Tender For Comprehensive Annual Maintenance Contract (Camc) And Operation Of 4 Nos. X 550=2200 Tr Central Air Conditioning Plant Installed At Lok Bhawan Sachivalaya
Tender Overview
Project Description
Tender for Comprehensive Annual Maintenance Contract (Camc) And Operation Of 4 Nos. X 550=2200 Tr Central Air Conditioning Plant Installed At Lok Bhawan Sachivalaya
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 29-Jul-2026 | Revised Date 1597 | Date | 05-Aug-2026 |
| 2 | 04-Aug-2026 | Revised Term and Conditions 1597 | Technical Bid | 17-Aug-2026 |
| 3 | 14-Aug-2026 | Revised Date 1597-2032 | Date | 25-Aug-2026 |
| 4 | 04-Aug-2026 | Revised Term and Conditions 1597 | Technical Bid | 25-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Comprehensive Annual Maintenance contract & Operation of Centrifugal water Cooled 4 Nos x 550 TR Dunham -Bush make chiller, 59 Nos AHU,4 nos Condenser Pump-75HP, 4 Nos primery pump-30HP,3 Nos secondry pump-30 HP,3 Nos secondry pump -25 HP, 3 Nos Hot water pump-10 HP,4 Nos Cooling tower capacity 650 TR,8 Nos motor/fan 11 HP, 3 Nos Heating element -360 kw,starter panel 1 Nos CSU, 4 nos FCU,butterfly valve,motorized valve,fire damper & control system(BMS), and all other associated low and high side equipments at Lok Bhawan,Lucknow. |
| 2 | Under Comprehensive Annual Maintenance Contract (CAMC) & Operation of above work terms and conditions are as follows:-(i) Contractor will repair, replace each and every item, spare or components in the above system if found defective or malfunctioning.(ii) Contractor will replace Minimun 25% PVC fills of cooling tower.( atleast 1 no. cooling tower PVC fills to be changed completely )(iii) Contractor will upgrade the BMS system including its software and hardware components at its own cost.(iv)Contractor will be Responsible for providing free of charge Spare Parts/Components.(v) Contractor will regularly check these system and will keep these ready for immediate usages.(vi)Services will be provided round the clock during any time of day and night .(vii) In the event of any major breakdown if required manufacture's engineers will be called for help and Contractor will bear their cost. |
| 3 | Add: GST @ 18% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender