Tender For Works Contract For Execution Of 1) Improvement Estimate For Strengthening Of Conductor In Lt Line Single Phase 2 Wire Acsr 7/2.59 Change Into Three Phase 4Wire Aaac 7/3.15 And Replacement Of Deteriorated 4 Nos 9.14M Reinforced Cement Concr
Tender Overview
Project Description
Tender for Works Contract For Execution Of 1) Improvement Estimate For Strengthening Of Conductor In Lt Line Single Phase 2 Wire Acsr 7/2.59 Change Into Three Phase 4Wire Aaac 7/3.15 And Replacement Of Deteriorated 4 Nos 9.14M Reinforced Cement Concrete Pole 2Nos 9M Psc Pole And 3Nos 8M Psc Pole At Loc F1/1,2,3,4,5,7,8,26,29,30 And Insertion 2Nos 8M Psc Pole In Thumbali As Per The Petition Received By The Thiru.J.John Bosco On 17.09.2025 Ungaludan Stalin C Under Pkd Sec, 2)Estimate For Ground Clearence By Replacement Of 6Nos 8Mtr Psc Pole Into 9M Psc Pole At Kanjikuzhi Ss 25Kva Loc No F/1 To Fi/6 Under Palliyadi Sec, 3)Improvement Est For Replacement Of Deteriorated 2Nos Reinforced Cement Concrete Double Poles Abs And Abs Materials Of Poothurai Ground Abs In 11Kv Under Namboly Sec, 4)Improvement Est For Replace Deteriorated Structure Of Location Manal Ssi/100Kva In 11Kv Thengapattanam Feeder Under Killiyoor Sec, 5)Improvement Est For Replace Of Deteriorated Structure Materials At Erayumenthurai Church Under Namboly Sec, 6)Dcw Estimate For 1No Insertion Rsj Pole As Per Requestof The Commissioner Ward 10 Vilavancode Govt Primary School Under Kuzhithurai Sec Under C&I Puthukadai Section.
BOQ
| Sl. No. | Item Description |
| 1 | Loading & unloading of 9 m PSC, squre and RSJ pole |
| 2 | Transporting of 9m PSC, Squre and RSJ pole from Road side to pole pit up to 2 KM |
| 3 | Excavation of pole pit in Rocky ground 9.14 Rcc 9 m psc and Rsj up to 36' pole |
| 4 | Erection of 9 m PSC pole |
| 5 | Loading & unloading of 8 m PSC and RCC pole |
| 6 | Transporting of 8m PSC and Squre pole from Road side to pole pit up to 2 KM |
| 7 | Excavation of pole pit in Rocky ground 8 m PSC and RCC pole |
| 8 | Erection of 8 m PSC pole |
| 9 | Fixing of Lt 3Q X arm |
| 10 | Fixing of 3.5, 4.5 V X arm & 5.5 TapChannel X arm |
| 11 | Dismantling & Re-Fix of 3Q Xarm |
| 12 | Dismantling & Re-Fix of SQ X arm |
| 13 | Dismantling & Re-Fixing of 3.5, 4.5 V X arm & 5.5 Tap Channel X arm |
| 14 | Dismantling & Re-Fixing of Gaurding X arm |
| 15 | Dismantling & Re Fixing of HT/LT 'TI' Fittings |
| 16 | Fixing of HT Pin Insulater |
| 17 | Fixing of LT Pin Insulater |
| 18 | Dismantling & Re Fixing of HT Pin Insulater |
| 19 | Dismantling & Re Fixing of LT Pin Insulater |
| 20 | Dismantling & Re Fixing of HT Disc Insulater |
| 21 | Dismantling & Re Fixing of LT shackle |
| 22 | Dismantling & Re Fixing of Aluminium knob |
| 23 | Dis & Redoing of S phase connection |
| 24 | Dis & Redoing of 3 phase connection |
| 25 | Dismantiling Re-Erection of 1*40 W tube light complete set |
| 26 | Excavation of stay pit on rocky ground and erection of stay set |
| 27 | Stringing of HT line 7/4.09 ACSR mm pin point |
| 28 | Stringing of HT line 7/4.09 ACSR mm cut point |
| 29 | Stringing of LT line 7/2.50 AAAC or 7/2.59 ACSR pin point |
| 30 | Stringing of LT line 7/3.15 AAAC or 7/3.35 ACSR pin point |
| 31 | Stringing of LT line7/3.15 AAAC or 7/3.35 ACSR cut point |
| 32 | Dismantling & re Stringing of HT line 7/3.15 AAAC or 7/3.35 ACSR pin point |
| 33 | Dismantling & re Stringing of Ht line 7/3.15 AAAC or 7/3.35 ACSR cut point |
| 34 | Dismantling & re Stringing of Ht line 7/4.09 ACSR mm cut point |
| 35 | Dismantling & re Stringing of Lt line 7/2.50 AAAC or 7/2.59 ACSR pin point |
| 36 | Dismantling & re Stringing of Lt line 7/2.50 AAAC or 7/2.59 ACSR cut point |
| 37 | Dismantling & re Stringing of Lt line 7/3.15 AAAC or 7/3.35 ACSR pin point |
| 38 | Dismantling & re Stringing of Lt line7/3.15 AAAC or 7/3.35 ACSR cut point |
| 39 | Erection of Structure set complete 2nos pole erection normel grond including Bed Channel, Belting Angle, AB switch,H.G. Fuse, Feeder arrangements with open type fuse unit for 2 feeders,HT-LAS ,LT-LAS ,, LT Bus arrangement, Danger board, Structure earthing complete with 4 nos pit earth loops |
| 40 | Dismantling and re-Erection of Distribution Transformer Above 25 KVA to 200KVA |
| 41 | Erection of DP structure with stay asper TNEB std including fixing of Top channel,cross bracing, painting,colour washing etc with11 KV ABS using all type of poles |
| 42 | Loading & unloading of line materials |
| 43 | Transporting line materials from substore to section office and office to work spot up to 20 km |
| 44 | Drilling / Less than 23mm holes per hole / Slatted holes of slotted holes |
| 45 | OrdinaryTree Clearance |
| 46 | Coconut Tree Clearance Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender