Power Boards / Undertakings / PSU Closing in 13 days TDR #56580683

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - As Per Atc/Boq; As Per Atc/Boq; As Per Atc/Boq - Handling And Dragging Of Transformer From Stacking Yard To Repairing Hall With Accessories. , Cutti

Issued by Boards / Undertakings / PSU · Lucknow, Uttar Pradesh
Tender Value
1.08 Crore
Estimated cost
Bid Submission
05 Aug 2026
13 days left
EMD
91800
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Lucknow → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - As Per Atc/Boq; As Per Atc/Boq; As Per Atc/Boq - Handling And Dragging Of Transformer From Stacking Yard To Repairing Hall With Accessories. , Cutting/Opening Of Top Cover Plates & Fitting Of The Transformers, Draining Of Its Oil & Detanking Of Core & Coil Assembly With Help Of Pneumatic Tools. , Dismantling Of Core & Coil Assembly And Cleaning Of Core And Tank (Inside) By Using Warm Old Oil And Hot Air Making It Dirt Free/Sludge Free. , Reconditioning/ Making Of L.V Leg Coils From Reconditioned Strips/New Dpc Strips, Of Same Size And No. Of Turns And Dimensions As Old One. , Reconditioning/Making Of H.V Leg Coils From New Dpc Or Se Wire Of Same Size And No. Of Turns And Dimensions As Old One. , Assembly Of Core, Channel (Duly Painted By Zinc Chromatic Paint) & Coil And Fitting Of Other Parts Requiring Replacements Such As Press Board Making Supports Between Adjacent Section By Insulating Spacers & Tapping Etc. , Shifting And Keeping The Assembled Core& Coil Etc. In Oven From The Repairing Area. , Dragging Of Transformer Tank To Washing Area And Cleaning Of Rust/Dirt Etc From Outer Surface By Using Caustic Soda & Water Solution. , Repairing Of Damaged T/F Body/Radiator By Electric/Gas Welding Complete In All Respect For Arresting Oil Leakage. , Completely Drying & Cleaning Of T/F Tank (Inside And Outside) By Using Hot Air/Cotton Waste/Sand Paper Etc Completely And Making It Ready For Painting , Painting Of Inner Side Of T/F Tank With Heatproof Zinc Chromatic Paints In Two Coats After Providing Primer Of Red Oxide Paint. , Dragging/Shifting Out Empty Tank After Painting To Assembly Area. , Taking Out Core And Coils Assembly From The Oven And Shifting To Repairing Area & Again Tightening The Assembly. , Welding/Fixing The Top Cover After Tanking Of Core And Coil Assembly Into Painted Tank And Tightening Of Assembly Into The Tank And Fitting All Accessories Of Transformer With Help Of Pneumatic Tools And Filling Of Oil, Alongwith Bringing Oil Gauge In Working Condition For Transformers In Which Oil Gauge, Cast Iron And Nut Bolts Are Present , Spray Painting Of Transformer Tank From Outside With Super Enamel Synthetic Grey Paint In Two Coats After Providing Primer Of Red Oxide Paint , Dragging/Shifting Of Repaired T/F Near To The Test Cabin/Testing Place And Dragging /Shifting T/F To Yard After Testing And Its Stacking At Identified Place. , Punching And Welding Of M.S. Plate Of 100X50x3mm Size On The Outside Of T/F Containing Following Information. (I) Unique Number, (Ii) Capacity (Iii) Name Of Workshop (Iv) Date Of Repair , Making Of Broken Delta/Star Connection With Suitable Size Of Alu. Ferrule/Soldering The Joint With Suitable Brazing Rod Including All Associated Work. , Making Of Broken Hv/Lv Lead Connection With Suitable Size Of Alu. Ferrule Including All Associated Work. , Handling And Dragging Of Damaged Transformer From Stacking Yard To Repairing Hall With Accessories , Cutting/Opening Of Top Cover Plates & Fitting Of The Transformers, Draining Of Its Oil & Detanking Of Core & Coil Assembly With Help Of Pneumatic Tools. , Dismantling Of Core & Coil Assembly And Its Cleaning. , Dismantling Of Shell Core And Coil Assembly. Removing Of Hv And Lv Leg Coils For Assessing Its Reuse, Reuse Of Major Insulating Material If Possible, Checking And Recording Of Physical Dimensions Of Coil. , Making Of Complete Hv & Lv Leg Alu. Leg Coils Identical To Original One With Same Number Of Turns, Weight Etc Providing Super Enameled/Dpc Conductor/ Strip Confirming To Is 1971 153 In Place Of Old And Damage Coil. Alu. Coil, Wire Strip Will Be Provided By The Department. All Coil Assembly Of Identical Voltage Shall Be Interchangeable Without Requiring Any Special Equipment. Shell Coil Shall Be Supported Between Adjacent Sections By Insulations (Flick Paper) Paper, Spacers, Beamers And Other Insulations. Rewinding Shall Be Arranged To Ensure Free Circulation Of Oil To Reduced Hot Spots In Winding. The Insulation Of Coil Shall Be Treated With Suitable Insulating, Varnish Or Equivalent Compound To Develop The Full Electrical Strength Of , Assembly Of Shell Core (Three Limbs) Coils And Fitting Of Top And Other Parts. Replacement Of Insulation Such As Press Board, Craft Paper, Making Support Between Adjacent Section By Insulating Spacers And Wrapping Etc. Shifting Of Repaired Core Coil Assembly And Placement Inside The Oven For Proper Dry Out. , Shifting And Keeping The Assembled Core& Coil Etc. In Oven From The Repairing Hall , Dragging Of Transformers Tank From The Repairing Hall To Washing Area And Its Complete Washing, Cleaning, Removing Of Rust And Carbon Etc. , Repairing Of Damaged T/F Body/Radiator By Electric/Gas Welding Complete In All Respect For Arresting Oil Leakage. , Painting Of Inner Side Of T/F Tank With Heatproof Zinc Chromatic Paints In Two Coats After Providing Primer Of Red Oxide Paint. , Dragging/Shifting Out Completely Dried Empty Tank After Painting To Repairing Hall. , Taking Out Core And Coils Assembly From The Oven And Shifting To Repairing Hall. , Welding/Fixing The Top Cover After Tanking Of Core And Coil Assembly Into Painted Tank And Tightening Of Assembly Into The Tank And Fitting All Accessories Of Transformer With Help Of Pneumatic Tools And Filling Of Oil, Along With Bringing Oil Gauge In Working Condition For Transformers In Which Oil Gauge, Cast Iron And Nut Bolts Are Present , Spray Painting Of Transformer Tank From Outside With Supper Enamel Synthetic Grey Paint In Two Coats After Providing Primer Of Red Oxide Paint , Dragging/Shifting Of Repaired T/F Near To The Test Cabin/Testing Place And Dragging /Shifting T/F To Yard After Testing And Its Stacking At Identified Place. , Punching And Welding Of M.S. Plate Of 100X50x3mm Size On The Outside Of T/F Containing Following Information. (I) Job Number, (Ii) Capacity (Iii) Name Of Workshop (Iv) Date Of Repair , Making Of Broken Delta/Star Connection With Suitable Size Of Alu. Ferrule/Soldering The Joint With Suitable Brazing Rod Including All Associated Work. , Making Of Broken Hv/Lv Lead Connection With Suitable Size Of Alu. Ferrule Including All Associated Work.

BOQ

Sl. No. Item TitleItem Description
1Handling and Dragging of Transformer from stacking yard to repairing hall with accessories.Handling and Dragging of Transformer from stacking yard to repairing hall with accessories.
2Cutting/Opening of top cover plates & fitting of the transformers, draining of its oil & Detanking of core & coil Assembly with help of pneumatic tools.Cutting/Opening of top cover plates & fitting of the transformers, draining of its oil & Detanking of core & coil Assembly with help of pneumatic tools.
3Dismantling of core & coil Assembly and cleaning of core and tank (inside) by using warm old oil and hot air making it dirt free/sludge free.Dismantling of core & coil Assembly and cleaning of core and tank (inside) by using warm old oil and hot air making it dirt free/sludge free.
4Reconditioning/ Making of L.V leg coils from reconditioned strips/new DPC strips, of same size and No. of turns and dimensions as old one.Reconditioning/ Making of L.V leg coils from reconditioned strips/new DPC strips, of same size and No. of turns and dimensions as old one.
5Reconditioning/Making of H.V leg coils from new DPC or SE wire of same size and No. of turns and dimensions as old one.Reconditioning/Making of H.V leg coils from new DPC or SE wire of same size and No. of turns and dimensions as old one.
6Assembly of core, channel (duly painted by zinc chromatic paint) & coil and fitting of other parts requiring replacements such as press board making supports between adjacent section by insulating spacers & tapping etc.Assembly of core, channel (duly painted by zinc chromatic paint) & coil and fitting of other parts requiring replacements such as press board making supports between adjacent section by insulating spacers & tapping etc.
7Shifting and keeping the assembled core& coil etc. in OVEN from the repairing area.Shifting and keeping the assembled core& coil etc. in OVEN from the repairing area.
8Dragging of transformer tank to washing area and cleaning of rust/dirt etc from outer surface by using caustic soda & water solution.Dragging of transformer tank to washing area and cleaning of rust/dirt etc from outer surface by using caustic soda & water solution.
9Repairing of damaged T/F body/radiator by electric/gas welding complete in all respect for arresting oil leakage.Repairing of damaged T/F body/radiator by electric/gas welding complete in all respect for arresting oil leakage.
10Completely drying & Cleaning of T/F tank (inside and outside) by using hot air/cotton waste/sand paper etc completely and making it ready for paintingCompletely drying & Cleaning of T/F tank (inside and outside) by using hot air/cotton waste/sand paper etc completely and making it ready for painting
11Painting of inner side of T/F tank with heatproof zinc chromatic paints in two coats after providing primer of red oxide paint.Painting of inner side of T/F tank with heatproof zinc chromatic paints in two coats after providing primer of red oxide paint.
12Dragging/shifting out empty tank after painting to assembly area.Dragging/shifting out empty tank after painting to assembly area.
13Taking out core and coils assembly from the OVEN and shifting to repairing area & again tightening the assembly.Taking out core and coils assembly from the OVEN and shifting to repairing area & again tightening the assembly.
14Welding/fixing the top cover after tanking of core and coil assembly into painted tank and tightening of assembly into the tank and fitting all accessories of transformer with help of pneumatic tools and filling of oil, alongwith bringing oil gauge in working condition for transformers in which oil gauge, cast iron and nut bolts are presentWelding/fixing the top cover after tanking of core and coil assembly into painted tank and tightening of assembly into the tank and fitting all accessories of transformer with help of pneumatic tools and filling of oil, alongwith bringing oil gauge in working condition for transformers in which oil gauge, cast iron and nut bolts are present
15Spray painting of transformer tank from outside with super enamel synthetic Grey paint in two coats after providing primer of red oxide paintSpray painting of transformer tank from outside with super enamel synthetic Grey paint in two coats after providing primer of red oxide paint
16Dragging/shifting of repaired T/F near to the test cabin/testing place and dragging /shifting T/F to yard after testing and its stacking at identified place.Dragging/shifting of repaired T/F near to the test cabin/testing place and dragging /shifting T/F to yard after testing and its stacking at identified place.
17Punching and welding of M.S. plate of 100x50x3mm size on the outside of T/F containing following information. (I) Unique number, (II) Capacity (III) Name of workshop (IV) Date of repairPunching and welding of M.S. plate of 100x50x3mm size on the outside of T/F containing following information. (I) Unique number, (II) Capacity (III) Name of workshop (IV) Date of repair
18Making of broken delta/Star connection with suitable size of Alu. Ferrule/soldering the joint with suitable brazing rod including all associated work.Making of broken delta/Star connection with suitable size of Alu. Ferrule/soldering the joint with suitable brazing rod including all associated work.
19Making of broken HV/LV lead connection with suitable size of Alu. Ferrule including all associated work.Making of broken HV/LV lead connection with suitable size of Alu. Ferrule including all associated work.
20Handling and Dragging of damaged Transformer from stacking yard to repairing hall with accessoriesHandling and Dragging of damaged Transformer from stacking yard to repairing hall with accessories
21Cutting/Opening of top cover plates & fitting of the transformers, draining of its oil & Detanking of core & coil Assembly with help of pneumatic tools.Cutting/Opening of top cover plates & fitting of the transformers, draining of its oil & Detanking of core & coil Assembly with help of pneumatic tools.
22Dismantling of core & coil Assembly and its cleaning.Dismantling of core & coil Assembly and its cleaning.
23Dismantling of Shell Core and coil assembly. Removing of HV and LV Leg coils for assessing its reuse, reuse of major insulating material if possible, checking and recording of physical dimensions of coil.Dismantling of Shell Core and coil assembly. Removing of HV and LV Leg coils for assessing its reuse, reuse of major insulating material if possible, checking and recording of physical dimensions of coil.
24Making of complete HV & LV leg Alu. Leg coils identical to original one with same number of turns, weight etc providing super enameled/DPC conductor/ Strip confirming to IS 1971 153 in place of old and damage coil. Alu. coil, wire strip will be provided by the department. All coil assembly of identical voltage shall be interchangeable without requiring any special equipment. Shell Coil shall be supported between adjacent sections by insulations (flick Paper) Paper, spacers, beamers and other insulations. Rewinding shall be arranged to ensure free circulation of oil to reduced hot spots in winding. The insulation of coil shall be treated with suitable insulating, varnish or equivalent compound to develop the full electrical strength ofMaking of complete HV & LV leg Alu. Leg coils identical to original one with same number of turns, weight etc providing super enameled/DPC conductor/ Strip confirming to IS 1971 153 in place of old and damage coil. Alu. coil, wire strip will be provided by the department. All coil assembly of identical voltage shall be interchangeable without requiring any special equipment. Shell Coil shall be supported between adjacent sections by insulations (flick Paper) Paper, spacers, beamers and other insulations. Rewinding shall be arranged to ensure free circulation of oil to reduced hot spots in winding. The insulation of coil shall be treated with suitable insulating, varnish or equivalent compound to develop the full electrical strength of
25Assembly of Shell core (Three Limbs) coils and fitting of top and other parts. Replacement of insulation such as press board, craft paper, making support between adjacent section by insulating spacers and wrapping etc. shifting of repaired core coil assembly and placement inside the oven for proper dry out.Assembly of Shell core (Three Limbs) coils and fitting of top and other parts. Replacement of insulation such as press board, craft paper, making support between adjacent section by insulating spacers and wrapping etc. shifting of repaired core coil assembly and placement inside the oven for proper dry out.
26Shifting and keeping the assembled core& coil etc. in OVEN from the repairing hallShifting and keeping the assembled core& coil etc. in OVEN from the repairing hall
27Dragging of transformers tank from the repairing hall to washing area and its complete washing, cleaning, removing of rust and carbon etc.Dragging of transformers tank from the repairing hall to washing area and its complete washing, cleaning, removing of rust and carbon etc.
28Repairing of damaged T/F body/radiator by electric/gas welding complete in all respect for arresting oil leakage.Repairing of damaged T/F body/radiator by electric/gas welding complete in all respect for arresting oil leakage.
29Painting of inner side of T/F tank with heatproof zinc chromatic paints in two coats after providing primer of red oxide paint.Painting of inner side of T/F tank with heatproof zinc chromatic paints in two coats after providing primer of red oxide paint.
30Dragging/shifting out completely dried empty tank after painting to repairing hall.Dragging/shifting out completely dried empty tank after painting to repairing hall.
31Taking out core and coils assembly from the OVEN and shifting to repairing hall.Taking out core and coils assembly from the OVEN and shifting to repairing hall.
32Welding/fixing the top cover after tanking of core and coil assembly into painted tank and tightening of assembly into the tank and fitting all accessories of transformer with help of pneumatic tools and filling of oil, along with bringing oil gauge in working condition for transformers in which oil gauge, cast iron and nut bolts are presentWelding/fixing the top cover after tanking of core and coil assembly into painted tank and tightening of assembly into the tank and fitting all accessories of transformer with help of pneumatic tools and filling of oil, along with bringing oil gauge in working condition for transformers in which oil gauge, cast iron and nut bolts are present
33Spray painting of transformer tank from outside with supper enamel synthetic Grey paint in two coats after providing primer of red oxide paintSpray painting of transformer tank from outside with supper enamel synthetic Grey paint in two coats after providing primer of red oxide paint
34Dragging/shifting of repaired T/F near to the test cabin/testing place and dragging /shifting T/F to yard after testing and its stacking at identified place.Dragging/shifting of repaired T/F near to the test cabin/testing place and dragging /shifting T/F to yard after testing and its stacking at identified place.
35Punching and welding of M.S. plate of 100x50x3mm size on the outside of T/F containing following information. (I) Job number, (II) Capacity (III) Name of workshop (IV) Date of repairPunching and welding of M.S. plate of 100x50x3mm size on the outside of T/F containing following information. (I) Job number, (II) Capacity (III) Name of workshop (IV) Date of repair
36Making of broken delta/Star connection with suitable size of Alu. Ferrule/soldering the joint with suitable brazing rod including all associated work.Making of broken delta/Star connection with suitable size of Alu. Ferrule/soldering the joint with suitable brazing rod including all associated work.
37Making of broken HV/LV lead connection with suitable size of Alu. Ferrule including all associated work.Making of broken HV/LV lead connection with suitable size of Alu. Ferrule including all associated work.

AI Tender Summary

OUR REF NO 56580683
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 1.08 Crore
LAST DATE 05-08-2026
Authority
Authority Name Madhyanchal Vidut Vitran Nigam Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - As Per Atc/Boq; As Per Atc/Boq; As Per Atc/Boq - Handling And Dragging Of Transformer From Stacking Yard To Repairing Hall With Accessories. , Cutting/Opening Of Top Cover Plates & Fitting Of The Transformers, Draining Of Its Oil & Detanking Of Core & Coil Assembly With Help Of Pneumatic Tools. , Dismantling Of Core & Coil Assembly And Cleaning Of Core And Tank (Inside) By Using Warm Old Oil And Hot Air Making It Dirt Free/Sludge Free. , Reconditioning/ Making Of L.V Leg Coils From Reconditioned Strips/New Dpc Strips, Of Same Size And No. Of Turns And Dimensions As Old One. , Reconditioning/Making Of H.V Leg Coils From New Dpc Or Se Wire Of Same Size And No. Of Turns And Dimensions As Old One. , Assembly Of Core, Channel (Duly Painted By Zinc Chromatic Paint) & Coil And Fitting Of Other Parts Requiring Replacements Such As Press Board Making Supports Between Adjacent Section By Insulating Spacers & Tapping Etc. , Shifting And Keeping The Assembled Core& Coil Etc. In Oven From The Repairing Area. , Dragging Of Transformer Tank To Washing Area And Cleaning Of Rust/Dirt Etc From Outer Surface By Using Caustic Soda & Water Solution. , Repairing Of Damaged T/F Body/Radiator By Electric/Gas Welding Complete In All Respect For Arresting Oil Leakage. , Completely Drying & Cleaning Of T/F Tank (Inside And Outside) By Using Hot Air/Cotton Waste/Sand Paper Etc Completely And Making It Ready For Painting , Painting Of Inner Side Of T/F Tank With Heatproof Zinc Chromatic Paints In Two Coats After Providing Primer Of Red Oxide Paint. , Dragging/Shifting Out Empty Tank After Painting To Assembly Area. , Taking Out Core And Coils Assembly From The Oven And Shifting To Repairing Area & Again Tightening The Assembly. , Welding/Fixing The Top Cover After Tanking Of Core And Coil Assembly Into Painted Tank And Tightening Of Assembly Into The Tank And Fitting All Accessories Of Transformer With Help Of Pneumatic Tools And Filling Of Oil, Alongwith Bringing Oil Gauge In Working Condition For Transformers In Which Oil Gauge, Cast Iron And Nut Bolts Are Present , Spray Painting Of Transformer Tank From Outside With Super Enamel Synthetic Grey Paint In Two Coats After Providing Primer Of Red Oxide Paint , Dragging/Shifting Of Repaired T/F Near To The Test Cabin/Testing Place And Dragging /Shifting T/F To Yard After Testing And Its Stacking At Identified Place. , Punching And Welding Of M.S. Plate Of 100X50x3mm Size On The Outside Of T/F Containing Following Information. (I) Unique Number, (Ii) Capacity (Iii) Name Of Workshop (Iv) Date Of Repair , Making Of Broken Delta/Star Connection With Suitable Size Of Alu. Ferrule/Soldering The Joint With Suitable Brazing Rod Including All Associated Work. , Making Of Broken Hv/Lv Lead Connection With Suitable Size Of Alu. Ferrule Including All Associated Work. , Handling And Dragging Of Damaged Transformer From Stacking Yard To Repairing Hall With Accessories , Cutting/Opening Of Top Cover Plates & Fitting Of The Transformers, Draining Of Its Oil & Detanking Of Core & Coil Assembly With Help Of Pneumatic Tools. , Dismantling Of Core & Coil Assembly And Its Cleaning. , Dismantling Of Shell Core And Coil Assembly. Removing Of Hv And Lv Leg Coils For Assessing Its Reuse, Reuse Of Major Insulating Material If Possible, Checking And Recording Of Physical Dimensions Of Coil. , Making Of Complete Hv & Lv Leg Alu. Leg Coils Identical To Original One With Same Number Of Turns, Weight Etc Providing Super Enameled/Dpc Conductor/ Strip Confirming To Is 1971 153 In Place Of Old And Damage Coil. Alu. Coil, Wire Strip Will Be Provided By The Department. All Coil Assembly Of Identical Voltage Shall Be Interchangeable Without Requiring Any Special Equipment. Shell Coil Shall Be Supported Between Adjacent Sections By Insulations (Flick Paper) Paper, Spacers, Beamers And Other Insulations. Rewinding Shall Be Arranged To Ensure Free Circulation Of Oil To Reduced Hot Spots In Winding. The Insulation Of Coil Shall Be Treated With Suitable Insulating, Varnish Or Equivalent Compound To Develop The Full Electrical Strength Of , Assembly Of Shell Core (Three Limbs) Coils And Fitting Of Top And Other Parts. Replacement Of Insulation Such As Press Board, Craft Paper, Making Support Between Adjacent Section By Insulating Spacers And Wrapping Etc. Shifting Of Repaired Core Coil Assembly And Placement Inside The Oven For Proper Dry Out. , Shifting And Keeping The Assembled Core& Coil Etc. In Oven From The Repairing Hall , Dragging Of Transformers Tank From The Repairing Hall To Washing Area And Its Complete Washing, Cleaning, Removing Of Rust And Carbon Etc. , Repairing Of Damaged T/F Body/Radiator By Electric/Gas Welding Complete In All Respect For Arresting Oil Leakage. , Painting Of Inner Side Of T/F Tank With Heatproof Zinc Chromatic Paints In Two Coats After Providing Primer Of Red Oxide Paint. , Dragging/Shifting Out Completely Dried Empty Tank After Painting To Repairing Hall. , Taking Out Core And Coils Assembly From The Oven And Shifting To Repairing Hall. , Welding/Fixing The Top Cover After Tanking Of Core And Coil Assembly Into Painted Tank And Tightening Of Assembly Into The Tank And Fitting All Accessories Of Transformer With Help Of Pneumatic Tools And Filling Of Oil, Along With Bringing Oil Gauge In Working Condition For Transformers In Which Oil Gauge, Cast Iron And Nut Bolts Are Present , Spray Painting Of Transformer Tank From Outside With Supper Enamel Synthetic Grey Paint In Two Coats After Providing Primer Of Red Oxide Paint , Dragging/Shifting Of Repaired T/F Near To The Test Cabin/Testing Place And Dragging /Shifting T/F To Yard After Testing And Its Stacking At Identified Place. , Punching And Welding Of M.S. Plate Of 100X50x3mm Size On The Outside Of T/F Containing Following Information. (I) Job Number, (Ii) Capacity (Iii) Name Of Workshop (Iv) Date Of Repair , Making Of Broken Delta/Star Connection With Suitable Size Of Alu. Ferrule/Soldering The Joint With Suitable Brazing Rod Including All Associated Work. , Making Of Broken Hv/Lv Lead Connection With Suitable Size Of Alu. Ferrule Including All Associated Work.
Basic Detail
Tender No GEM/2026/B/7814650
Bidding Type Tender
Location
City Lucknow
State Uttar Pradesh
Key Dates
Publish Date 21 Jul 2026
Submission Date 05 Aug 2026
Open Date 05 Aug 2026
Finance
Tender Value 1.08 Crore
Tender Fee Ref. Documents
EMD 91800
Exemption Not Available
Document List
25d8f650-bacb-4d25-bb0f-f7408060fd8f.pdf
1784620430.xlsx
1784620482.pdf
1784620484.pdf
doclkm_62545d00-4200-4d04-bed21784620758847_buyer33.mvvnl.up.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 21, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 05, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 13 days
Aug 05, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 13 days

Tender Documents

Download All (ZIP) ↓
pdf

25d8f650-bacb-4d25-bb0f-f7408060fd8f.pdf

xlsx

1784620430.xlsx

pdf

1784620482.pdf

pdf

1784620484.pdf

mvvnl

doclkm_62545d00-4200-4d04-bed21784620758847_buyer33.mvvnl.up.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders