Auction Sale Of Allocation No. Drf 21213304.On As Is Where Is Basis. Iron And Steel Cut-Up Parts Of Condemned Emu Tr. Coaches Body Along With Bogies Bearing Nos. [1]Er/018075/Hwh/Ysd, Type. -D. [2] Er/152015/Hwh/ Ys, Type. -C. [3] Er/532009/Hwh/Ys, T
Tender Overview
Project Description
Auction Sale Of Allocation No. Drf 21213304.On As Is Where Is Basis. Iron And Steel Cut-Up Parts Of Condemned Emu Tr. Coaches Body Along With Bogies Bearing Nos. [1]Er/018075/Hwh/Ysd, Type. -D. [2] Er/152015/Hwh/ Ys, Type. -C. [3] Er/532009/Hwh/Ys, Type. -C. Total Qty. - 03 Nos. Location. -Lying At C&W Complex/Kpa. To Be Sold Along With Bogies But Without Excluded Fittings. Excluded Fittings Are 04 Nos. Wheel Sets [Per Coach] With Its Fittings And Non-Ferrous Attachment If Any Are Excluded From Sale And Will Be Returned To The Custodians As Per Extent Procedure. Saleable Items For The Emu Tr. Coaches Including Cut Up Parts Of Coach Body With The Un-Serviceable Items, Ferrous-Iron, Nonferrous/ Other Items I.E. Aluminium Window Guide Frame- [Approx 29.25 Kg For Coach Sl-03 & Nil For Sl-01 & 02], Aluminium In Dirt Collector - [Approx 0.1 Kg For Each], Aluminium Cheqd. Sheet - [Approx 234.6 Kg For Coach Sl-01], Bronze- [Approx. 0.6Kg For Each Coach]. Copper Cable- [Approx 62.59 Kg For Each Coach], Rubber- [ Approx 75.86 Kg. For Each Coach], Ss Trough Floor- [ Approx 960Kg. For Each Coach], Ss Moon Rock [Approx. 46.76 Kg For Sl-01], Fiber & Glass- [Approx 474.9 Kg For Coach Sl-01 & Sl-02 Each And 443.65 Kg For Coach Sl-03], Wood- [ Approx 1676.7 Kg. For Coach Sl-02 & 03 Each And 1570.92 Kg For Coach Sl-01] Etc. Which Are Also Unserviceable And Non-Returnable. Condition- [1] After Sale, Coaches Will Be Handed Over To The Purchaser For Dismantling And Cutting At C&W Extension Yard/Kpa. [2] Cutting And Dismantling Of The Above Coaches Are To Be Made At C&W Extension Yard/Kpa By Purchasers Own Arrangement After Ensuring Sufficient Safety Measures Against Fire Hazards. [3] The Returnable Items Of Above Coaches Will Be Returned To The Respective Shops Of Kanchrapara Workshop By The Purchaser¿S Own Arrangement Before Completion Of Delivery.
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender