Tender For Power Rearrangement Of 6.6Kv For E-9 Longwall & Belt Circuit In Bottom Seam, Tsus Dismentalling, Transportation And Placing, Cable Rearrangement At Different Locations For Main Substation, Moonidih Colliery ,W.J.Area.
Tender Overview
Project Description
Tender for Power Rearrangement Of 6.6Kv For E-9 Longwall & Belt Circuit In Bottom Seam, Tsus Dismentalling, Transportation And Placing, Cable Rearrangement At Different Locations For Main Substation, Moonidih Colliery ,W.J.Area.
BOQ
| Sl. No. | Item Description |
| 1 | Power rearrangement of 6.6KV for E-9 longwall & belt circuit in bottom seam, TSUs dismentalling, transportation and placing, cable rearrangement at different locations for main substation, Moonidih Colliery ,W.J.Area. |
| 2 | Dismentaling, transportation of 1 no of 500KVA from DR-3 junction to 8 dip junction for maintenance, Manshift required = 10 Manshift(Unskilled) x 2 shift = 20 Manshift@(1437.6) = 20 x 1437.6 = Rs. 28752 for 1 nos or 28752/no |
| 3 | Dismentaling of breaker chamber from 500KVA TSU & assembling it at 8 dip junction. Manshift required = 4 Manshift(Unskilled) x 2 shift = 08 Manshift@(1437.6) = 08 x 1437.6= Rs. 11500.8 for 1 nos or 11500.8/no |
| 4 | Transportation & placing of 1 no of 500KVA from 8 dip junction to 3A junction, Manshift required = 10 Manshift(Unskilled) x 1 shift = 10 Manshift@(1437.6) = 10 x 1437.6 = Rs. 14376.0 for 1 nos or 14376.0/no |
| 5 | Side Dressing for making space for placing 4 nos of 200KVA TSU in 4th rise 4x(5x2.5x2) = 100.00m³ Analysis: For 10 M3 side dressing in coal Manshift required=3 skilled manshift+10Unskilled manshift for mucking , Cost involved 1.00 M3=(3xRs.1510.60+10x1437.60)/10= Rs18907.8/10 M3 =Rs.1890.78/M3 |
| 6 | Dismentaling, transportation, placing & charging of 2 no of 200KVA from E-8 top gate to 4th rise, Manshift required = 8 Manshift(Unskilled) x 5 shift = 40 Manshift@(1437.6) = 40 x 1437.6 = Rs. 57504.00 for 2 nos or 28752/no |
| 7 | Dismentaling, transportation, placing & charging of 2 no of 200KVA from zero level to 4th rise, Manshift required = 8 Manshift(Unskilled) x 5 shift = 40 Manshift@(1437.6) = 40 x 1437.6 = Rs. 57504.00 for 2 nos or 28752/no |
| 8 | Dismantling, Transportation of 75mtr, 95sqmm cable from DR-3 junction to 4th rise bottom seam. Manshift required = 10 Manshift(Unskilled) x 2 shift = 20 Manshift@(1437.6) = 20 x 1437.6 = Rs.28752 for 75mtr nos or 383.36/no |
| 9 | Dismantling, Transportation of 50mtr, 95sqmm cable from DR-3 junction to 3A rise level. Manshift required = 8 Manshift(Unskilled) x 2 shift = 16 Manshift@(1437.6) = 16 x 1437.6 = Rs. 23001.6 for 50mtr or460.03/mtr |
| 10 | Side Dressing for making space for placing 3 nos of 200KVA TSU in gaurakh rise 3x(5x2.5x2) = 75.00m³ Analysis: For 10 M3 side dressing in coal Manshift required=3 skilled manshift+10Unskilled manshift for mucking , Cost involved 1.00 M3=(3xRs.1510.60+10x1437.60)/10= Rs18907.8/10 M3 =Rs.1890.78/M3 |
| 11 | Dismentaling, transportation, placing & charging of 2 no of 200KVA jharkhand TSU in gaurakh rise, Manshift required = 8 Manshift(Unskilled) x 4 shift = 32 Manshift@(1437.6) = 32 x 1437.6 = Rs.46003.2 for 2 nos or 23001.6/no |
| 12 | Dismentaling, transportation, placing & charging of 1 no of 200KVA New hood TSU in gaurakh rise, Manshift required = 8 Manshift(Unskilled) x 2 shift = 16 Manshift@(1437.6) = 16 x 1437.6 = Rs. 23001.6 for 1 nos or 23001.6/no |
| 13 | Transportation of cable loop from jharkhand belt TSU to New Hood belt TSU. Manshift required = 8 Manshift(Unskilled) x 2 shift = 16 Manshift@(1437.6) = 16 x 1437.6 = Rs. 23001.6 for 1 nos or 23001.6/no |
| 14 | Dismentaling, transportation of 1 no of 200KVA from D-15 T/G in 8 dip and placing & charging in 8dip substation, Manshift required = 8 Manshift(Unskilled) x 4 shift = 32 Manshift@(1437.6) = 32 x 1437.6 = Rs. 46003.2 for 1 nos or 46003.2/no |
| 15 | Dismantling, Transportation of 400mtr, 95sqmm cable from 8 dip D-15 to 8dip substation . Manshift required = 10 Manshift(Unskilled) x 4 shift = 40 Manshift@(1437.6) = 40 x 1437.6= Rs. 57504 for 400mtr or 143.76/mtr |
| 16 | Dismentaling, transporatation of 40 nos of light fitting with cable attached from 400MH level and laying, hanging in DR-3 zero level. Man shift required to transport 2 light fitting = 1 Manshift(Unskilled) x 1 shift = 1 Manshift@(1437.6) = 1 x 1437.6 = Rs. 1,437.6 for 2 nos or 718.8/no |
| 17 | Cable rearrangment and hanging of cables from 8 dip assembly station to DR-3 ROK Station. Manshift required = 8 Manshift(Unskilled) x 2 shift = 16 Manshift@(1437.6) = 16 x 1437.6 = Rs. 23001.6 |
| 18 | Cable rearrangment and hanging of cables from DR-3 ROK Station to 4th rise. Manshift required = 6 Manshift(Unskilled) x 5 shift = 30 Manshift@(1437.6) = 30 x 1437.6 = Rs. 43128.00 |
| 19 | Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR |
| 20 | CMPF, Pension and admin. Charge of Employee Un Skilled surface |
| 21 | CMPF, Pension and admin. Charge of Employee Skilled surface |
| 22 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.