Tender For Erection Of Infrastructure Of Deposit/Nd/Sstd/O&M Scheme.
Tender Overview
Project Description
Tender For Erection Of Infrastructure Of Deposit/Nd/Sstd/O&M Scheme. Earthing Arrangement For 11/0.4 Ev 5/S-Back Filling Of Earth Pit Fixing Of 11 Kv Pin Insulator 11 Xv Single Pole Cut Point Fitting 100X50X6 Mm Chanel Fixing Of 11 Kv V-Cross Arm With Top Clamp Flaing Of 11 Rv V-Cross Arm With Top-Clamp Fixing Of D. C.Cross Arm 8 Centre Along With Plates, & Nos. H/Ws. 6 Nos. Dies Insulators And Foxing Of Supporting Clamps On Both The Poles, Fixing Of D. C.Cross Arm & Centre Along With Pilates, & Nos. H/Ws. 6 Nas. Disc Insulators And Fixing Of Supporting Clamps On Both The Poles Raing Of D.D.Channel With Support Clamp/Back Clamp Fixing Of D.O.Fuse Unit 11 Kv Set Of 3 No.) Fixing Of Disc Insulator With Hw 11 Kv Side Fixing Of L. A. Unit 11Kv With Earthing (Set Of 1 No.) Fising Of Transformer Structere Handling & Intallation Of 16/25 Kva Dist. Bax On Dp, Complete Wiring, Connecting Lt Cable On Bushing And Lt Feeders (2 Nos.) Handling & Installation Of 25 Kva Distribution Transformer (Otr) On Dp, Tightening With Tarn Buckles On Both Sides, Aples Clamping And Boting Of Base Jumpering On Ht Side Handling & Installation Of 63 Kva Dist. Box On Dp, Complete Wiring, Connecting Lt Cable On Bushing And Lt Feeders (2 Nos.) Handling & Installation Of 63 Kva Distribution Transformer (Dtr) On Dp, Tightening With Turn Buckles On Both Sides, Oples Clamping And Boting Of Have Jumpering On Ht Side Handling & Installation Of 100 Kva Dist. Box On Dp, Complete Wiring, Connecting Lt Cable On Brushing And Lt Fenders 12 Nos Handling & Iristallation Of 100 Kva Distribution Transformer (Otr) On Dp, Tightening With Turn Buckles On Both Sides, Aples Clamping And Boting Of Base Jumpering On Ht Side Jumpering Work At D. P. And Transformer Fixing Of L. T. Cable At 11/4 Kv 5/S / Main & Upto 2 Ckt) Pole Erection Complete With Earthing Pole Erection Complete With Earthing Pcc Pole 140 Kg & Mtr With Back Filling Of Boulder I Normal Soil) Pole Erection Complete With Earthing Pole Erection Complete With Earthing Ipcc Pole 140 Kg Mtr With Back Filling Of Boulder Soft Rock/Hard Soll) Stay Set 16 Mm. Complete Erection Including Pit Digging, Binding Of Stay Wire At Eye Bolt, Stay Insulator
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Offline submission at the designated office.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender