Tender For Erection Of Infrastructure Of Deposit/Nd/Sstd/O&M Scheme.
Tender Overview
Project Description
Tender For Erection Of Infrastructure Of Deposit/Nd/Sstd/O&M Scheme. Earthing Arrangement For 11/0.4 Kv S/S-Back Filling Of Earth Pit Fising Of 11 Kv Pin Insulator 11 Kv Single Pole Cut Point Fitting 100X50X6 Min Channel Fixing Of 11 Kv V-Cross Arm With Tap Clamp Fising Of 11 Kv V-Cross Arm With Top Clamp Fixing Of D. C.Cross Arm 8 Centre Along With Plates, & Nos. H/W 6 Nos. Disc Insulators And Fixing Of Supporting Clamps On Both The Poles. Fixing Of D. C.Cross Arm 4 Centre Along With Plates, & Nos. H/Ws, & Nas. Disc Insulators And Fixing Of Svwrorting Clames On Both The Pois. Flaing Of D.O.Channel With Support Clamp/Back Clamp Fising Of D.D. Fuse Unit 11 Kv (Set Of 3 No.) Fising Of Disc Inulator With H/W 11 Kv Side Fising Of L. A. Unit 11Kv With Earthing (Set Of 3 No.) Fixing Of Transformer Structere Handling & Installation Of 16/25 Kva Dist. Bos On Dp, Complete Wiring, Connecting Lt Cable On Bushing And Lt Feeders (2 Not) Handling & Installation Of 25 Kva Distribution Transformer (Dtk) On Dp, Tightening With Torn Buckles On Both Sides, Oples Clamping And Boting Of Base Jumpering On Ht Side Handling & Installation Of 63 Kva Dist. Box On Dp, Complete Wiring, Connecting Lt Sable On Bushing And Lt Feeders (2. Nas.) Handling & Installation Of 63 Kva Distribution Transformer (078) On Dp, Tightening With Turm Buckles On Both Sides, Oples Clamping And Beting Of Hase Jumpering On Ht Side Mandling & Installation Of 100 Kva Dist. Box On Dp, Complete Wiring, Connecting Lt Cable On Bushing And Lt Feeders (2 Nos.) Handling & Installation Of 100 Kva Distribution Transformer (Dtr) On Dp, Tightening With Turn Buckles On Both Sides, Oples Clamping And Boting Of Base Jumpering On Ht Side Jumpering Work At D. P. And Transformer Fixing Of L. T. Cable At 11/4 Kvs/S (Main & Upto 2 Ckt) Pole Erection Complete With Earthing Pole Erection Complete With Earthing Pcc Pole 140 Kg 8 Mtr With Back Filling Of Boulder Normal Soll Pale Erection Complete With Earthing Pole Erection Complete With Earthing Pcc Pole 140 Kg 8 Mtr With Back Filling Of Boulder (Soft Rock/Hard Soll Stay Set 15 Num. Complete Erection Including Pit Digging, Binding Of Stay Wire At Eye Bolt, Stay Insulator And Anchor Rod & Tigtning On Pole (Nortal Soil) Stay Set 16 Mm. Complete Erection Including Pit Digging, Binding Of Stay Wire At Eye Bolt, Stay Insulator And Anchor Rod & Tiptning On Polel Soft Rock/Hard Soil) Strinrine Of Conductor 11 Kv Lime With Rabbit Conductor (1 No. Conductor
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Offline submission at the designated office.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender