Tender For Restoration Of Rain Damages Of Lwss Raktal Tullah In Tehsil Lad Bharol Distt Mandi (Hp)(Sh: - Repair/ Rewinding Of 7.5 Hp Submersible Pump Motor And Providing, Laying , Jointing And Testing Of 80 Mm Dia Gi Pipe Set No. 1 & 2 ).
Tender Overview
Project Description
Tender for Restoration Of Rain Damages Of Lwss Raktal Tullah In Tehsil Lad Bharol Distt Mandi (Hp)(Sh: - Repair/ Rewinding Of 7.5 Hp Submersible Pump Motor And Providing, Laying , Jointing And Testing Of 80 Mm Dia Gi Pipe Set No. 1 & 2 ).
BOQ
| Sl. No. | Item Description |
| 1 | Pump Set ( Set No 1)Providing and fixing of new impeller of pump set with all fitting for damaged portion finishing to the accurate sizes complete in all respect as per the satisfaction of Engineer in charge |
| 2 | Repair of 7.5 HP Submersible motor. Rewinding of motor 7.50 HP submersible motor with PVC insulated copper wiring wooden wedges insulation sheet sleeves, solder, insulated type and all the other items at the time of rewinding complete in all repect and to the entire satisfaction of the Engineer-in-Charge in all leads and lifts. |
| 3 | Repair and alignment of rotor shaft as per filling of welding and turning to the accurate size with repair old slots of wedges complete in all respect as per the satisfaction of Engineer in charge. |
| 4 | Providing and fixing of gum metal bush for rotor shaft complete job with turning and finishing of bushers to the accurate size of rotor in all respect as per the satisfaction of Engineer in charge. |
| 5 | Providing and fixing of steel rubber seal in all respect as per the satisfaction of Engineer in charge. |
| 6 | Pump motor connection.Providing and fixing of water proof cable 3 core , 4 sqmm as per IS-674- Part-II- 1964 suitable for above pumpset from starter to pump set subject to the approval of HPSEB authority complete in all respect as per the satisfaction of Engineer in charge. |
| 7 | In the bore well motor & pumpo lifting by using 6 man power and after repair set in there original position complete as per the satisfaction of engineer in charge. |
| 8 | Pump Set ( Set No 2)Providing and fixing of new PVC impeller of pump set with in all fittings for damaged portion finishing to the accurate sizes with in all leads and lifts as per the direction of Engineer in charge. |
| 9 | Repair of 7.5 HP Submersible motor.Rewinding of motor 7.50 HP submersible motor with PVC insulated copper wiring wooden wedges insulation sheet sleeves, solder, insulated type and all the other items at the time of rewinding complete in all repect and to the entire satisfaction of the Engineer-in-Charge in all leads and lifts. |
| 10 | Repair and alignment of rotor shaft as per filling of welding and turning to the accurate size with repair old slots of wedges complete in all respect as per the satisfaction of Engineer in charge. |
| 11 | Providing and fixing of gum metal bush for rotor shaft complete job with turning and finishing of bushers to the accurate size of rotor in all respect as per the satisfaction of Engineer in charge. |
| 12 | Providing and fixing of steel rubber seal in all respect as per the satisfaction of Engineer in charge. |
| 13 | Pump motor connections.Providing and fixing of water proof cable 3 core , 4 sqmm as per IS-674- Part-II- 1964 suitable for above pumpset from starter to pump set subject to the approval of HPSEB authority complete in all respect as per the satisfaction of Engineer in charge. |
| 14 | Providing and fixing high steel carbon rope way 40 mm for holding of submersible pump set with in all and lifts as per the direction of Engineer in charge. |
| 15 | In the bore well motor & pumpo lifting by using 6 man power and after repair set in there original position complete as per the satisfaction of engineer in charge. |
| 16 | Carriage of motor pump from a work site to a workshop for dismentling, reapir and subsquent reinstallation at the site, all as per the direction and satisfaction of Engineer in charge. |
| 17 | Excavation in foundation and trenches in earth work,lifts up to 1.50 meters atacking the excavated soil not more than 3 meters clear from the edge of the excavation and then returning the stacking soil in 15cm .layers, when required in to plinths sides of foundations etc, consolidating each deposted layer by ramming and watering and then deposing of all surplus excavated earth as directed with in a lead of 20 metres in all respect with in all leads and lifts as per the direction of Engineer-in-Charge. |
| 18 | Laying, jointing and testing in trenches to be levelled to grades , IS marked GI flanged pipes of dia as per the direction of Engineer in charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender