Tender For Work Of Construction Of 16.0 Km. 33 Kv Line (15.0 Km. O/H & 1.0 Km. U/G) From 33/11 Kv Sub-Station Khetikhan To 33/11 Kv Sub-Station Village- Bhageena-Bhandari (Proposed) (Ch Awat) Under The Head Of Capital (I.R.) Under Eswd, Kathgodam Hal
Tender Overview
Project Description
Tender for Work Of Construction Of 16.0 Km. 33 Kv Line (15.0 Km. O/H & 1.0 Km. U/G) From 33/11 Kv Sub-Station Khetikhan To 33/11 Kv Sub-Station Village- Bhageena-Bhandari (Proposed) (Ch Awat) Under The Head Of Capital (I.R.) Under Eswd, Kathgodam Haldwani. (Rates Should Be Quoted Without Gst) (Gst Will Paid Extra)
BOQ
| Sl. No. | Item Description |
| 1 | Annexure-A (LABOUR CHARGES) |
| 2 | Erection of SP-55 single support pole in proper level and alignment along with fixing of all accessories like top channel, & clamps as per RESPO manual |
| 3 | ERECTION OF TRI POLE FOR ST POLE SP-33 |
| 4 | EXCAVATION IN SOIL IN HILLY AREA/RIVER BED BY MECHANICAL MEANS I.E. BACKHOE LOADER |
| 5 | PROVIDING AND LAYING IN POSITION CEMENT CONCRETE OF SPECIFIED GRADE EXCLUDING THE COST OF CENTERING AND SHUTTERING - ALL WORKS UPTO PLINTH LEVEL (I) 1:4:8 (1 - CEMENT; 4 - COARSE SAND; 8 - GRADED STONE AGGREGATE 40MM NOMINAL SIZE) FOUNDATION |
| 6 | CONSTRUCTION OF RETURNING WALL AND PLINTH |
| 7 | Erection of SP-33 single support pole in proper level and alignment alongwith fixing of all accessories like topchannel,& clamps a s per RESPOmanual |
| 8 | Grouting of pole in size 0.45x4.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20 mm nominal size : 8 coarse sand) block including cost of cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment along with fixing of all accessories like top channel & clamps as per RESPO manual |
| 9 | Muffing of poles size 0.45x0.60 cm radius with 1:3:6 (1 cement : 3 coarse sand : graded stone 10 mm nominal size) block size 45 cm height from ground level including cost of cement, stone and sand etc. |
| 10 | EXCAVATION IN SOIL IN HILLY AREA/RIVER BED BY MECHANICAL MEANS I.E. BACKHOE LOADER |
| 11 | HEADLOAD CARTAGE SP-33 POLE 4 KM |
| 12 | BACK HEAD LOAD CARTAGE OF SMALL LINE MATERIAL ABOVE 3 KM |
| 13 | Making proper path way by cutting, cleaning Spinney, Clump, Jhurmut ETC in Forest Area |
| 14 | Erection of SP-33 (11KV/33 KV) four pole support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings, & clamps as per RESPO manual |
| 15 | MAKING OF 33KV XLPE CABLE LOOP AFTER DIGGING AND BACK FILLING OF EARTH SOIL AT BOTH END OF DP SECTION |
| 16 | Earthing of support with M.S. Earth rod of 2.5 meter long by hammering of M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. wire as per construction manual. |
| 17 | Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 3 wire) of ACSR Dog as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile |
| 18 | PAINTING OF FOUR POLE (SP-55) |
| 19 | Erection of SP-55 (11KV/33 KV) four pole support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings, & clamps as per RESPO manual |
| 20 | PAINTING OF FOUR POLE (SP-33) |
| 21 | FIXING OF ACCESSORIES |
| 22 | Cartage of ST pole SP-33 Poles from store centre to construction site with loading, unloading at both points and proper stacking. (Distance 151-200 Km) |
| 23 | HIPOT CABLE TESTING BEFORE ENERGIZING |
| 24 | Fixing of GI pipe. |
| 25 | PAINTING OF SINGLE POLE (SP-55) |
| 26 | Erection of Sp-55 double support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings, & clamps as per RESPO manual |
| 27 | PAINTING OF TRI POLE (SP-33) |
| 28 | Fabrication of MS Channel angle iron etc in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO schedule and local approved drawing. |
| 29 | PAINTING OF SINGLE POLE (SP-33) |
| 30 | PAINTING OF DOUBLE POLE (SP-55) |
| 31 | Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends (distance 151-200 Km) |
| 32 | SHIFTING REALIGNMENT OF 11 KV SP, DP/LT LINE INCLUDING COMPLETE WORK |
| 33 | ERECTION AND LAYING OF HT 33 KV XLPE ALU. ARMOURED CABLE 3 X 400 SQ. MM. IN HDPE PIPE MIXED SOIL INCLUDING BACK FILLING OF EARTH & ERECTION ON POLE USING MS CHANNEL, ANGLE & CLAMPS ETC. |
| 34 | Guarding of 33 KV Line over (Telephone / Road / L.T. line crossing as per drawing with 6/8 SWG G.I. wire including fixing of guarding channel/ angle as per RESPO manual. |
| 35 | Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand) block including cost of Cement, sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, levelling |
| 36 | Excavation of earth for stay pit of size 0.6x0.6x1.2 mtr in all types of soil including proper dressing of sides and ramming of bottom including getting out out the excavated soil and disposal ofsurplus excavated soil as directedcomplete work |
| 37 | Fixing, tightening and nozzling of stay with pole and stay rod on required tension as per drawing/manual in 33 KV line |
| 38 | EARTH WORK IN EXCAVATION BY MECHANICAL MEANS / MANUAL MEANS OVER AREAS CC/HARDROCK |
| 39 | Cartage of ST pole SP-55 Poles from store centre to construction site with loading, unloading at both points and proper stacking. (Distance 151-200 Km) |
| 40 | HEADLOAD CARTAGE SP-55 POLE 4 KM |
| 41 | Jointing and fixing of cable jointing kit indoor/outdoor 33 KV XLPE heat shrinkable cable boxes |
| 42 | Erection of SP-33 double support pole in proper level and alignment along with fixing of all accessories like top channel, X bracings, & clamps as per RESPO manual |
| 43 | SUPPLY AND LAYING OF HDPE PIPE 160 MM OUTER DIA 6 MM THICKNESS |
| 44 | ERECTION OF CONCRETE ROUTE MARKER FOR HT CABLE |
| 45 | PAINTING OF DOUBLE POLE (SP-33) |
| 46 | Annexure-B (SUPPLY ITEMS) (As per UPCL Norms) |
| 47 | STAY INSULATOR |
| 48 | MS NUT & BOLT OFF SIZE |
| 49 | X ARM HOLDING CLAMP |
| 50 | BOLT & NUT 150X12 MM |
| 51 | BOLT & NUTS 50X16 MM |
| 52 | BRACING CLAMP FOR ST SP33 TOP WITH N&B |
| 53 | 33KV XLPE HS J/K 3X400MM² STRAIGHT |
| 54 | TOP CHENNEL CLAMP WITH N&B |
| 55 | CONCRETE ROUTE MARKER FOR HT CABLE |
| 56 | BOTTOM BRACING CLAMP FOR SP33-N&B |
| 57 | DANGER BOARD WITH CLAMP N&B |
| 58 | PG CLAMP FOR DOG CONDUCTOR |
| 59 | EARTH WIRE CLAMP WITH N&B |
| 60 | STONE PAD 300X300X75MM |
| 61 | STAY CLAMP WITH N&B |
| 62 | BRACING CLAMP TOP WITH N&B SP-55 |
| 63 | EYE BOLT |
| 64 | HOLDING CLAMP FOR SP-55 WITH N/B |
| 65 | E-CLAMP FOR 33KV 75X10MM WITH N&B |
| 66 | BRACING CLAMP BOTTOM SP-55 WITH N/B |
| 67 | BARBED WIRE |
| 68 | NUMBER PLATE WITH CLAMP |
| 69 | G.I. PIPE 6 INCH Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender