Tender For Work Of Providing And Erection Of Additional Poles At Long Spans Under The Jurisdiction Of 33/11 Kv Electricity Sub-Station, Sitarganj Of Electricity Distribution Division, Sitarganj (Under O&M Head).( Rates Quoted Without Gst) (Gst Will P
Tender Overview
Project Description
Tender for Work Of Providing And Erection Of Additional Poles At Long Spans Under The Jurisdiction Of 33/11 Kv Electricity Sub-Station, Sitarganj Of Electricity Distribution Division, Sitarganj (Under O&M Head).( Rates Quoted Without Gst) (Gst Will Paid Extra)
BOQ
| Sl. No. | Item Description |
| 1 | Annexure-A (Supply of following material as per UPCL Norms.) |
| 2 | Supply of MS Nuts, Bolts and Washers off size. |
| 3 | Supply of X-Arm Clamp suitable for PCC Pole complete with Nuts, Bolts and Washers. |
| 4 | Supply of X-Arm Clamp suitable for SP-55 Steel Tubular Pole complete with Nuts, Bolts and Washers. |
| 5 | Supply of LT Clamp suitable for PCC Pole complete with Nuts, Bolts and Washers. |
| 6 | Supply of Stay Clamp suitable for 8.5 Mtr PCC Pole complete with Nuts, Bolts and Washers. |
| 7 | Supply of LT Clamp suitable for SP-55 Steel Tubular Pole complete with Nuts, Bolts and Washers. |
| 8 | Supply of Stay Insulator, size 75×90 mm, conforming to relevant UPCL specifications. |
| 9 | Annexure-B (Following work as per UPCL norms) |
| 10 | Excavation of pit of required dimensions for erection of Stay Set in all types of soil, including dressing, backfilling and disposal of surplus excavated earth complete. |
| 11 | Providing and erection of complete LT Stay Set including excavation, stay rod, stay plate, stay wire, turn buckle, stay insulator, backfilling, ramming and all accessories complete as per UPCL specifications. |
| 12 | Providing and erection of complete 11 kV Stay Set including excavation, stay rod, stay plate, stay wire, turn buckle, stay insulator, backfilling, grouting and all associated accessories complete as per UPCL standards. |
| 13 | Providing and laying PCC grouting around stay rod/stay plate with approved cement concrete mix, including curing and finishing complete. |
| 14 | Excavation of pit of required size and depth for erection of Pole in all types of soil, including dressing, dewatering (if required), backfilling and disposal of surplus earth complete. |
| 15 | Erection, alignment, plumbing and fixing of Single PCC Pole complete with excavation, backfilling, ramming and all incidental works as per UPCL specification. |
| 16 | Erection and alignment of Single Steel Tubular Pole (SP-55) complete with excavation, backfilling, grouting (where required) and all incidental works as per UPCL specifications. |
| 17 | Providing PCC grouting around the erected pole with approved cement concrete mix, including curing and finishing complete. |
| 18 | Laying of Weasel ACSR Conductor on HT Line including jumpering, clipping, jointing and testing complete as per UPCL construction standards. |
| 19 | Lopping, trimming and chopping of tree branches along the HT/LT line corridor to maintain statutory electrical clearances, including disposal of cut branches as directed by Engineer-in-Charge. |
| 20 | Cartage of PCC Pole including Loading, transportation, unloading and stacking for a lead of 21–50 Km from departmental store to work site complete. |
| 21 | Cartage of SP-55 Steel Tublar Poles inclucing Loading, transportation, unloading and stacking for a lead of 21–50 Km complete. |
| 22 | Cartage of Petty material including Loading, transportation, unloading and safe delivery for a lead of 21–50 Km including handling and stacking complete. |
| 23 | Straightening and realignment of tilted PCC Pole including excavation, tightening of stays (where required), refilling, ramming and restoration to original vertical position complete. |
| 24 | Resagging, tensioning and proper adjustment of LT line conductor to maintain standard ground clearance and conductor sag as per UPCL standards. |
| 25 | Sagging/Resagging and tensioning of ACSR HT Line conductor span including adjustment of conductor tension, binding and restoration of statutory clearances complete. |
| 26 | Providing, fixing and dressing of jumper connections on HT/LT section poles complete with connectors, binding wire and all associated hardware as per UPCL specification. |
| 27 | Fixing of 33 kV Pin Insulator on cross arm including necessary G.I. hardware, tightening, alignment and complete installation as per UPCL standards. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.