Tender For Final Silviculture Thinning Operations At 1978 Karikattoor (38.61Ha) In Erumely Range And Transporting The Timber To Govt Depots At Par Uzha,Vettikkad,Thalakod And Kothamangalam,Teak Poles,Teak Billets And Firewood To Dumbing Depot 1964 Tp
Tender Overview
Project Description
Tender for Final Silviculture Thinning Operations At 1978 Karikattoor (38.61Ha) In Erumely Range And Transporting The Timber To Govt Depots At Par Uzha,Vettikkad,Thalakod And Kothamangalam,Teak Poles,Teak Billets And Firewood To Dumbing Depot 1964 Tp Karikatoor In Erumely Range During 2025-26 & 2026-27 (Re-Tender 2)
BOQ
| Sl. No. | Item Description |
| 1 | Final silviculture thinning operations |
| 2 | Clearing the boundary line of the plantation as well as 1964TP Karikkattoor Dumping depot to a width of 5.2 M and Fire tracing cleared boundary of the plantation as well as Dumping depot by scraping 1.8 M on either side and burning centre belt. |
| 3 | CP10% |
| 4 | Clearing jungle growth for 5thSilvicultural thinning (final thinning) operations |
| 5 | CP10% |
| 6 | Felling preparation of Hard wood log not to be debarked for logs 1/2 m3 and below |
| 7 | CP10% |
| 8 | Felling preparation of Hard wood log not to be debarked for logs above 1/2 m3 |
| 9 | CP10% |
| 10 | 5thSilvicultural thinning - providing axe men for felling teak poles II to V class |
| 11 | CP10% |
| 12 | Conversion & classification of II class teak poles |
| 13 | CP10% |
| 14 | Conversion & classification of III class teak poles |
| 15 | CP10% |
| 16 | Conversion & classification of IV class teak poles |
| 17 | CP10% |
| 18 | Conversion & classification of V class teak poles |
| 19 | CP10% |
| 20 | Chisel numbering of II class teak poles |
| 21 | CP10% |
| 22 | Cross cutting of timber with saw below 125 cm in girth |
| 23 | CP10% |
| 24 | Cross cutting of timber with saw between 125 and 150 cm in girth |
| 25 | CP10% |
| 26 | Cross cutting of timber with saw above 150 cm in girth |
| 27 | CP10% |
| 28 | Construction of drag path at Dumping depot |
| 29 | CP10% |
| 30 | Mechanical dragging from stump site for an initial lead of 200m and stacking timber including IInd class poles |
| 31 | CP10% |
| 32 | Haulage of IIIclass teak poles up to 400m |
| 33 | CP10% |
| 34 | Haulage of IVclass teak poles up to 400m |
| 35 | CP10% |
| 36 | Haulage of Vclass teak poles up to 400m |
| 37 | CP10% |
| 38 | Loading timber and teak poles in lorries |
| 39 | CP10% |
| 40 | Transportation of timber teak and other hardwood timber except teak poles to Govt. Timber Depot at Parampuzha .(5 km coupe road 66.45 & 33.33% of enhancement 22.15, for next 5km @ 13.29/km 66.45 for next 15 km @ 8.78/km 131.7, for next 35km @ 7.10/km 248.5 |
| 41 | CP10% |
| 42 | Transportation of timber teak and other hardwood timber except teak poles to Govt. Timber Depot at Vettiikad.(5 km coupe road 66.45 & 33.33% of enhancement 22.15, for next 5km @ 13.29/km 66.45 for next 15 km @ 8.78/km 131.7, for next 50km @ 7.10/km 355 |
| 43 | CP10% |
| 44 | Transportation of timber teak and other hardwood timber except teak poles to Govt. Timber Depot at Thalakkode (5 km coupe road 66.45 & 33.33% of enhancement 22.15, for next 5km @ 13.29/km 66.45 for next 15 km @ 8.78/km 131.7, for next 65km @ 7.10/km 461.5 |
| 45 | CP10% |
| 46 | Transportation of timber teak and other hardwood timber except teak poles to Govt. Timber Depot at Kothamangalam (5 km coupe road 66.45 & 33.33% of enhancement 22.15, for next 5km @ 13.29/km 66.45 for next 15 km @ 8.78/km 131.7, for next 55km @ 7.10/km 390.5 |
| 47 | CP10% |
| 48 | Transportation of teak poles to Dumping Depot at Karikkattoor (1964TP)Plantation lead to below in 10 km (13.29 x10 +33.33 % enhancement) |
| 49 | CP10% |
| 50 | Unloading timber and poles |
| 51 | CP10% |
| 52 | Stacking of teak poles at dumbing depot |
| 53 | CP10% |
| 54 | Billeting and stacking of teak billets at sites excluding felling |
| 55 | CP10% |
| 56 | Transportation of teak billets by head load up to 200 m. |
| 57 | CP10% |
| 58 | Loading teak billets in lorries |
| 59 | CP10% |
| 60 | Transportation of teak billets to dumping depot including 33.33 % enhancement for coupe roads (Coupe road -10 Km and tar road - Nil)(9.96 x 10 +33.33 % enhancement) |
| 61 | CP10% |
| 62 | Unloading and stacking of teak billets at dumping depot |
| 63 | CP10% |
| 64 | Billeting and stacking of teak fire wood , Jungle wood at sites excluding felling (FW) |
| 65 | CP10% |
| 66 | Transportation of teakfire wood and jungle fire wood head load up to 200 m. |
| 67 | CP10% |
| 68 | Sectioning up to 150 mm & forming surface of old coup roads and chappaths |
| 69 | Rough stone package for chappaths, gutters & slushy portions of coupe roads |
| 70 | CP10% |
| 71 | Clearing light jungle growth at dumping depot for stacking materials |
| 72 | Construction of temporary shed with jungle wood posts and thatching with grass for staying staff, labourers and protection watchers |
| 73 | CP10% |
| 74 | Engaging 2 man mazdoors for 6 months for assisting staff in the registration of materials |
| 75 | Provision for VDA |
| 76 | Provision for contingencies like Registers, A4paper, DTP & Photocopy charges, coir,tape, Electrical items including electrification of depot and other unforeseen items Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender