Public Administrative Department Local Bodies Closing in 10 days TDR #56594535

Tender For Renovation Of Crematorium At Dhangarpada, Keonjhargarh Municipality

Issued by Local Bodies · Kendujhar, Odisha
Tender Value
3.13 Crore
Estimated cost
Bid Submission
12 Aug 2026
10 days left
EMD
3.13 Lakhs
Bank guarantee accepted
Document Fee
11800
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kendujhar → Odisha
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Renovation Of Crematorium At Dhangarpada, Keonjhargarh Municipality

BOQ

Name of Work:- Renovation of Crematorium at Dhangarpada, Keonjhargarh Municipality
Sl. No. Item Description
1COTTAGE FOR RITUAL WORK- Earth work in excavation of foundation trenches in all kids of soil including dressing and leavelling the bed upto the required depth and depositing the excaveted materials with all leads & lifts T&P Shoring and shuttering watering if necessary etc. complete as per directed by the Engineer-in-charge.
2Supplying and filling foundation and plinth with sand watered and rammed including cost, conveyance, royalties and taxes of all materials and cost of all labour, T&P required for the work etc. complete (measurement will be taken on finished compacted section only) as directed by the Engineer-in Charge.
3Cement concrete (1:3:6) using approved quality from approved quarry including lowering laying concrete watering and curing etc. as required levels laid in layers not exceeding(0'-6'') 15 cm thick including cost, conveyance,royalities and taxes of all materials and cost of all labour ,T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge .
4R.C.C. work M-20 in grade having a minimum compressive strength (in work test) 150 kg/cm2 in 15cm cubes at 28 days using 12mm. & down grade hard granite C.B. chips of approved quality and from approved quarry including watering, lowering laying concrete, compacting with vibrators, curing for 28 days with smooth etc. complete. (A) Column base
5(B) Plinth Beam
6(C) R.C.C. Columns
7(E) Roof Beam
8(G) R.C.C. Roof Slab
9Rigid smooth centering & shuttering for R.C.C. works including false works and dismantlling them after casting including cost of materials complete.(A) R.C.C. Roof Slab
10(B) R.C.C. Roof Beam
11(C) R.C.C. Column
12(D) R.C.C. Plinth Beam
13(E) R.C.C. Raft
14Supplying Cutting,bending un- coated HYSD bars,for reinforcement tying the grills and placing in position as required for the RCC works and for providing fan hooks hoisting and lowering,laying including cost,conveyance & taxes of SYSD bars and binding wires of 18 to 20 gauge required for the work and bending binding and tying the grills .
15Fly ash bricks masonary incm (1:6) after immersing the bricks 6 hrs. in water before use in Foundation and plinth having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete.
16Fly ash bricks masonary in cm (1:6) in Superstructure after immersing the bricks 6 hrs. In water before use in all floors having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete.
1712 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.
1816 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.In Side Wall Surface
196mm thick cement plaster in C.M. [1:4] finished smooth to exposed R.C.C. work with cost of all materials labor etc. complete. In Side Ceilling Surface
20Fixing of granite tiles in floors of Size 600x600mm of approved make coformaing to I.S:13755 laid on on 25mm thick bed of Cement mortar 1:1 ( 1 Cement : 1 sand ) and filling joint with white Cement of approved quality in slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tiles or stones. ( For new work)with cost of all materials labor etc. complete.
21Fixing of Granite tiles in dados, skirting riser of stepps 20cmx30cm / 20cmx20cm special plane / printed series of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753 on12 mm thick bed of Cement mortar 1:3 ( 1 Cement :3 sand ) jointed with neat Cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete excluding cost of tiles .
22Providing 2.5cm thick Grading Concrete in C.C (1:2:2) with 4.7 mm size CBHG Chips on new roof slab including cost of materials , labour, T&P all comp.
23TOTAL AMOUNT FOR 2 UNIT
24FUNERAL SPACE- Earth work in excavation of foundation trenches in all kids of soil including dressing and leavelling the bed upto the required depth and depositing the excaveted materials with all leads & lifts T&P Shoring and shuttering watering if necessary etc. complete as per directed by the Engineer-in-charge.
25Supplying and filling foundation and plinth with sand watered and rammed including cost, conveyance, royalties and taxes of all materials and cost of all labour, T&P required for the work etc. complete (measurement will be taken on finished compacted section only) as directed by the Engineer-in Charge.
26Cement concrete (1:3:6) using approved quality from approved quarry including lowering laying concrete watering and curing etc. as required levels laid in layers not exceeding(0'-6'') 15 cm thick including cost, conveyance,royalities and taxes of all materials and cost of all labour ,T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge .
27R.C.C. work M-20 in grade having a minimum compressive strength (in work test) 150 kg/cm2 in 15cm cubes at 28 days using 12mm. & down grade hard granite C.B. chips of approved quality and from approved quarry including watering, lowering laying concrete, compacting with vibrators, curing for 28 days with smooth etc. complete.(A) Column base
28(B) Plinth Beam
29(C) R.C.C. Columns
30(E) Roof Beam
31(G) R.C.C. Roof Slab
32(H) R.C.C. Wall
33Rigid smooth centering & shuttering for R.C.C. works including false works and dismantlling them after casting including cost of materials complete. (A) R.C.C. Roof Slab
34(B) R.C.C. Roof Beam
35(C) R.C.C. Column
36(D) R.C.C. Plinth Beam
37(E) R.C.C. Raft
38(F) R.C.C. Wall
39Supplying Cutting,bending un- coated HYSD bars,for reinforcement tying the grills and placing in position as required for the RCC works and for providing fan hooks hoisting and lowering,laying including cost,conveyance & taxes of SYSD bars and binding wires of 18 to 20 gauge required for the work and bending binding and tying the grills .
40Fly ash bricks masonary incm (1:6) after immersing the bricks 6 hrs. in water before use in Foundation and plinth having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete.
41Fly ash bricks masonary in cm (1:6) in Superstructure after immersing the bricks 6 hrs. In water before use in all floors having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete.
4212 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.
4316 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.In Side Wall Surface
446mm thick cement plaster in C.M. [1:4] finished smooth to exposed R.C.C. work with cost of all materials labor etc. complete. In Side Ceilling Surface
45Fixing of granite tiles in floors of Size 600x600mm of approved make coformaing to I.S:13755 laid on on 25mm thick bed of Cement mortar 1:1 ( 1 Cement : 1 sand ) and filling joint with white Cement of approved quality in slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tiles or stones. ( For new work)with cost of all materials labor etc. complete.
46Fixing of Granite tiles in dados, skirting riser of stepps 20cmx30cm / 20cmx20cm special plane / printed series of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753 on12 mm thick bed of Cement mortar 1:3 ( 1 Cement :3 sand ) jointed with neat Cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete excluding cost of tiles .
47Providing 2.5cm thick Grading Concrete in C.C (1:2:2) with 4.7 mm size CBHG Chips on new roof slab including cost of materials , labour, T&P all comp.
48TOTAL AMOUNT FOR 4 UNIT
49TOILET AND BATHING COMPLEX- Earth work in excavation of foundation trenches in all kids of soil including dressing and leavelling the bed upto the required depth and depositing the excaveted materials with all leads & lifts T&P Shoring and shuttering watering if necessary etc. complete as per directed by the Engineer-in-charge.
50Supplying and filling foundation and plinth with sand watered and rammed including cost, conveyance, royalties and taxes of all materials and cost of all labour, T&P required for the work etc. complete (measurement will be taken on finished compacted section only) as directed by the Engineer-in Charge.
51Cement concrete (1:3:6) using approved quality from approved quarry including lowering laying concrete watering and curing etc. as required levels laid in layers not exceeding(0'-6'') 15 cm thick including cost, conveyance,royalities and taxes of all materials and cost of all labour ,T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge
52R.C.C. work M-20 in grade having a minimum compressive strength (in work test) 150 kg/cm2 in 15cm cubes at 28 days using 12mm. & down grade hard granite C.B. chips of approved quality and from approved quarry including watering, lowering laying concrete, compacting with vibrators, curing for 28 days with smooth etc. complete. (A) Column base
53(B) Plinth Beam
54(C) R.C.C. Columns
55(E) Roof Beam
56(E) Lintel
57(G) R.C.C. Roof Slab
58Rigid smooth centering & shuttering for R.C.C. works including false works and dismantlling them after casting including cost of materials complete.(A) R.C.C. Roof Slab
59(B) R.C.C. Roof Beam
60(C) R.C.C. Column
61(D) R.C.C. Plinth Beam
62(E) R.C.C. Raft
63Supplying Cutting,bending un- coated HYSD bars,for reinforcement tying the grills and placing in position as required for the RCC works and for providing fan hooks hoisting and lowering,laying including cost,conveyance & taxes of SYSD bars and binding wires of 18 to 20 gauge required for the work and bending binding and tying the grills .
64Fly ash bricks masonary incm (1:6) after immersing the bricks 6 hrs. in water before use in Foundation and plinth having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete.
65Fly ash bricks masonary in cm (1:6) in Superstructure after immersing the bricks 6 hrs. In water before use in all floors having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete.
66Brick work with Fly Ash bricks 25cm x 12cm x 8cm size having crusing strength not less then 75Kg/cm2 in cement mortar (1:4) in superstructure of 5\\" partition wall including all cost complete as per direction of Engineer-In-Charge.
6712 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.
6816 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.In Side Wall Surface
696mm thick cement plaster in C.M. [1:4] finished smooth to exposed R.C.C. work with cost of all materials labor etc. complete. In Side Ceilling Surface
70Finishing wall surfaces with Acrylic wall putty (Water based) of approved make and finished smooth and even surfaces to receive painting including cost of all materials taxes, labour T&P etc
71Finishing wall surface with weather coat painting 2 coat over a coat of primer to the new surfaces of walls with all cost.
72Providing and fixing of fixed ventilators of approved make to be fabricated from roll formed sections made of pre painted steel (base steel as per IS:513 of 0.60mm thick \\"D\\" quality,Galvanized as per IS:277 with zinc of 120 Gm/Sq.mtr)with paint specification being with primer of 5/7 microns & finished paint with polyster paint (Black/peral white/ chocolate Brown) of 12-16 microns along with the alkyd backer at the back of 5-7 microns & the sizes of outer frame being of 46 X52mm & with all vertical & horizontal mullions are of 46 X70mm & fixed beadings are of 18 X25 mm .Accessories /gasket are to be used as per the manufacturs supply & Specification like handle being made of hygrade aluminium powder coated & with Nylon receiver & gasket will be made of EPDM. All corner brackets are to be made of CRCA with zinc phosphating.The mullions caps & louvered-clips should be of glass filled nilon. The sections are to be cut length miter joint with corner bracket & frames are fixed to the concrete/masonry walls by means of self expanding screws and glass to be used 5mm reflective with all taxes complete.(Analysis 2006 page-251,item-15)
73Providing, Fitting & Fixing of PVC Shutter of approved make with all fitting including all Fittings with Cost of pvc frame
74Supplying fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia. Of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.90mtr C/C and stainless square pipe of size 32mmx32mmx2mm in 3 rows in staircase as per approved design and specification etc all completed.
75Providing fifting and fixing of Al. door with anodized Al. door section No.9202 as vertical member, 9201 as top member and 9200 as bottom and middle member with frame section as 9221 and 12mm thick pre-laminated board fixed on door frame by means of tapered clip No. 4660 and the frame to be completed by meand of jointing angle No. 1855 including all cost of labour, T&p, hire charges of drilling machine, labour charges etc.complete.
76Providing supplying M.S. grill made out of 12mm sq. bar and 25x6mm M.S. angle of approved desing including all cost etc. complete.
77Painting 2-coats with any approved paint over one coat of primer on new wood or iron work including cost of materials.
78Fixing of antiskid ceramic floor tiles of Size 30cmx30cm / 40cmx40cm special plane / printed series of premium grade having thickness 7mm to 8mm confirming to IS 13753 laid on on 25mm thick bed of Cement mortar 1:1 ( 1 Cement : 1 sand ) and filling joint with white Cement of approved quality in slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tiles with cost of all materials labor etc. complete.
79Fixing of Ceramic wall tiles on wall 20cmx30cm / 20cmx20cm special plane / printed series of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753 on12 mm thick bed of Cement mortar 1:3 ( 1 Cement :3 sand ) jointed with neat Cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tiles .
80Providing 2.5cm thick Grading Concrete in C.C (1:2:2) with 4.7 mm size CBHG Chips on new roof slab including cost of materials , labour, T&P all comp.
81OFFICE AND WOOD STORAGE ROOM- Earth work in excavation of foundation trenches in all kids of soil including dressing and leavelling the bed upto the required depth and depositing the excaveted materials with all leads & lifts T&P Shoring and shuttering watering if necessary etc. complete as per directed by the Engineer-in-charge.
82Supplying and filling foundation and plinth with sand watered and rammed including cost, conveyance, royalties and taxes of all materials and cost of all labour, T&P required for the work etc. complete (measurement will be taken on finished compacted section only) as directed by the Engineer-in Charge.
83Cement concrete (1:3:6) using approved quality from approved quarry including lowering laying concrete watering and curing etc. as required levels laid in layers not exceeding(0'-6'') 15 cm thick including cost, conveyance,royalities and taxes of all materials and cost of all labour ,T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge .
84R.C.C. work M-20 in grade having a minimum compressive strength (in work test) 150 kg/cm2 in 15cm cubes at 28 days using 12mm. & down grade hard granite C.B. chips of approved quality and from approved quarry including watering, lowering laying concrete, compacting with vibrators, curing for 28 days with smooth etc. complete. (A) Column base
85(B) Plinth Beam
86(C) R.C.C. Columns
87(D) Roof Beam
88(E) RCC Lintel
89(F) R.C.C. Chajja
90(G) R.C.C. Roof Slab
91Rigid smooth centering & shuttering for R.C.C. works including false works and dismantlling them after casting including cost of materials complete.(A) R.C.C. Roof Slab
92(B) R.C.C. Roof Beam
93(C) R.C.C. Column
94(E) R.C.C. Raft
95Supplying Cutting,bending un- coated HYSD bars,for reinforcement tying the grills and placing in position as required for the RCC works and for providing fan hooks hoisting and lowering,laying including cost,conveyance & taxes of SYSD bars and binding wires of 18 to 20 gauge required for the work and bending binding and tying the grills .
96Fly ash bricks masonary incm (1:6) after immersing the bricks 6 hrs. in water before use in Foundation and plinth having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete.
97Fly ash bricks masonary in cm (1:6) in Superstructure after immersing the bricks 6 hrs. In water before use in all floors having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete.
9812 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.
9916 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.In Side Wall Surface
1006mm thick cement plaster in C.M. [1:4] finished smooth to exposed R.C.C. work with cost of all materials labor etc. complete. In Side Ceilling Surface
101Finishing wall surfaces with Acrylic wall putty (Water based) of approved make and finished smooth and even surfaces to receive painting including cost of all materials taxes, labour T&P etc.
102Finishing wall surface with weather coat painting 2 coat over a coat of primer to the new surfaces of walls with all cost.
103Providing and fixing of fixed ventilators of approved make to be fabricated from roll formed sections made of pre painted steel (base steel as per IS:513 of 0.60mm thick \\"D\\" quality,Galvanized as per IS:277 with zinc of 120 Gm/Sq.mtr)with paint specification being with primer of 5/7 microns & finished paint with polyster paint (Black/peral white/ chocolate Brown) of 12-16 microns along with the alkyd backer at the back of 5-7 microns & the sizes of outer frame being of 46 X52mm & with all vertical & horizontal mullions are of 46 X70mm & fixed beadings are of 18 X25 mm .Accessories /gasket are to be used as per the manufacturs supply & Specification like handle being made of hygrade aluminium powder coated & with Nylon receiver & gasket will be made of EPDM. All corner brackets are to be made of CRCA with zinc phosphating.The mullions caps & louvered-clips should be of glass filled nilon. The sections are to be cut length miter joint with corner bracket & frames are fixed to the concrete/masonry walls by means of self expanding screws and glass to be used 5mm reflective with all taxes complete.(Analysis 2006 page-251,item-15)
104Providing, Fitting & Fixing of PVC Shutter of approved make with all fitting including all Fittings with Cost of pvc frame
105Supplying fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia. Of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.90mtr C/C and stainless square pipe of size 32mmx32mmx2mm in 3 rows in staircase as per approved design and specification etc all completed.
106Providing fifting and fixing of Al. door with anodized Al. door section No.9202 as vertical member, 9201 as top member and 9200 as bottom and middle member with frame section as 9221 and 12mm thick pre-laminated board fixed on door frame by means of tapered clip No. 4660 and the frame to be completed by meand of jointing angle No. 1855 including all cost of labour, T&p, hire charges of drilling machine, labour charges etc.complete.
107Wall painting 2-coats with plastic emulsion paint of approved shade over a coat of primer on new work including cost of paint.
108Providing supplying M.S. grill made out of 12mm sq. bar and 25x6mm M.S. angle of approved desing including all cost etc. complete.
109Painting 2-coats with any approved paint over one coat of primer on new wood or iron work including cost of materials.
110Fixing of antiskid ceramic floor tiles of Size 30cmx30cm / 40cmx40cm special plane / printed series of premium grade having thickness 7mm to 8mm confirming to IS 13753 laid on on 25mm thick bed of Cement mortar 1:1 ( 1 Cement : 1 sand ) and filling joint with white Cement of approved quality in slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tiles with cost of all materials labor etc. complete.
111Fixing of Ceramic wall tiles on wall 20cmx30cm / 20cmx20cm special plane / printed series of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753 on12 mm thick bed of Cement mortar 1:3 ( 1 Cement :3 sand ) jointed with neat Cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete excluding cost of tiles .
112Fixing of vetrified tiles in floors of Size 600x600mm of approved make coformaing to I.S:13755 laid on on 20mm thick bed of Cement mortar 1:4 ( 1 Cement : 4 sand ) and filling joint with white Cement of approved quality in slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tiles or stones. ( For new work)with cost of all materials labor etc. complete.
113Fixing of Granite tiles in dados, skirting riser of stepps 20cmx30cm / 20cmx20cm special plane / printed series of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753 on12 mm thick bed of Cement mortar 1:3 ( 1 Cement :3 sand ) jointed with neat Cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete excluding cost of tiles .
114Providing 2.5cm thick Grading Concrete in C.C (1:2:2) with 4.7 mm size CBHG Chips on new roof slab including cost of materials , labour, T&P all comp.
115PAVER BLOCK APPROACH ROAD- Earth work in excavation of foundation trenches in all kids of soil including dressing and leavelling the bed upto the required depth and depositing the excaveted materials with all leads & lifts T&P Shoring and shuttering watering if necessary etc. complete as per directed by the Engineer-in-charge.
116Supplying and filling foundation and plinth with sand watered and rammed including cost, conveyance, royalties and taxes of all materials and cost of all labour, T&P required for the work etc. complete (measurement will be taken on finished compacted section only) as directed by the Engineer-in Charge.
117Cement concrete (1:3:6) using approved quality from approved quarry including lowering laying concrete watering and curing etc. as required levels laid in layers not exceeding(0'-6'') 15 cm thick including cost, conveyance,royalities and taxes of all materials and cost of all labour ,T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge .
118Supply and laying M30 grade heavy duty factory made hydraucally pressed and mechanically compacted free cast inter looking paver block with sand binding and final compaction with plate vibrator finishing the surface including cutting the block with its edges and fixing kerbstone along both sede of the pathway all complete as per specification and direction of Engineer-in-charge. Main RoadApproach Road & Walk way Area:
119Walk way Area:
120RR Stone soling area
121SITE DEVELOPMENT -Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness
122Supply & Filling at all depth with available good filling Earth (excluding rock) in mechanical carriage of good garden soil etc. in the smart park area in layers not exceeding 15cm in depth consolidating each deposited layer by ramming and watering complete ( lead upto 100m) as directed by Enginner-In-Charge.
123Grass turfing with fine grassing including ploughing , dressing including watering , breaking of clods , removal of rubbish supplying of doobs grass roots at 10cm apart free from weeds and fit for moving including supplying good earth if needed in rows 15cm apart in either direction (morth, standard data book_DSR_2020_Horticulture sl.no.2.10 page 83) etc. complete as per directed by the Engineer-in-charge.
124Supplying and stacking of sludge at site (standard data book_DSR_2020_Horticulture code.no.2.30 page 83) etc. complete as per directed by the Engineer-in-charge.
125Spreading of sludge , dump manure in require thickness (standard data book_DSR_2020_Horticulture code.no.2.4.3. page 83) etc. complete as per directed by the Engineer-in-charge.
126Earth work in excavation of foundation trenches in all kids of soil including dressing and leavelling the bed upto the required depth and depositing the excaveted materials with all leads & lifts T&P Shoring and shuttering watering if necessary etc. complete as per directed by the Engineer-in-charge.
127Supplying and fixing of Random rubble hard granite stone masonry in cement mortar ( 1 : 6 ) in Foundation & Plinth including all cost, conveyance, taxes of all materials and labour etc all complete as per the required specification and direction of the Engineer-in- Charge
128Supplying and filling foundation and plinth with sand watered and rammed including cost, conveyance, royalties and taxes of all materials and cost of all labour, T&P required for the work etc. complete (measurement will be taken on finished compacted section only) as directed by the Engineer-in Charge.
129Cement concrete (1:3:6) using approved quality from approved quarry including lowering laying concrete watering and curing etc. as required levels laid in layers not exceeding(0'-6'') 15 cm thick including cost, conveyance,royalities and taxes of all materials and cost of all labour ,T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge .
130Fly ash bricks masonary incm (1:6) after immersing the bricks 6 hrs. in water before use in Foundation and plinth having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete.
131Fly ash bricks masonary in cm (1:6) in Superstructure after immersing the bricks 6 hrs. In water before use in all floors having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete.
13212 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.
133Fixing of vetrified tiles in floors of Size 600x600mm of approved make coformaing to I.S:13755 laid on on 20mm thick bed of Cement mortar 1:4 ( 1 Cement : 4 sand ) and filling joint with white Cement of approved quality in slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tiles or stones. ( For new work)with cost of all materials labor etc. complete.
134DRAIN- Earth work in excavation in ordinary soil within 50mt. initial lead and 1.5mt initial lift including rough dressing and breaking clods to 5 cm. to 7 cm. size laying in layers not more than 30 cm.in depth as per MoRT&H Specifications etc complete.
135Filling foundation and plinth with sand well watered and rammed including cost conveyance royalty of sand and labour etc complete.
136P.C.C. (1:3:6) as per drawing & technical specification including cost of all materials labour T&P etc complete.
137R.C.C. work of M-20 Grade as per drawing & technical specification including cost of all materials labour T&P etc complete.
138Supplying fitting and placing uncoated HYSD bar in skin reinforcement complete as per drawing and technical specification etc. complete.
139BOUNDARY WALL AND ENTRY GATE- Earth work in excavation of foundation trenches in all kids of soil including dressing and leavelling the bed upto the required depth and depositing the excaveted materials with all leads & lifts T&P Shoring and shuttering watering if necessary etc. complete as per directed by the Engineer-in-charge.
140Backfilling available excavated earth (excluding rock) in trenches , plinth , sides of foundations etc.in layers not exceeding 20cm in depth , consoildating each deposited layer by ramming and watering , lead upto 50m and lift upto 1.5m depth.
141Supplying and filling foundation and plinth with sand watered and rammed including cost, conveyance, royalties and taxes of all materials and cost of all labour, T&P required for the work etc. complete (measurement will be taken on finished compacted section only) as directed by the Engineer-in Charge.
142Cement concrete (1:3:6) using approved quality from approved quarry including lowering laying concrete watering and curing etc. as required levels laid in layers not exceeding(0'-6'') 15 cm thick including cost, conveyance,royalities and taxes of all materials and cost of all labour ,T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge .
143Fly ash bricks masonary incm (1:6) after immersing the bricks 6 hrs. in water before use in Foundation and plinth having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete.
144Fly ash bricks masonary in cm (1:6) in Superstructure after immersing the bricks 6 hrs. In water before use in all floors having C.S. 75kg/cm2 in cluding all cost, carriage, royality etc. complete.
14512 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.
14616 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.In Side Wall Surface
147Finishing wall surface with weather coat painting 2 coat over a coat of primer to the new surfaces of walls with all cost complete as per direction of Engineer-in-charge.
148Finishing wall surface with 3D painting 2 coat over a coat of primer to the new surfaces of walls with all cost complete as per direction of Engineer-in-charge.
149Painting 2-coats with any approved paint over one coat of primer on new wood or iron work including cost of materials.
150Fixing of Granite tiles in dados, skirting riser of stepps 20cmx30cm / 20cmx20cm special plane / printed series of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753 on12 mm thick bed of Cement mortar 1:3 ( 1 Cement :3 sand ) jointed with neat Cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete excluding cost of tiles .
151CHANGING ROOM- Earth work in excavation of foundation trenches in all kids of soil including dressing and leavelling the bed upto the required depth and depositing the excaveted materials with all leads & lifts T&P Shoring and shuttering watering if necessary etc. complete as per directed by the Engineer-in-charge.
152Supplying and filling foundation and plinth with sand watered and rammed including cost, conveyance, royalties and taxes of all materials and cost of all labour, T&P required for the work etc. complete (measurement will be taken on finished compacted section only) as directed by the Engineer-in Charge.
153Cement concrete in foundation (1:3:6) using approved quality from approved quarry including lowering laying concrete watering and curing etc. as required levels laid in layers not exceeding(0'-6'') 15 cm thick including cost, conveyance,royalities and taxes of all materials and cost of all labour ,T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge .
154Cement concrete at plinth level (1:3:6) using approved quality from approved quarry including lowering laying concrete watering and curing etc. as required levels laid in layers not exceeding(0'-6'') 15 cm thick including cost, conveyance,royalities and taxes of all materials and cost of all labour ,T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge .
155Brick Masonbary upto Plinth Top
156Brick Masonbary above Plinth Top
157Flooring with Tile
15816 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.In Side Wall Surface
15912 mm thick cement plaster in cm (1:6) over brick wall finished smooth after raking out the joints including watering, curing with cost, conveyence etc.complete.
160wall painting 2 coat with weather coat over a coat of primer to the new surfaces of walls with all cost complete as per direction of Engineer-in-charge.
161Supplying & Wiring for light point/ fan/ exhaust fan point/ call bell point with 1.5 sqmm FR PVC insulated copper conductor single core cable in surface / recessed 2 mm thick PVC conduit with modular switch and earthing the point with 1.5 sqmm FRLSH PVC insulated copper conductor single core cable including providing modular box with cover of requisite number of modules including providing cover plates as required.
162Single light point controlled by one 6A switch or first light point of group control.
163Subsequent point of group control
164Supplying and fixing two module steeped type electronic fan regulator with proper modular plate switch box including connections etc. as required.
165Supplying and fixing 6 Amp plug with 6 Amp switch (Modular Type) on existing switch board.
166Supplying & fixing of suitable size GI Box with modular plate and cover in front on surface or in recess, including providing and fixing 3pin 5/6 amps modular socket outlet and 5/6 amps modular switch etc. as required.
167Supply, installation, testing & commissioning of 6 / 16 Amp Plug Boards consisting of a 16 Amp clip-in type modular switch with indicator and a 6/16 Amp clip-in type modular shuttered plug socket fixed on metallic concealed box including interconnections and making good the damages caused complete as required and as per direction of Engineer-in-charge.
168Supplying, installation, testing & commissioning of 20 Amp AC starter switch with 20 Amp modular socket outlet with 25 Amp Plug on surface or in recess, on 2 Nos two module GI box with plate etc. complete with direction of Engineer-in-charge. Starter-Crabtree(cat no-ACTO202504) or equivalent.
169Wiring for circuit/ submain wiring along with earth wire of following size of FRLSH heavy gauge PVC insulated copper conductor single core cable in heavy duty PVC conduit laid in surface/ recess as required.
1702X2.5 + 1X2.5 sqmm FRLS Cu wire
1712X4 + 1X2.5 sqmm FRLS Cu wire
1722X6 + 1X2.5 sqmm FRLS Cu wire
1734X6 + 2X2.5 sqmm FRLS Cu wire
1744X10 + 2X4 sqmm FRLS Cu wire
175Fan & indoor Fixtures
176Supply, delivery and fixing of Ceiling fan hook box made out of 18 swg GI sheet and containing 10 mm dia round ms bar projecting atleast 150mm on either side & duly bent to accommodate ceiling fan down rod bolt & having earthing arrangement as per direction of Engineer-in-charge.
177Supplying, installation, testing and commissioning following type of light fixture with all other accessories, as required.(The colour temprature shall be between 5000 deg K as per application).
178Fully diffused type Recessed mounted round type LED fitting (1800 Lumen/ 18W) similar to Wipro (CAT No:LD06-221-XXX-57-RF*)/ Equivalent of Philips/ LT.
179Commercial Batten type wall or surface mounted 4' LED fitting (2000 Lumen/ 20W) similar to Wipro (CAT No:LL24R-251-XX-57-2F) / / Equivalent of Philips/ LT.
180Wall mounted LED Bulk head fitting (10W) similar to Wipro (CAT No:LW07-141-XXX-57-G1)/ Equivalent of Philips/ LT.
181Supplying, installation, testing and commissioning of ceiling fan (5 star rating) including wiring the down rod, earthing etc as required (Make : Bajaj/Usha/ Crompton/ Orient/ Khaitan/ Havells).
1821200 mm sweep
183Supplying, installation, testing and commissioning of wall mounted fan (5 star rating) including earthing etc as required (Make : Bajaj/Usha/ Crompton/ Orient/ Khaitan/ Havells).
184400 mm sweep 1300 RPM
185Supplying, installation, testing and commissioning of Heavy Duty Exhaust fan (5 star rating) including louvres, Ceiling Rose & Electric Connection as required. (Make -Bajaj/Usha/ Crompton/ Orient/ Khaitan/ Havells)
186300mm sweep 900 RPM
187Panel, DB & MDBs
188Main Dsistribution Panel
189S/I/T&Commissioning of LT INDOOR Wall/floor mounted cubical type electrical panel made out by 2mm CRCA steel sheet duly derusted & painted by simens grey powder cote paint is designed as G.A drawing as per direction of Engg.-in-Charge. Warrentee period of replacement of panel & accessories must be 1 years & compelete test certificate must be submitted along with panel board including component list.3P+N Type 2 40 kA SPD with 63A rating,10KA breaking capacity ,4P MCB shall be installed in the incomer.25x10mm Separate Aluminium Earth bus bar should be installed.All the incoming and outgoing feeders shall have ON/OFF/TRIP indication.
190One (1) no Incomer- 100 Amp FP , 25KA MCCB with 3 Nos Phase indicating lamps with control fuse/ MCB Digital Voltmeter and Ammeter with selector switch with required other accesories.
191Busbar - 100 Amp, 25KA Al TPN busbar suitable for operation at 415 Volt, 50 Hz, 3 Phase supply
192Eight (8) - Outgoing Feeders for (1 No. of PDB, 1 No LDB, 1 No Water Supply, two nos. external lighting feeder pillar Panel & Three spares) each Comprising of
193One (1) - 63 to 32 Amp 4P, 10 KA MCB (C-Curve)
194PANEL AS ABOVE
195Supplying and fixing following way, horizontal type three pole and neutral, sheet steel, MCB distribution board, 415 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator). (For all Floor DBs)
1966 way Single metal door
197Supplying and fixing following rating MCBs/ Isolator/RCCB in the existing MCB DB complete with connections,testing and commissioning etc. as required.
19863 Amps, TPN 10 KA MCB (C-Curve)
19925 Amp to 32 Amps, TPN 10 KA MCB (C-Curve)
2006 Amp to 32 Amp, 10 KA SP MCB (C-Curve)
201Conduits-Supply, delivery and laying of following sizes of medium class PVC Conduit concealed in wall/ column/ roof slab of the building alongwith other accessories and 18 swg GI wire complete for Electrical Wiring/Telephone / TV & Data cable wiring as required other accessories as per direction of Engineer-in-charge.
20220mm dia
20325mm dia
204Earthing System-Supply of materials and installation of pipe earth electrode made out of 40mm dia class B G.I. pipe of 4.5 metre long with arrangements for fitting/ termination of G.I. flat / wire with G. I. nut bolts & washers including cost of burnt wood charcoal, salt, foreign soil, water pouring arrangements, brick masonary enclosure on top with removable RCC cover complete with labour for excavation of pit in all kinds of soil & rock as required and as per direction of Engineer-in-charge.
205Providing and fixing of 8 swg GI Wire on surface or on recess as required.
206Cables, Cable Laying & Termination- Supply of XLPE insulated PVC sheathed aluminium conductor 1.1 KV grade steel armoured UG cable confirming to IS 7908 (Part-I) as amanded up to date of following sizes 3.5 core x 25 sqmm
2074 core x 10 sqmm
2084 core x 6 sqmm
209Laying of one number PVC insulated and PVC sheathed/XLPE power cable of 1.1KV grade of following size direct in ground including excavation (75 cm),sand cushioning,protective covering and refilling the trench etc as required.
210Upto 25 sq. mm
211Laying and fixing of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1 KV grade of following size on wall surface as required.
212Upto 25 sq. mm (clamped with 1mm thick saddle)
213Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required.
2143.5 core x 25 sqmm
2154 core x 10 sqmm
2164 core x 6 sqmm
217External Lighting & other AccessoriesSupplying, Erection, Fixing, connection & testing of 40W LED GATE Light of (Make: Panasonic/LT/Havells /Philips/Wipro /Crompton/Bajaj) maintenance free having 2 years warranty G.I P ipe with braket including MCB box & including with foundation as per the Drawing for inspection as required & as per direction of Engg.-in-Charge.
218Street Lights: Supply, erection, testing & commissioning of road lighting HDG Octagonal Pole conforming to IS 875 and BS EN ISO 1461 & 410 SP 33 of 7.0 meter with base plate drilling of 1\\" dia hole on the upper portion of the pole for the installtion of street light and 1\\" dia hole on the lower portion of the pole for entry of the wire Base pole paintng of red oxide and two coats of black enamel paint. The poles shall have extra provided and fixed with 4'x2' dia being erected by laying 5'x2'x2' (length, breadth and width) cement concrete block in the ratio 1:3:6 and block be continued up to 1 feet above the ground level i.e 4 feet below ground level including surface plastering the job including excavation of pole with 4 feet deep and refilling the same after installation of the pole and with holes at top of the pole for fixing ring type single armed GI braket for the installation of the integral flood light luminaire of 80 watt. The Dust and wheather proof gasket using for 250mmx200mmx150mm deep box nominal size of 16 SWG thick MS sheet cable looping box with the existing pole with MS clamp made out of 25mmx3mm thick flat iron with suitable nuts and bolts complete with hinged cover and locking screws earth studs neoprene gasket suitable for Nos 4 pole mounted including supply and fixing one no 6 Amp MCB carrier with base and 4 way 60 Amp terminal block suitable to receive PVC armoured cable fixed on suitable size Baketillte sheet base complete connection through GI pipe (classB) 40 mm dia Nominal 1.5 mtr length along the pole or protection of underground cable (on vertical run) with painting all complete as the direction of EIC(Wind speed 250Km/hr shall be considered) . Similar to Wipro, Signify (Philips only), LT.
219Feeder Pillar for External LightsSupplying installation testing commissioning if double door feeder pillar fabricated out of 3 mm thick CRCA sheet duly painted, 100 Amp Al busbar with neutral bus bar including cc/ brick foundation, Ameter, CT , Voltmeter, Rain Canopy as required including following internal fixtures.
2201 No - 32 Amp FP , 25 KA MCCB Incomer with suitable contactor and astronomical Analouge Timer
22106 Nos - 16 Amp TPN MCB Outgoing
2221 No - 16 Amp SP MCB with 6/16 Amp socket outlet with 10 Amp modular switch and 1 No- Bracket Holder with 6 Amp Modular switch.
223MiscellaneousSupply & fixing of Safety Equipment
224415KV Rubber Mat(1M x 2M x 2.0MM)
225Shock Treatment Chart & SLD
226Safety Gloves
227Two sided EXIT LED Light fitting signage(both side visible) with built in battery back-up for 2 hrs with proper wiring with PVC conduiting from the existing power sources for all floors etc. Make:- BAJAJ (CAT No : BESL O3 LED SSD WBB Green) / Equivalent.
228provision for PH and Sanitary items or quantity (as per agreement ) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56594535
AUTHORITY Local Bodies
TENDER VALUE 3.13 Crore
LAST DATE 12-08-2026
Authority
Authority Name Municipal Bodies
Work Description Tender for Renovation Of Crematorium At Dhangarpada, Keonjhargarh Municipality
Basic Detail
Tender No ODULB_KGM_02/2026-2027
Bidding Type Tender
Location
City Kendujhar
State Odisha
Key Dates
Publish Date 22 Jul 2026
Submission Date 12 Aug 2026
Open Date 17 Aug 2026
Finance
Tender Value 3.13 Crore
Tender Fee 11800
EMD 3.13 Lakhs
Exemption Available
Document List
BOQ_602613.xls
c9c4a213-d1f2-4cf8-8747-c288d5a9ef72.html
DTCN.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 22, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 12, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days
Aug 17, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 15 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_602613.xls

html

c9c4a213-d1f2-4cf8-8747-c288d5a9ef72.html

pdf

DTCN.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders