Tender For Construction Of Path Work Near Peer Baba At W. No. 02, Pyt Bilaspur, Block Khoon (Rs. 1.00 Lac) & Construction Of Path Work & Lane At W. No. 03, Pyt. Bilaspur, Block Khoon (1.00 Lac) Under Pri Capex For The Year 2026-27
Tender Overview
Project Description
Tender for Construction Of Path Work Near Peer Baba At W. No. 02, Pyt Bilaspur, Block Khoon (Rs. 1.00 Lac) & Construction Of Path Work & Lane At W. No. 03, Pyt. Bilaspur, Block Khoon (1.00 Lac) Under Pri Capex For The Year 2026-27
BOQ
| Sl. No. | Item Description |
| 1 | A (P/work near Peer Baba at W. No. 02) Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.100 % Qty. in A.K.S |
| 2 | Providing and laying in position 1:5:10 mix stone agg. Of 40mm n/size. |
| 3 | Random rubble masonry with hard stone in walls in 1:6 mix. |
| 4 | P/L in postion DPC 50mm thick with curing complete. |
| 5 | Carriage of sand and aggregate. |
| 6 | Carriage of stones. |
| 7 | Add CIB in all respects |
| 8 | B (P/work & lane at W. No. 03) Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : |
| 9 | Earh Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.100% in All kinds of soil. (in-stretches). |
| 10 | Providing and lying in position 1:5:10 mix graded crushed stone aggregates 40mm size.excluding the cost of centring and shuttering all work upto plinth Level (in-stretches) |
| 11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 MIX. (In-stretches) |
| 12 | Cetring and shuttering including strutting, propping etc and removal of the formwork. |
| 13 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. (In-stretches) |
| 14 | Random rubble masonry with hard stone in walls in 1:6 mix. |
| 15 | P/L in postion DPC 50mm thick with curing complete. |
| 16 | Carriage of sand |
| 17 | Carriage of aggregate |
| 18 | Carriage of stones. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender