Bids Are invited for Operation And Maintenance Power House / Power Plant - 945645 - O/H 15.75Kv Bus Duct Inside T.G.Hall , O/H H2 Gas Purging & Re-Charging , O/H Generator P.T. Cubicle/Lavt , O/H Ngr And Earthing Transformer , Preventive Main. Of Ac/
Tender Overview
Project Description
Bids Are invited for Operation And Maintenance Power House / Power Plant - 945645 - O/H 15.75Kv Bus Duct Inside T.G.Hall , O/H H2 Gas Purging & Re-Charging , O/H Generator P.T. Cubicle/Lavt , O/H Ngr And Earthing Transformer , Preventive Main. Of Ac/Dc Seai Oil Pumps , Preventive Main. & Oil Leakage-Ac/Dc Sop , Preventive Main. Greasing Of Bearing-Sop , Reconditioning 6No 15.75Kv Bus Container , Monitoring Level Of Hydraulic Seal Oil Tank , Normalizing Seal Oil &Draining Oil Gen. , Repair Of Cooling Pipe Circuit Of Ac Sop , Repairing/Fabrication Of Ladder , Repairing Of Fencing Around Et And Ngr. , Repairing Of Fencing Around 15.75Kvduct , Isolation 15.75Kv Duct Tg From Manhole , Preventive Maintenance Of Slip Ring Brush , Bus Separation From Gen. Phases, Neutral , Work On Seal Oil/ Stator Water Cooler , H2 Gas Filling In Gen Casing , Changing Excitation Polarity In 5X200mw , Rmvl/Rmtng Old Pt With New Pt , Replacement Of Drainpipes Of H2 Gas Cooler , Fabrication Of Pipe Welding Etc. , Arrange Drain Expansion Tank 210Mw Gen , Replace Rubber Bellows Ipbd 1000Mm , Attend Leakage Dm Water Line Sw Sys , Replacement Of Gaskets Of Gas,Oil Line. , Structural Fabrication. , Repairing Leakage Of 450 Mm Pipeline , Painting Bus Duct Turbine Hall , Painting Work In Ngt & Ngr , Painting Work In Lavt/ Pt Cubical Box , O/H U11-Painting Of Generator Stator , Painting Of Gen Aux (Seal Oil & Scw Sys) , Rmvl/Rmtng Old Ctwid New Ct
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | O/H 15.75KV Bus duct inside T.G.hall | O/H 15.75KV Bus duct inside T.G.hall |
| 2 | O/H H2 gas purging & re-charging | O/H H2 gas purging & re-charging |
| 3 | O/H Generator P.T. cubicle/LAVT | O/H Generator P.T. cubicle/LAVT |
| 4 | O/H NGR and Earthing Transformer | O/H NGR and Earthing Transformer |
| 5 | Preventive Main. Of AC/DC seai oil pumps | Preventive Main. Of AC/DC seai oil pumps |
| 6 | Preventive Main. & Oil leakage-AC/DC SOP | Preventive Main. & Oil leakage-AC/DC SOP |
| 7 | Preventive Main. greasing of bearing-SOP | Preventive Main. greasing of bearing-SOP |
| 8 | Reconditioning 6no 15.75KV bus container | Reconditioning 6no 15.75KV bus container |
| 9 | Monitoring level of Hydraulic Seal Oil Tank | Monitoring level of Hydraulic Seal Oil Tank |
| 10 | Normalizing seal oil &draining oil Gen. | Normalizing seal oil &draining oil Gen. |
| 11 | Repair of cooling pipe circuit of AC SOP | Repair of cooling pipe circuit of AC SOP |
| 12 | Repairing/Fabrication of ladder | Repairing/Fabrication of ladder |
| 13 | Repairing of fencing around ET and NGR. | Repairing of fencing around ET and NGR. |
| 14 | Repairing of fencing around 15.75KVduct | Repairing of fencing around 15.75KVduct |
| 15 | Isolation 15.75KV duct TG from manhole | Isolation 15.75KV duct TG from manhole |
| 16 | Preventive maintenance of Slip Ring brush | Preventive maintenance of Slip Ring brush |
| 17 | Bus separation from Gen. phases, neutral | Bus separation from Gen. phases, neutral |
| 18 | Work on seal Oil/ Stator water cooler | Work on seal Oil/ Stator water cooler |
| 19 | H2 Gas filling in Gen casing | H2 Gas filling in Gen casing |
| 20 | Changing excitation polarity in 5x200MW | Changing excitation polarity in 5x200MW |
| 21 | RMVL/RMTNG OLD PT WITH NEW PT | RMVL/RMTNG OLD PT WITH NEW PT |
| 22 | Replacement of drainpipes of H2 gas cooler | Replacement of drainpipes of H2 gas cooler |
| 23 | Fabrication of pipe welding etc. | Fabrication of pipe welding etc. |
| 24 | ARRANGE DRAIN EXPANSION TANK 210MW GEN | ARRANGE DRAIN EXPANSION TANK 210MW GEN |
| 25 | REPLACE RUBBER BELLOWS IPBD 1000MM | REPLACE RUBBER BELLOWS IPBD 1000MM |
| 26 | ATTEND LEAKAGE DM WATER LINE SW SYS | ATTEND LEAKAGE DM WATER LINE SW SYS |
| 27 | Replacement of gaskets of Gas,Oil line. | Replacement of gaskets of Gas,Oil line. |
| 28 | Structural Fabrication. | Structural Fabrication. |
| 29 | Repairing leakage of 450 mm Pipeline | Repairing leakage of 450 mm Pipeline |
| 30 | Painting Bus duct turbine hall | Painting Bus duct turbine hall |
| 31 | Painting work in NGT & NGR | Painting work in NGT & NGR |
| 32 | Painting work in LAVT/ PT cubical box | Painting work in LAVT/ PT cubical box |
| 33 | O/H U11-Painting of Generator stator | O/H U11-Painting of Generator stator |
| 34 | Painting of Gen aux (seal oil & SCW sys) | Painting of Gen aux (seal oil & SCW sys) |
| 35 | Rmvl/Rmtng Old CTwid new CT | Rmvl/Rmtng Old CTwid new CT |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysBid Opening Date
Technical bids will be opened and evaluated.