Supply Of WIRE ROPE ASSEMBLY FOR 60KVA TRANSFORMER [ D TO FOLLOWED.] => Limited
Tender Overview
Project Description
Supply Of wire rope assembly for 60kva transformer [ d to followed.] , wire rope assembly for 60kva transformer, as per drawing: edml152,rev-a, pa cking instruction: pi042 ver 3.0 (1) drawing no. icf/j&t/misc-2487 alt. `b? to be followed. (2) i t should be ensured that item should not rub during transportation. the item should be packed with adequate strength. transit damage, if any, shall be at the cost of suppli er. for underframes: both (1) & (2) to be followed as stated above. for other items exc ept underframes: only (2) need to followed. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
TodayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender