Tender For Construction Work Of cement concrete Road And Drain From P.S Maheshwari To Amit And Abhay Agrawal To Kapil Agrawal To Vishnu Bal Sadan School And Mukesh To Shiv Mandir In Jatav Pura Ward 02

Issued by Local Bodies · Bareilly, Uttar Pradesh
Tender Value
42.22 Lakhs
Estimated cost
Bid Submission
27 Jul 2026
0 days left
EMD
84440
Bank guarantee accepted
Document Fee
4956
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bareilly → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Work Of cement concrete Road And Drain From P.S Maheshwari To Amit And Abhay Agrawal To Kapil Agrawal To Vishnu Bal Sadan School And Mukesh To Shiv Mandir In Jatav Pura Ward 02

BOQ

Name of Work:- Construction work of CC road and drain from P.S Maheshwari to amit and abhay agrawal to kapil agrawal to vishnu bal sadan school and mukesh to shiv mandir in jatav pura ward 02
Sl. No. Item Description
1Dismantling of old damaged B.O.E. soling/C.C.Interlocking Tiles and stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(Non Schedule Item No.1)
2Dismantling of cement concrete or brick or granolithic floors.including base concrete and stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(S.I.No.697)
3Dismantling of old damage brick work and stone work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M. (S.I.No.692)
4Supplying of Earth for cutting or in embankment in ordinary soil earth work in filling or embankment to be in 20 cm layers, including ,watering ,Dressing ,compacting ,ramming the soil to achive 95% proctor density ,and dressing the surface to be required levels and slope and also including 1.50m lift and 30 m lead . The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m distance and cartage upto 8Km distance as directed by the Engineer-in-charge excluding royalty
5Providing and laying cement concrete in 1:6:12 (1 cement : 6 Fine sand : 12 Brick ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. (S.I No. 273)
6First class B/w in 1:4 Cement C'sand mortor in F/P including supply of all meterial labour T&P etc required for proper completion of work SI N0.305
712 mm thick plaster in 1:5 cement & c'sand mortor over brick work minimume thickness not less then 10 mm including all supply of meterial , Labour T&P etc S.I.No. 584(i)
8Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I.
9RCC 1:2:4 with cement c'sand stone grit of 20 mm gauge in slab of culvert excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. SI No. 284
10Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as per E/I SI No. 504
11P/L of Granular sub base with coarse graded materials (Table 404 ) in granular sub base by providing coare graded materials, spreading in uniform layer with motor grader on preparing surface mixing by mix in place method with rotovator O.M.C. and compacting with power vibratory roller to achieve the desired density complete as per clause 401compected incluing lighting, guarding, barricating and maintance of diversion etc.
12P/L of 125 micron Plastic Sheet
13Providing and laying cement concrete in 1:1.5:3 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I.
14Deduction cost of bricks bats
15Deduction cost of bricks
16Dismantling of old damaged B.O.E. soling/C.C.Interlocking Tiles and stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(Non Schedule Item No.1)
17Dismantling of cement concrete or brick or granolithic floors.including base concrete and stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(S.I.No.697)
18Dismantling of old damage brick work and stone work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M. (S.I.No.692)
19Supplying of Earth for cutting or in embankment in ordinary soil earth work in filling or embankment to be in 20 cm layers, including ,watering ,Dressing ,compacting ,ramming the soil to achive 95% proctor density ,and dressing the surface to be required levels and slope and also including 1.50m lift and 30 m lead . The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m distance and cartage upto 8Km distance as directed by the Engineer-in-charge excluding royalty
20Providing and laying cement concrete in 1:6:12 (1 cement : 6 Fine sand : 12 Brick ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. (S.I No. 273)
21First class B/w in 1:4 Cement C'sand mortor in F/P including supply of all meterial labour T&P etc required for proper completion of work SI N0.305
2212 mm thick plaster in 1:5 cement & c'sand mortor over brick work minimume thickness not less then 10 mm including all supply of meterial , Labour T&P etc S.I.No. 584(i)
23Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I.
24RCC 1:2:4 with cement c'sand stone grit of 20 mm gauge in slab of culvert excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. SI No. 284
25Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as per E/I SI No. 504
26P/L of Granular sub base with coarse graded materials (Table 404 ) in granular sub base by providing coare graded materials, spreading in uniform layer with motor grader on preparing surface mixing by mix in place method with rotovator O.M.C. and compacting with power vibratory roller to achieve the desired density complete as per clause 401compected incluing lighting, guarding, barricating and maintance of diversion etc.
27P/L of 125 micron Plastic Sheet
28Providing and laying cement concrete in 1:1.5:3 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I.
29Deduction cost of bricks bats
30Deduction cost of bricks
31Dismantling of old damaged B.O.E. soling/C.C.Interlocking Tiles and stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(Non Schedule Item No.1)
32Dismantling of cement concrete or brick or granolithic floors.including base concrete and stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(S.I.No.697)
33Dismantling of old damage brick work and stone work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M. (S.I.No.692)
34Supplying of Earth for cutting or in embankment in ordinary soil earth work in filling or embankment to be in 20 cm layers, including ,watering ,Dressing ,compacting ,ramming the soil to achive 95% proctor density ,and dressing the surface to be required levels and slope and also including 1.50m lift and 30 m lead . The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m distance and cartage upto 8Km distance as directed by the Engineer-in-charge excluding royalty
35Providing and laying cement concrete in 1:6:12 (1 cement : 6 Fine sand : 12 Brick ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. (S.I No. 273)
36First class B/w in 1:4 Cement C'sand mortor in F/P including supply of all meterial labour T&P etc required for proper completion of work SI N0.305
3712 mm thick plaster in 1:5 cement & c'sand mortor over brick work minimume thickness not less then 10 mm including all supply of meterial , Labour T&P etc S.I.No. 584(i)
38Providing and laying cement concrete in 4:2:1 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I.
39RCC 1:2:4 with cement c'sand stone grit of 20 mm gauge in slab of culvert excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. SI No. 284
40Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as per E/I SI No. 504
41P/L of Granular sub base with coarse graded materials (Table 404 ) in granular sub base by providing coare graded materials, spreading in uniform layer with motor grader on preparing surface mixing by mix in place method with rotovator O.M.C. and compacting with power vibratory roller to achieve the desired density complete as per clause 401compected incluing lighting, guarding, barricating and maintance of diversion etc.
42P/L of 125 micron Plastic Sheet
43Providing and laying cement concrete in 1:1.5:3 of not less than strength of M-150 stone ballast (20 mm nominal size), approved coarse sand and cement, curing complete including of cost of form work in foundation and floors-completion of the work as per direction of the E / I.
44Deduction cost of bricks bats
45Deduction cost of bricks Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 56562089
AUTHORITY Local Bodies
TENDER VALUE 42.22 Lakhs
LAST DATE 27-07-2026
Authority
Authority Name Bareilly Municipal Corporation
Work Description Tender for Construction Work Of cement concrete Road And Drain From P.S Maheshwari To Amit And Abhay Agrawal To Kapil Agrawal To Vishnu Bal Sadan School And Mukesh To Shiv Mandir In Jatav Pura Ward 02
Basic Detail
Tender No 213/CE/CD/NNB/26-27 (1 To 7) Sr No 1 Tender List 7 Date-18.07.2026
Bidding Type Tender
Location
City Bareilly
State Uttar Pradesh
Key Dates
Publish Date 20 Jul 2026
Submission Date 27 Jul 2026
Open Date 27 Jul 2026
Finance
Tender Value 42.22 Lakhs
Tender Fee 4956
EMD 84440
Exemption Not Available
Document List
06daf294-68e0-4a64-bfda-4f15970ff3d9.html
BOQ_2197703.xls
Tendernotice_1 (29).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jul 20, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Jul 27, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Today
Jul 27, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Today

Tender Documents

Download All (ZIP) ↓
html

06daf294-68e0-4a64-bfda-4f15970ff3d9.html

xls

BOQ_2197703.xls

pdf

Tendernotice_1 (29).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders