Tender For Erection Of Infrastructure Of Deposit/Nd/Sstd/O&M Scheme.
Tender Overview
Project Description
Tender For Erection Of Infrastructure Of Deposit/Nd/Sstd/O&M Scheme. Earthing Arrangement For 11/0.4 Kv 5/S-Back Filling Of Earth Pit Fixing Of 11 Kv Fin Insulator 11 Kv Single Pole Cut Point Fitting 100X50X6 Mm Channel Fixing Of 11 Kv V-Cross Arm With Top Clamp Fixing Of 11 Kv V-Cross Arm With Tap Clamp Fixing Of D. C.Cross Arm & Centre Along With Plates, & Nos. H/Ws, Nos. Dators And Fising Of Supporting Clamps On Both The Poirs. Fixing Of D. C.Cross Arm 4 Centre Along With Plates, & Nos. H/Ws, & Nes. Disc Insulators And Fixing Of Supporting Clamps On Both The Pales Fising Of D.O.Channel With Support Clamp/Back Clamp Fixing Of D.O.Fuse Unit 11 Kv (Set Of 3 No.1 Fixing Of Disc Insulator With H/W 11 Kv Side Fixing Of L. A. Unit 11Kv With Earthing (Set Of 3 No.) Fixing Of Transformer Structere Handling & Installation Of 16/25 Kva Dist. Box On Dp, Complete Wiring, Connecting Lt Cable On Bushing And Lt Feeders (2 Nos.) Handling & Installation Of 25 Kva Distribution Transformer (Dta) On Dp, Tightening With Turn Backles An Both Sides, Oples Clamping And Boting Of Bese Jumpering On Ht Side Handling & Installation Of 63 Kva Dist. Box On Dp, Complete Wiring, Connecting Lt Cable On Bushing And Lt Feeders (2 Nos.) Handling & Installation Of 63 Kva Distribution Transformer (Otr) On Dp, Tightening With Turn Buckles On Both Sides, Oples Clamping And Hoting Of Base Jumpering On Ht Side Handling & Installation Of 100 Kva Dist. Boe On Dp, Complete Wiring, Connecting Lt Cable On Bushing And Lt Feeders (2. Nos.) Handling & Installation Of 100 Kva Distribution Transformer (Dtk) In Dp, Tightening With Turn Buckles On Both Sides, Oples Clamping And Boting Of Base Jumpering On Ht Side Jumpering Work At D. P. And Transformer Fixing Of L. T. Cable At 11/4 Kv S/S (Main & Upto 2 Ckt) Pole Erection Complete With Earthing Pole Erection Complete With Earthing Pcc Pole 140 Kg 8 Mtr With Back Filling Of Boulder Normal Sol Pole Erection Complete With Carthing Pole Erection Complete With Earthing Pcc Pole 140 Kg 8 Mtr With Back Filling Of Boulder Soft Rock/Hard Soll Stay Set 16 Mm. Complete Erection Including Pit Digging, Hinding Of Stay Wire At Eye Bolt, Stay Insulator And Anchor Rod & Tigtning On Pale (Normal Soil Stay Set 16 Mm. Complete Erection Including Pit Digging, Binding Of Stay Wire At Eye Bolt, Stay Insulator And Anchor Rod & Tigtning On Pole Soft Rock/Hard Soil) Stringing Of Conductor-11 Kv Line With Rabbit Conductor (1 No. Conductor) Survey 11 Kv Line
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Offline submission at the designated office.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender