Tender For Erection Of Infrastructure Of Deposit/Nd/Sstd/O&M Scheme.
Tender Overview
Project Description
Tender For Erection Of Infrastructure Of Deposit/Nd/Sstd/O&M Scheme. Earthing Arrangement For 11/0.4 Kv5/S-Back Filling Of Earth Pit Fixing Of 11 Kv Pin Besulator 11 Kv Single Pole Cut Point Fitting 100X50 Mm Channel Fixing Of 11 Kv V-Cross Arm With Top Clamp Raing Of 13 Kv V-Cross Arm With Top Lamp Fixing Of D. C.Cross Arm Centre Along With Plates, & Nos. H/W, 6 Nas. Disc Inulators And Fixing Of Supporting Clamps On Both The Poles Fixing Of D. C.Cross Arm 4 Centre Along With Plates, 6 Nos. H/W, 6 Nos. Disc Imulators And Fixing Of Supporting Clamps On Both The Poles Fixing Of D.0.Channel With Support Claimp/Hack Clamp Fising Of D.O. Fuse Unit 11 Kv (Set Of 3 No.) Fixing Of Disc Insulator With H/W 11 Kv Side Fixing Of L. A. Unit 11Kv With Earthing (Set Of 3 No. Fixing Of Transformer Structere Handling & Installation Of 16/25 Kva Dist. Bux On Dp, Complete Wiring, Connecting Lt Cable On Bushing And Lt Fenders (2 Nos.) Handling & Installation Of 25 Kva Distribution Tramformer (Dtr) On Dp, Tightening With Turn Huckles On Both Sides, Oples Clamping Anil Boting Of Bese Jumpering On Ht Side Handling & Installation Of 63 Kva Dist. Bos On Dp, Complete Wiring, Connecting Lt Cable On Bushing And Lt Feeders (2 Nos. Handling & Installation Of 6 Kva Distribution Transformer (Dtk) On Dp, Tightening With Turn Buckles On Both Sides, Oples Clamping And Boting Of Hase Jumpering On Ht Side Handling & Installation Of 100 Kva Dist. Bex On Dp, Complete Wiring, Connecting Lt Cable On Bushing And Lt Feeders (2 Nos.) Handling & Installation Of 100 Kva Distribution Transformer (Dtb) On Op, Tightening With Turn Buckles On Both Sides, Oples Clamping And Boting Of Base Jumpering On Ht Side Jumpering Work At D. P. And Transformer Fixing Of L. T. Cable At 11/4 Kv 5/S (Main & Upto 2 Ckt) Pole Erection.Complete With Earthing Pole Erection Complete With Earthing Pcc Pole 140 Kg Mtr With Back Filling Of Boulder (Normal Sui Pole Erection Complete With Earthing Pole Erection Complete With Earthing Pcc Pole 140 Kg Mtr With Back Filling Of Boulder (Soft Rock/Hard Soll Stay Set 16 Mm. Complete Erection Including Pit Digging, Binding Of Stay Wire At Eye Holt, Stay Insulator And Anchor Rod & Tigtning On Pole (Normal Soil) Stay Set 16 Mm. Complete Erection Including Pit Digging, Binding Of Stay Wire At Een Bolt, Stay Insulator And Anchor Rod & Tigtning On Pole Soft Rock/Hard Soil) Stringing Of Conductor-11 Kv Une With Rabbit Conductor (1 No. Conductor)
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Offline submission at the designated office.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender