Tender For Shifting And Re Erection Of Ht, Lt And Sub Station Due To Widening And Strengthening Of Karatali Pmgsy To Manikapuru From 0/000 Km. To 7/440 Km. (Excluding 3/550 Km. To 6/550 Km.)
Tender Value
12.18 Lakhs
Estimated cost
Bid Submission
31 Jul 2026
0 days left
EMD
12200
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ganjam → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Shifting And Re Erection Of Ht, Lt And Sub Station Due To Widening And Strengthening Of Karatali Pmgsy To Manikapuru From 0/000 Km. To 7/440 Km. (Excluding 3/550 Km. To 6/550 Km.)
BOQ
| Sl. No. | Item Description |
| 1 | PART-A(HT Line)Supply, Fabrication and Installation of 9mtr. Long 330kg. PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 2 | Supply, Fabrication and Installation of 10mtr. Long 330kg. PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 3 | Supply and Installation of RCC Base plate for PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 4 | Supply and Installation of straight Cross Arm Channel(100x50x6mm) 9.56Kg/mtr.each channel length 0.306mtr as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 5 | Supply and Installation of straight Cross Arm Top Channel(100x50x6mm) 9.56Kg/mtr.each channel length 0.306mtr as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 6 | Supply and Installation of fish plate 50x8mm,0.97kg/Mtr for PSC pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 7 | Supply and Installation of Danger Board per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 8 | Supply and Installation of Back clamp for Danger Board, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 9 | Supply and Installation of Anti Climbing device(GI barbed Wire 3kg per Support), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 10 | Supply and Installation of Back clamp for Barbed Anti Climbing device, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 11 | Supply and Installation of 11 kv pin insulator Polymer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 12 | Supply and Installation of 11KV \\"V\\" Cross arm(22Kg) GI as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 13 | Supply and Installation of G.I Back Clamp For 11KV \\"V\\" Cross arm(1.7Kg) each as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 14 | Supply and Installation of top Bracket 100x50x6mm channel GI Channel as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 15 | Supply and Installation of 11KV Disc insulator Insulator Polymer 45KN as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 16 | Supply and Installation of 11KV H/W fitting(B&S type) 45KN as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 17 | Supply and Installation of earthing Device Coil(GI) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 18 | Supply and Installation of 8SWG GI wire 0.131Kg/mtr. 2mtr for concreting pole with coil earthing as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 19 | Supply and Installation of GI Nuts , Bolts and Washer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 20 | Supply and Installation of Stay clamp(1.4KG/Pair), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 21 | Supply and Installation of HT Stay set complete, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 22 | Supply and Installation of Stay insulator, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 23 | Supply and Installation of 7/10 SWG stay wire, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 24 | Supply and Installation of 55mm2 AAA conductor as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 25 | Supply and painting of Black paint as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 26 | Supply and painting of Yellow color paint for Back Ground paint as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 27 | Saundries(Aluminium,Binding tap,insulating tape etc) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 28 | PART-B(Road Crossing)Supply and Installation of 75x40x6mm channel for Straight Cros arm 1.5mtr each 4nos. &0.2mtr. long2Nos. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 29 | Supply and Installation of 10SWG GI wire 0.0.08Kg/mtr. 2mtr for concreting pole with coil earthing as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 30 | Supply and Installation of 8SWG GI wire 0.131Kg/mtr. 2mtr for concreting pole with coil earthing as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 31 | Supply and Installation of 6SWG GI wire 0.182Kg/mtr. 2mtr for concreting pole with coil earthing as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 32 | Supply and Installation of EYE hook as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 33 | Supply and Installation of GI Nuts , Bolts and Washer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 34 | Supply and Installation of 40mm nominal bore GI pipe earthing with 3 mtr. long as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 35 | Supply and Installation of 25x6mm GI Flat earthing (1.2mtr/Kg) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 36 | Saundries(Aluminium,Binding tap,insulating tape etc) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 37 | PART-C(AB Switch)Supply, Fabrication and Installation of 9mtr. Long 330kg. PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 38 | Supply and Installation of Top Pressure GI Channel(100x50x6mm) 3mtr. long [email protected]/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 39 | Supply and Installation of DP Belting Channel (75x40x6mm) GI Channel 4.8mtr. long [email protected]/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 40 | Supply and Installation of Bracing Angle (50x50x6mm) GI Channel 3.512mtr. long [email protected]/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 41 | Supply and Installation of fish plate 50x8mm,0.97kg/Mtr for PSC pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 42 | Supply and Installation of Danger Board per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 43 | Supply and Installation of Back clamp for Danger Board, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 44 | Supply and Installation of Anti Climbing device(GI barbed Wire 3kg per Support), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 45 | Supply and Installation of Back clamp for Barbed Anti Climbing device, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 46 | Supply and Installation of AB Switch Mounting Channel (75x40x4.8mm) 3mtr. long [email protected]/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 47 | Supply and Installation of AB Switch side support Channel (100x50x5mm) 0.35mtr. long [email protected]/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 48 | Supply and Installation of Channel support for Down Pipe (75x40x4.8mm) 0.8mtr [email protected]/mtr. as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 49 | Supply and Installation of 50x6mm GI Flat earthing (1.2mtr/Kg) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 50 | Supply and Installation of 11KV H/W fitting(T&C type) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 51 | Supply and Installation of 11KV Disc insulator Insulator Polymer 45KN as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 52 | Supply and Installation of earthing Device Coil(GI) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 53 | Supply and Installation of 8SWG GI wire 0.131Kg/mtr. 2mtr for concreting pole with coil earthing as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 54 | Supply and Installation of PG clamp for 55mm2 AAA conductor as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 55 | Supply and Installation of GI Nuts , Bolts and Washer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 56 | Supply and Installation of Stay clamp(1.4KG/Pair), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 57 | Supply and Installation of HT Stay set complete, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 58 | Supply and Installation of Stay insulator, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 59 | Supply and Installation of 7/10 SWG stay wire, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 60 | Supply and Installation of Lighting arrester (9KV,10KA) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 61 | Supply and Installation of 11KV AB switch 3pole (400amp), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 62 | Supply and Installation of 11 kv 5KN pin insulator Polymer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 63 | Supply and Installation of GI pipe earthing 40mm dia medium gauge 3mtrs. long as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 64 | Supply and Installation of 55mm2 AAA conductor as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 65 | Supply and painting of Black paint as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 66 | Supply and painting of Yellow color paint for Back Ground paint as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 67 | Saundries(Aluminium,Binding tap,insulating tape etc) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 68 | PART-D(Civil works)Supply and Installation of concrete material for stay anchore plate as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 69 | Supply and Construction of Cement concrete for Support for 9/8mtr PSC Pole with C.c 1:1.5:3 as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 70 | Supply and Construction of couping in ration of C:C 1:1.5:3 as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 71 | Supply and Installation of material for masonary work for earth pit,charcoal,salt etc per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 72 | GIS Services as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 73 | Labour Charges for Dismentalling of HT Pole including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 74 | Labour Charges for Dismentalling of HT line including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 75 | Labour Charges for Dismentalling of AB switch including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 76 | Labour Charges for Dismentalling of Steel structure including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 77 | Labour Charges for Dismentalling of DP psc pole including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 78 | PART-E(LT Line)Supply, Fabrication and Installation of 9mtr. Long 300kg. PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 79 | Supply and Installation of RCC Base plate for PSC Pole as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 80 | Supply and Installation of (4x50+1x50+1x16) mm2 LT XLPE AB Cable as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 81 | Supply and Installation of LT Stay set complete, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 82 | Supply and Installation of Stay insulator, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 83 | Supply and Installation of LT Stay Clamp 1.4Kg/Pair) , as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 84 | Supply and Installation of 7/12 SWG GI stay wire, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 85 | Supply and Installation of suspension clamp with I Hook as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 86 | Supply and Installation of Dead end clamp with I Hook as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 87 | Supply and Installation of Pole clamp for Eye Hook as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 88 | Supply and Installation of insulated piercing connector type-A as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 89 | Supply and Installation of insulated piercing connector type-B as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 90 | Supply and Installation of Danger Board per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 91 | Supply and Installation of Back clamp for Danger Board, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 92 | Supply and Installation of Anti Climbing device(GI barbed Wire 3kg per Support), as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 93 | Supply and Installation of Back clamp for Barbed Anti Climbing device, as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 94 | Supply and Installation of earthing Device Coil(GI) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 95 | Supply and Installation of GI Nuts , Bolts and Washer as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 96 | Saundries(Aluminium,Binding tap,insulating tape etc) as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 97 | PART-F(Civil works)Supply and Installation of concrete material for stay anchore plate as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 98 | Supply and Construction of Cement concrete for Support for 9/8mtr PSC Pole with C.c 1:1.5:3 as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 99 | Supply and Construction of couping in ration of C:C 1:1.5:3 as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 100 | GIS Services as per RE Specification including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 101 | Labour Charges for Dismentalling of LT Pole including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. |
| 102 | Labour Charges for Dismentalling of LT line including cost of all material, labour, labourcess, T&P, taxes, conveyances etc. Complete required for the work as per direction of the Engineer-in-charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 21, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedJul 31, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
TodayAug 01, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender