 25/ 35/ 50 Mm Sq Three Core Cable For Ht/Lt Lines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/Xlpe 70/ 95 Mm Sq Three Core Cable For Ht/Lt Lines , Loading Of Ab/Xlpe 70/ 95Mmsq Three Core Cable For Ht/Lt Lines , Carriage Of Ab/Xlpe 70/ 95 Mm Sq Three Core Cable For Ht Lines Upto 25 Mtrs. , Unloading Of Ab/Xlpe 120/ 150 Mm Sq Three Core Cable For Ht Lines , Loading Of Ab/Xlpe 120/ 150 Mm Sq Three Core Cable For Ht /Ltlines , Carriage Of Ab/Xlpe 120/ 150 Mm Sq Three Core Cable For Ht/Lt Lines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/ Xlpe 185/ 240 Mm Sq Three Core Cable For Ht/ Lt Lines , Loading Of Ab/Xlpe 185/ 240 Mm Sq Three Core Cable For Ht Lines , Carriage Of Ab/Xlpe 185/240 Mm Sq Three Core Cable For Ht Lines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/ Xlpe 300/ 400 Mm Sq Three Core Cable For Ht Lines , Loading Of Ab/Xlpe 300/ 400 Mm Sq Three Core Cable For Ht/ Lt Lines , Carriage Of Ab/Xlpe 300/ 400 Mm Sq Three Core Cable For Ht/ Lt Lines At An Average Distance Upto 25 Mtr. , Fabrication Of Channel Cross Arms Of Sorts/Angle Arms Of Sorts , Fabrication Of Clamps From Ms Flat (Suitable For 8 Mtr/9Mtr, 11 Mtr And 13 Mtr Poles) , Fabrication Of Earthing Plates From Ms Plate , Fabrication Of Earthing Spikes From Ms Tar Steel Of Sorts As Per Rec Standards , Fabrication Of Foundation Bolts From Ms Tor Steel Including Threading As Per Rec Standards , Fabrication Of Earthing Pipe From Gi Pipe And Welding Of Earthing Plate As Per Rec Standards , Unloading/Loading Of Straight Jointing Kit/Heat Shrinkable Kit For Ab/ Xlpe Cables Of Ht/ Lt Lines , Unreeling, Laying Of Acsr Weasel/ Squirrel/ Rabbit Conductor , Cutting Of Acsr Weasel/ Squirrel/ Rabbit Conductor, Making Bundles Of Conductor And Stacking Within 25 Mtrs. , Unreeling, Laying Of Pvc Cables , Cutting And Making Bundles Of Pvc Cables And Stacking , Unreeling, Laying Of Xlpe Cables/Abc Cables , Cutting And Making Bundles Of Xlpe Cables And Stacking , Unreeling, Laying Of Pvc/ Xlpe/ Ab Cables , Cutting And Making Bundles Of Pvc/ Xlpe/ Ab Cables And Stacking , Unloading Of Link/ Knife/ Hg/ Do/ La Set , Loading Of Hg/ Do/ La/ Go Set , Carriage/ Stacking Of Hg/ Do/ La/ Go Set At An Average Distance Upto 25 Mtr. , Unloading Of Ct/ Pt Unit , Loading Of Ct/ Pt Unit , Carriage/ Stacking Of Ct/ Pt Unit At An Average Distance Upto 50 Mtr , Checking/Counting/Meggering Of Line/Hardware Materials Viz Disc Insulators ,Fittings, Pin Insulators With Pins Etc , Checking/Measuring/ Weighing Of Line/Workorkkshop Material Viz Nuts And Bolts, Guy Wire, Gi Wire, Al. Strips, Dpc Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol Etc.And Stacking , Cutting Of Vegetation, Bushes , Wild Grass, Trees To Avoid Any Mishappening Of Untoward Incidents , Carriage Of Green Vegetation Bushes , Wild Grass, Trees After Cutting And Dumping Away From Store , Straightening Of Tilted Fencing Posts In The Store Premises For Repair Of Fecning , Insertion Of New Fencing Posts In The Store For Repair Of Fencing , Dismantling Of Existing Mesh Fencing , Fixing Of Mesh Fencing , Fixing Of Cgi Sheets , Dismantling Of Cgi Sheets , Meggering, Tightening Of Nuts And Bolts, Oil Seals, Breathers Checkings, Visual Inspections Of Transfomers 25/63/100 Kva , Meggering, Tightening Of Nuts And Bolts, Oil Seals, Breathers Checkings, Visual Inspections Of Transfomers 250/400/630Kva , Lifting Of Unserviceable Items Like, Damaged Transformers(Outer Frame Of Dts), Broken Insulators Of Sorts, ,Al/ Cu/ Scrap/ Bushrods Of Sorts, Empty Barells, Broken Cgi Sheerts, Iron Scraps, Damaged Energy Meters, Ct/Pts Sets From Existing Place To Another Suitable Place And Its Stacking , Unloading Of Old Loose Conductor And Making Bundles , Unloading Of 11Kv Disc Insulators / Pin Insulators , Loading Of 11Kv Disc Insulators/ Pin Insulators , Carriage/ Stacking Of 11Kv Disc Insulators/ Pin Insulators , Unloading Of Shackle/ Busbar Insulators , Loading Of Shackle/ Busbar Insulators , Carriage/ Stacking Of Shackle/ Busbar Insulators , Unloading Of Al Busbar/ Al Strip , Loading Of Al Busbar/ Al Strip , Carriage/Stacking Of Al Busbar/ Al Strip , Unloading Of Gi Wire / Guy Wire , Loading Of Gi Wire / Guy Wire , Carriage/ Stacking Of Gi Wire / Guy Wire , Carriage/Stacking Of Hv/ Lv Bush Insulators , Carriage/Stacking Of Hv/Lv Bushrods , Unloading Of Earthing Rods Etc , Loading Of Earthing Rods Etc , Un Loading Of Lt Switch 100A/ 200A , Drainage Of Transformer Oil From Damaged Transformer , Filling Of Transformer Oil Old In Barrel , Loading Of Lt Switch 100A/ 200A , Unloading/Loading Of Flood Light , Unloading/Loading Of Changeover Switch , Unloading/Loading Of Trivector Meter , Carriage/Stacking Of Lt Switch 100A/200A , Carriage/ Stacking Of Earthing Rods Etc , Fabrication Of Guy Rod ,Tb,Ap , Fabrication Of V-Cross , Making Of Holes For Fabrication Of Channel/Flat/Angles , Testing Of Transformers (25/63/200/250/400/630 Kva)

BOQ

Name of Work:- Fixing of Rate Contract for Handling and Fabrication of Material at Divisional Store Udh ur of Electric Division, JPDCL Udh ur for FY 2026-27 or till the next year tender is finalized.
Sl. No. Item Description
1Unloading of PCC Poles 11 Mtr Long
2Unloading of PCC Poles 9 Mtr Long
3Unloading of PCC Poles 8 Mtr Long
4Unloading of ST Poles 13 Mtr Long
5Unloading of ST Poles 11Mtr Long
6Unloading of ST Poles 9 Mtr Long
7Unloading of ST Poles 8 Mtr Long
8Loading of PCC Poles 11 Mtr Long
9Loading of PCC Poles 9 Mtr Long
10Loading of PCC Poles 8 Mtr Long
11Loading of ST Poles 13 Mtr Long
12Loading of ST Poles 11Mtr Long
13Loading of ST Poles 9 Mtr Long
14Loading of ST Poles 8 Mtr Long
15Shifting/ Dragging of existing/ New PCC (8/9/11 mtrs.) at a average distance upto 25 Mtr for stacking to easily accesible place for loading/Unoading Purpose and its stacking
16Shifting/ Dragging of existing / New ST Poles 8/9/11 mtrs.) at a average distance upto 25 Mtr for stacking to easily accesible place for loading/Unoading Purpose and its stacking
17Unloading of 25 KVA Transformer(New/ Old/ Damaged Transformer)
18Unloading of 50/63 KVA Transformer(New/ Old/ Damaged Transformer)
19Unloading of 100 KVA Transformer(New/ Old/ Damaged Transformer)
20Unloading of 200/250 KVA Transformer(New/ Old/ Damaged Transformer)
21Unloading of 300/400/500 KVA Transformer(New/ Old / Damaged Transformer)
22Unloading of 630 KVA Transformer(New/ Old/ Damaged Transformer)
23Loading of 25 KVA Transformer
24Loading of 50/63 KVA Transformer
25Loading of 100 KVA Transformer
26Loading of 200/ 250 KVA Transformer
27Loading of 300/400/500 KVA Transformer
28Loading of 630 KVA Transformer
29Dragging of existing / New / Damaged 25 KVA Tranformer at an average distance upto 25 Mtr. and its stacking properly
30Dragging of existing / New 50/ 63 KVA Tranformer at an average distance upto 25 Mtr. and its stacking properly
31Dragging of existing / New / Damaged 100 KVA Tranformer at an average distance upto 25 Mtr. and its stacking properly
32Dragging of existing /New /Damaged 200/ 250 KVA Tranformer at an average distance upto 25 Mtr. and its stacking properly
33Dragging of existing /New/Damaged 300/ 400/500 KVA Tranformer at an average distance upto 25 Mtr. and its stacking properly
34Dragging of existing / New/ Damaged 630 KVA Tranformer at an average distance upto 25 Mtr. and its stacking properly
35Unloading of Old/ New ACSR Conductor
36Loading of Old/ New ACSR Conductor
37Shifting of Old/ New ACSR Conductor from unloading site to stacking site at an average distance upto 25 Mtr. and its stacking
38Unloading of DPC CU/ AL Wire
39Loading of DPC CU/ AL Wire
40Unloading or Loading of SE/DPC AL Wire of all sizes
41Unloading or Loading of SE/DPC Cu Wire of all sizes
42Unloading or Loading of LV Bush Rod M-12
43Unloading or Loading of LV Bush Rod M-20
44Unloading or Loading of LV Bush Rod M-30
45Unloading or Loading of HV Bush 11KV
46Unloading or Loading of HV Bush Rod
47Unloading or Loading of LV Bush M-12
48Unloading or Loading of LV Bush M-20
49Unloading or Loading of LV Bush M-25/30
50Unloading or Loading of Lethoride Paper
51Unloading or Loading of Khaki Paper
52Unloading or Loading of Gutties
53Unloading or Loading of Washer of sizes
54Unloading or Loading of Cork Sheet of sizes
55Unloading or Loading of Cork Srip of sizes
56Unloading or Loading of Cotton tape/Bovin Tape of sizes
57Unloading or Loading of Craft Paper
58Unloading or Loading of Packing sheet/pressboard
59Unloading or Loading of Wooden wedges
60Unloading or Loading of Bakelite tubes 1 mtr
61Unloading or Loading of Welding rod
62Unloading or Loading of Transformer Oil
63Unloading or Loading of Breather
64Unloading or Loading of Bamboo Ladder/Aluminium Telescopic ladder
65Shifting of allied material for HT/LT/Substation(i.e Disc/Pin/Shackle/Busbar Insulator/AI Busbar/GI/Guy wire/ Thimbles/Earthing RodETC) from unloading site to stacking site and stacking properly
66Shifting of allied material for HT/LT/Substation(i.e Disc/Pin/Shackle/Busbar Insulator/AI Busbar/GI/Guy wire/ Thimbles/Earthing Rod etc) for making space for other store material
67Stacking of Single/ Three phase meters
68UnLoading of Channel/ Angle/ Flat Iron
69Loading of Channel/Angle/Flat Iron
70Carriage/ Shifting of Channel/ Angle/ Flat Iron at an average distance upto 25 Mtr. from unloading site to stacking site and its stacking properly
71Unloading of PVC Cable single core 95/ 120/ 185 mm sq
72Loading of PVC Cable single core 95/ 120/ 185 mm sq
73Carriage/shifting of PVC Cable single core 95/ 120/ 185 mm sq at an average distance upto 25 Mtr.
74UnLoading of PVC Cable single core 300/ 400 mm sq
75Loading of PVC Cable single core 300/ 400 mm sq
76Carriage of PVC Cable single core 300/ 400 mm sq at an average distance upto 25 Mtr.
77UnLoading of PVC Cable single core 630 mm sq
78Loading of PVC Cable single core 630 mm sq
79Carriage of PVC Cable single core 630 mm sq at an average distance upto 25 Mtr.
80Unloading of AB/XLPE 25/ 35/ 50/ 70/ 95 mm sq single core Cable for HT/ LT Lines
81Loading of AB/XLPE 25/35/50/70/95 mm sq single core Cable for HT/ LT Lines
82Carriage of AB/XLPE 25 /35/ 50/ 70/ 95 mm sq single core Cable for HT/ LT Lines at an average distance upto 25 Mtr.
83Unloading of AB/XLPE 120/ 150/ 185/ 240 mmsq single core Cable for HT/ LT Lines
84Loading of AB/ XLPE 120/ 150/ 185/ 240 mm sq single core Cable for HT/LT Lines
85Carriage of AB/ XLPE 120/ 150/ 185/ 240 mm sq single core Cable for HT/ LTLines at an average distance upto 25 Mtr.
86Unloading of AB/XLPE 25/ 35/ 50 mm sq three core Cable for HT/ LT Lines
87Loading of AB/XLPE 25/ 35/ 50 mm sq three core Cable for HT/ LT Lines
88Carriage of AB/XLPE 25/ 35/ 50 mm sq three core Cable for HT/LT Lines at an average distance upto 25 Mtr.
89Unloading of AB/XLPE 70/ 95 mm sq three core Cable for HT/LT Lines
90Loading of AB/XLPE 70/ 95mmsq three core Cable for HT/LT Lines
91Carriage of AB/XLPE 70/ 95 mm sq three core Cable for HT Lines upto 25 mtrs.
92Unloading of AB/XLPE 120/ 150 mm sq three core Cable for HT Lines
93Loading of AB/XLPE 120/ 150 mm sq three core Cable for HT /LTLines
94Carriage of AB/XLPE 120/ 150 mm sq three core Cable for HT/LT Lines at an average distance upto 25 Mtr.
95UnLoading of AB/ XLPE 185/ 240 mm sq three core Cable for HT/ LT Lines
96Loading of AB/XLPE 185/ 240 mm sq three core Cable for HT Lines
97Carriage of AB/XLPE 185/240 mm sq three core Cable for HT Lines at an average distance upto 25 Mtr.
98UnLoading of AB/ XLPE 300/ 400 mm sq three core Cable for HT Lines
99Loading of AB/XLPE 300/ 400 mm sq three core Cable for HT/ LT Lines
100Carriage of AB/XLPE 300/ 400 mm sq three core Cable for HT/ LT Lines at an average distance upto 25 Mtr.
101Fabrication of Channel Cross Arms of sorts/angle arms of sorts
102Fabrication of clamps from MS flat (suitable for 8 mtr/9mtr, 11 mtr and 13 mtr poles)
103Fabrication of Earthing Plates from MS plate
104Fabrication of earthing spikes from MS tar steel of sorts as per REC Standards
105Fabrication of foundation bolts from MS tor steel including threading as per REC Standards
106Fabrication of Earthing pipe from GI pipe and welding of earthing plate as per REC Standards
107Unloading/Loading of Straight jointing kit/Heat shrinkable Kit for AB/ XLPE cables of HT/ LT Lines
108Unreeling, laying of ACSR Weasel/ Squirrel/ Rabbit Conductor
109Cutting of ACSR Weasel/ Squirrel/ Rabbit conductor, making bundles of conductor and stacking within 25 mtrs.
110Unreeling, laying of PVC Cables
111Cutting and making bundles of PVC Cables and stacking
112Unreeling, laying of XLPE Cables/ABC Cables
113Cutting and making bundles of XLPE Cables and stacking
114Unreeling, laying of PVC/ XLPE/ AB Cables
115Cutting and making bundles of PVC/ XLPE/ AB Cables and stacking
116Unloading of Link/ Knife/ HG/ DO/ LA Set
117Loading of HG/ DO/ LA/ GO Set
118Carriage/ Stacking of HG/ DO/ LA/ GO Set at an average distance upto 25 Mtr.
119Unloading of CT/ PT Unit
120Loading of CT/ PT Unit
121Carriage/ Stacking of CT/ PT Unit at an average distance upto 50 Mtr
122Checking/Counting/Meggering of Line/Hardware Materials viz Disc insulators ,fittings, Pin insulators with pins etc
123Checking/Measuring/ Weighing of Line/Workorkkshop Material viz Nuts and bolts, Guy wire, GI Wire, Al. Strips, DPC Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol etc.and stacking
124Cutting of Vegetation, Bushes , Wild Grass, trees to avoid any mishappening of untoward incidents
125Carriage of Green Vegetation Bushes , Wild Grass, trees after cutting and dumping away from store
126Straightening of tilted fencing posts in the store premises for repair of fecning
127Insertion of new fencing Posts in the store for repair of fencing
128Dismantling of existing mesh fencing
129Fixing of mesh Fencing
130Fixing of CGI Sheets
131Dismantling of CGI sheets
132Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 25/63/100 KVA
133Meggering, tightening of nuts and bolts, oil seals, breathers checkings, visual inspections of Transfomers 250/400/630KVA
134Lifting of Unserviceable items like, Damaged Transformers(Outer frame of DTs), Broken Insulators of sorts, ,Al/ Cu/ Scrap/ Bushrods of sorts, Empty barells, Broken CGI Sheerts, Iron scraps, damaged energy meters, CT/PTs sets from existing place to another suitable place and its stacking
135Unloading of old loose conductor and making bundles
136UnLoading of 11KV Disc Insulators / Pin Insulators
137Loading of 11kv Disc Insulators/ Pin Insulators
138Carriage/ Stacking of 11kv Disc Insulators/ Pin Insulators
139UnLoading of Shackle/ Busbar Insulators
140Loading of Shackle/ Busbar Insulators
141Carriage/ Stacking of Shackle/ Busbar Insulators
142UnLoading of Al Busbar/ Al Strip
143Loading of Al Busbar/ Al Strip
144Carriage/Stacking of Al Busbar/ Al Strip
145UnLoading of GI wire / Guy wire
146Loading of GI wire / Guy wire
147Carriage/ Stacking of GI wire / Guy wire
148Carriage/Stacking of HV/ LV Bush Insulators
149Carriage/Stacking of HV/LV Bushrods
150Unloading of Earthing rods etc
151Loading of Earthing rods etc
152Un loading of LT Switch 100A/ 200A
153Drainage of transformer oil from damaged transformer
154Filling of transformer oil old in barrel
155Loading of LT Switch 100A/ 200A
156Unloading/Loading Of Flood light
157Unloading/Loading of changeover switch
158Unloading/Loading of Trivector Meter
159Carriage/Stacking of LT Switch 100A/200A
160Carriage/ Stacking of Earthing rods etc
161Fabrication of Guy Rod ,TB,AP
162Fabrication of V-cross
163Making of Holes for fabrication of Channel/Flat/Angles
164Testing of Transformers (25/63/200/250/400/630 KVA) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56603213
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 12-08-2026
Authority
Authority Name Power Development Department
Work Description Tender for Fixing Of Rate Contract For Handling And Fabrication Of Material At Divisional Store Udh Ur Of Electric Division, Jpdcl Udh Ur For Fy 2026-27 Or Till The Next Year Tender Is Finalized. , Unloading Of Plain Cement Concrete Poles 11 Mtr Long , Unloading Of Plain Cement Concrete Poles 9 Mtr Long , Unloading Of Plain Cement Concrete Poles 8 Mtr Long , Unloading Of St Poles 13 Mtr Long , Unloading Of St Poles 11Mtr Long , Unloading Of St Poles 9 Mtr Long , Unloading Of St Poles 8 Mtr Long , Loading Of Plain Cement Concrete Poles 11 Mtr Long , Loading Of Plain Cement Concrete Poles 9 Mtr Long , Loading Of Plain Cement Concrete Poles 8 Mtr Long , Loading Of St Poles 13 Mtr Long , Loading Of St Poles 11Mtr Long , Loading Of St Poles 9 Mtr Long , Loading Of St Poles 8 Mtr Long , Shifting/ Dragging Of Existing/ New Plain Cement Concrete (8/9/11 Mtrs.) At A Average Distance Upto 25 Mtr For Stacking To Easily Accesible Place For Loading/Unoading Purpose And Its Stacking , Shifting/ Dragging Of Existing / New St Poles 8/9/11 Mtrs.) At A Average Distance Upto 25 Mtr For Stacking To Easily Accesible Place For Loading/Unoading Purpose And Its Stacking , Unloading Of 25 Kva Transformer(New/ Old/ Damaged Transformer) , Unloading Of 50/63 Kva Transformer(New/ Old/ Damaged Transformer) , Unloading Of 100 Kva Transformer(New/ Old/ Damaged Transformer) , Unloading Of 200/250 Kva Transformer(New/ Old/ Damaged Transformer) , Unloading Of 300/400/500 Kva Transformer(New/ Old / Damaged Transformer) , Unloading Of 630 Kva Transformer(New/ Old/ Damaged Transformer) , Loading Of 25 Kva Transformer , Loading Of 50/63 Kva Transformer , Loading Of 100 Kva Transformer , Loading Of 200/ 250 Kva Transformer , Loading Of 300/400/500 Kva Transformer , Loading Of 630 Kva Transformer , Dragging Of Existing / New / Damaged 25 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing / New 50/ 63 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing / New / Damaged 100 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing /New /Damaged 200/ 250 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing /New/Damaged 300/ 400/500 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Dragging Of Existing / New/ Damaged 630 Kva Tranformer At An Average Distance Upto 25 Mtr. And Its Stacking Properly , Unloading Of Old/ New Acsr Conductor , Loading Of Old/ New Acsr Conductor , Shifting Of Old/ New Acsr Conductor From Unloading Site To Stacking Site At An Average Distance Upto 25 Mtr. And Its Stacking , Unloading Of Dpc Cu/ Al Wire , Loading Of Dpc Cu/ Al Wire , Unloading Or Loading Of Se/Dpc Al Wire Of All Sizes , Unloading Or Loading Of Se/Dpc Cu Wire Of All Sizes , Unloading Or Loading Of Lv Bush Rod M-12 , Unloading Or Loading Of Lv Bush Rod M-20 , Unloading Or Loading Of Lv Bush Rod M-30 , Unloading Or Loading Of Hv Bush 11Kv , Unloading Or Loading Of Hv Bush Rod , Unloading Or Loading Of Lv Bush M-12 , Unloading Or Loading Of Lv Bush M-20 , Unloading Or Loading Of Lv Bush M-25/30 , Unloading Or Loading Of Lethoride Paper , Unloading Or Loading Of Khaki Paper , Unloading Or Loading Of Gutties , Unloading Or Loading Of Washer Of Sizes , Unloading Or Loading Of Cork Sheet Of Sizes , Unloading Or Loading Of Cork Srip Of Sizes , Unloading Or Loading Of Cotton Tape/Bovin Tape Of Sizes , Unloading Or Loading Of Craft Paper , Unloading Or Loading Of Packing Sheet/Pressboard , Unloading Or Loading Of Wooden Wedges , Unloading Or Loading Of Bakelite Tubes 1 Mtr , Unloading Or Loading Of Welding Rod , Unloading Or Loading Of Transformer Oil , Unloading Or Loading Of Breather , Unloading Or Loading Of Bamboo Ladder/Aluminium Telescopic Ladder , Shifting Of Allied Material For Ht/Lt/Substation(I.E Disc/Pin/Shackle/Busbar Insulator/Ai Busbar/Gi/Guy Wire/ Thimbles/Earthing Rodetc) From Unloading Site To Stacking Site And Stacking Properly , Shifting Of Allied Material For Ht/Lt/Substation(I.E Disc/Pin/Shackle/Busbar Insulator/Ai Busbar/Gi/Guy Wire/ Thimbles/Earthing Rod Etc) For Making Space For Other Store Material , Stacking Of Single/ Three Phase Meters , Unloading Of Channel/ Angle/ Flat Iron , Loading Of Channel/Angle/Flat Iron , Carriage/ Shifting Of Channel/ Angle/ Flat Iron At An Average Distance Upto 25 Mtr. From Unloading Site To Stacking Site And Its Stacking Properly , Unloading Of Pvc Cable Single Core 95/ 120/ 185 Mm Sq , Loading Of Pvc Cable Single Core 95/ 120/ 185 Mm Sq , Carriage/Shifting Of Pvc Cable Single Core 95/ 120/ 185 Mm Sq At An Average Distance Upto 25 Mtr. , Unloading Of Pvc Cable Single Core 300/ 400 Mm Sq , Loading Of Pvc Cable Single Core 300/ 400 Mm Sq , Carriage Of Pvc Cable Single Core 300/ 400 Mm Sq At An Average Distance Upto 25 Mtr. , Unloading Of Pvc Cable Single Core 630 Mm Sq , Loading Of Pvc Cable Single Core 630 Mm Sq , Carriage Of Pvc Cable Single Core 630 Mm Sq At An Average Distance Upto 25 Mtr. , Unloading Of Ab/Xlpe 25/ 35/ 50/ 70/ 95 Mm Sq Single Core Cable For Ht/ Lt Lines , Loading Of Ab/Xlpe 25/35/50/70/95 Mm Sq Single Core Cable For Ht/ Lt Lines , Carriage Of Ab/Xlpe 25 /35/ 50/ 70/ 95 Mm Sq Single Core Cable For Ht/ Lt Lines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/Xlpe 120/ 150/ 185/ 240 Mmsq Single Core Cable For Ht/ Lt Lines , Loading Of Ab/ Xlpe 120/ 150/ 185/ 240 Mm Sq Single Core Cable For Ht/Lt Lines , Carriage Of Ab/ Xlpe 120/ 150/ 185/ 240 Mm Sq Single Core Cable For Ht/ Ltlines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/Xlpe 25/ 35/ 50 Mm Sq Three Core Cable For Ht/ Lt Lines , Loading Of Ab/Xlpe 25/ 35/ 50 Mm Sq Three Core Cable For Ht/ Lt Lines , Carriage Of Ab/Xlpe 25/ 35/ 50 Mm Sq Three Core Cable For Ht/Lt Lines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/Xlpe 70/ 95 Mm Sq Three Core Cable For Ht/Lt Lines , Loading Of Ab/Xlpe 70/ 95Mmsq Three Core Cable For Ht/Lt Lines , Carriage Of Ab/Xlpe 70/ 95 Mm Sq Three Core Cable For Ht Lines Upto 25 Mtrs. , Unloading Of Ab/Xlpe 120/ 150 Mm Sq Three Core Cable For Ht Lines , Loading Of Ab/Xlpe 120/ 150 Mm Sq Three Core Cable For Ht /Ltlines , Carriage Of Ab/Xlpe 120/ 150 Mm Sq Three Core Cable For Ht/Lt Lines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/ Xlpe 185/ 240 Mm Sq Three Core Cable For Ht/ Lt Lines , Loading Of Ab/Xlpe 185/ 240 Mm Sq Three Core Cable For Ht Lines , Carriage Of Ab/Xlpe 185/240 Mm Sq Three Core Cable For Ht Lines At An Average Distance Upto 25 Mtr. , Unloading Of Ab/ Xlpe 300/ 400 Mm Sq Three Core Cable For Ht Lines , Loading Of Ab/Xlpe 300/ 400 Mm Sq Three Core Cable For Ht/ Lt Lines , Carriage Of Ab/Xlpe 300/ 400 Mm Sq Three Core Cable For Ht/ Lt Lines At An Average Distance Upto 25 Mtr. , Fabrication Of Channel Cross Arms Of Sorts/Angle Arms Of Sorts , Fabrication Of Clamps From Ms Flat (Suitable For 8 Mtr/9Mtr, 11 Mtr And 13 Mtr Poles) , Fabrication Of Earthing Plates From Ms Plate , Fabrication Of Earthing Spikes From Ms Tar Steel Of Sorts As Per Rec Standards , Fabrication Of Foundation Bolts From Ms Tor Steel Including Threading As Per Rec Standards , Fabrication Of Earthing Pipe From Gi Pipe And Welding Of Earthing Plate As Per Rec Standards , Unloading/Loading Of Straight Jointing Kit/Heat Shrinkable Kit For Ab/ Xlpe Cables Of Ht/ Lt Lines , Unreeling, Laying Of Acsr Weasel/ Squirrel/ Rabbit Conductor , Cutting Of Acsr Weasel/ Squirrel/ Rabbit Conductor, Making Bundles Of Conductor And Stacking Within 25 Mtrs. , Unreeling, Laying Of Pvc Cables , Cutting And Making Bundles Of Pvc Cables And Stacking , Unreeling, Laying Of Xlpe Cables/Abc Cables , Cutting And Making Bundles Of Xlpe Cables And Stacking , Unreeling, Laying Of Pvc/ Xlpe/ Ab Cables , Cutting And Making Bundles Of Pvc/ Xlpe/ Ab Cables And Stacking , Unloading Of Link/ Knife/ Hg/ Do/ La Set , Loading Of Hg/ Do/ La/ Go Set , Carriage/ Stacking Of Hg/ Do/ La/ Go Set At An Average Distance Upto 25 Mtr. , Unloading Of Ct/ Pt Unit , Loading Of Ct/ Pt Unit , Carriage/ Stacking Of Ct/ Pt Unit At An Average Distance Upto 50 Mtr , Checking/Counting/Meggering Of Line/Hardware Materials Viz Disc Insulators ,Fittings, Pin Insulators With Pins Etc , Checking/Measuring/ Weighing Of Line/Workorkkshop Material Viz Nuts And Bolts, Guy Wire, Gi Wire, Al. Strips, Dpc Cu/Al Wire, Khakhi Paper, Lethoride Paper, Fevicol Etc.And Stacking , Cutting Of Vegetation, Bushes , Wild Grass, Trees To Avoid Any Mishappening Of Untoward Incidents , Carriage Of Green Vegetation Bushes , Wild Grass, Trees After Cutting And Dumping Away From Store , Straightening Of Tilted Fencing Posts In The Store Premises For Repair Of Fecning , Insertion Of New Fencing Posts In The Store For Repair Of Fencing , Dismantling Of Existing Mesh Fencing , Fixing Of Mesh Fencing , Fixing Of Cgi Sheets , Dismantling Of Cgi Sheets , Meggering, Tightening Of Nuts And Bolts, Oil Seals, Breathers Checkings, Visual Inspections Of Transfomers 25/63/100 Kva , Meggering, Tightening Of Nuts And Bolts, Oil Seals, Breathers Checkings, Visual Inspections Of Transfomers 250/400/630Kva , Lifting Of Unserviceable Items Like, Damaged Transformers(Outer Frame Of Dts), Broken Insulators Of Sorts, ,Al/ Cu/ Scrap/ Bushrods Of Sorts, Empty Barells, Broken Cgi Sheerts, Iron Scraps, Damaged Energy Meters, Ct/Pts Sets From Existing Place To Another Suitable Place And Its Stacking , Unloading Of Old Loose Conductor And Making Bundles , Unloading Of 11Kv Disc Insulators / Pin Insulators , Loading Of 11Kv Disc Insulators/ Pin Insulators , Carriage/ Stacking Of 11Kv Disc Insulators/ Pin Insulators , Unloading Of Shackle/ Busbar Insulators , Loading Of Shackle/ Busbar Insulators , Carriage/ Stacking Of Shackle/ Busbar Insulators , Unloading Of Al Busbar/ Al Strip , Loading Of Al Busbar/ Al Strip , Carriage/Stacking Of Al Busbar/ Al Strip , Unloading Of Gi Wire / Guy Wire , Loading Of Gi Wire / Guy Wire , Carriage/ Stacking Of Gi Wire / Guy Wire , Carriage/Stacking Of Hv/ Lv Bush Insulators , Carriage/Stacking Of Hv/Lv Bushrods , Unloading Of Earthing Rods Etc , Loading Of Earthing Rods Etc , Un Loading Of Lt Switch 100A/ 200A , Drainage Of Transformer Oil From Damaged Transformer , Filling Of Transformer Oil Old In Barrel , Loading Of Lt Switch 100A/ 200A , Unloading/Loading Of Flood Light , Unloading/Loading Of Changeover Switch , Unloading/Loading Of Trivector Meter , Carriage/Stacking Of Lt Switch 100A/200A , Carriage/ Stacking Of Earthing Rods Etc , Fabrication Of Guy Rod ,Tb,Ap , Fabrication Of V-Cross , Making Of Holes For Fabrication Of Channel/Flat/Angles , Testing Of Transformers (25/63/200/250/400/630 Kva)
Basic Detail
Tender No ED/UDH/22 OF 2026-27 dated 22-07-2026
Bidding Type Tender
Location
City Udhampur
State Jammu and Kashmir
Key Dates
Publish Date 22 Jul 2026
Submission Date 12 Aug 2026
Open Date 13 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee 2000
EMD 1 Lakhs
Exemption Not Available
Document List
8b2b304c-91f6-4787-b0f0-dd5366b1fb5d.html
BOQ_1038865.xls
Tendernotice_1.pdf
Tendernotice_2 (6).pdf
Tendernotice_3 (1).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 22, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 12, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 20 days
Aug 13, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 21 days

Tender Documents

Download All (ZIP) ↓
html

8b2b304c-91f6-4787-b0f0-dd5366b1fb5d.html

xls

BOQ_1038865.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2 (6).pdf

pdf

Tendernotice_3 (1).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders