Supply Of Modified Connecting Tubular copper pipe
Tender Overview
Project Description
Supply Of modified connecting tubular copper pipe , modified connecting tubular copper pipe line with end fittings duly brazed for radiator and c onservator of transformer capacity 3900 /5400 kva as per els/lgd drg.no.c /els/lgd/tfp/2/19 .in ref no 2 threaded flange opposite hole should be 85 mm instead of 69 mm side by hole should be 60 mm instead o f 69 mm. [ warranty period: 30 months after the date of delivery ] ]
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender