Tender For Turnkey Construction Of 220 Kv Sonapur-Tsat Double Circuit Transmission Line For Redundant Power Supply To Tata Semiconductor [Schedule 1-Supply]
Tender Value
Ref. Documents
Estimated cost
Bid Submission
10 Aug 2026
18 days left
EMD
1.57 Crore
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kamrup Metro → Assam
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Turnkey Construction Of 220 Kv Sonapur-Tsat Double Circuit Transmission Line For Redundant Power Supply To Tata Semiconductor [Schedule 1-Supply]
BOQ
| Sl. No. | Item Description |
| 1 | Tower Superstructure |
| 2 | Fabrication, galvanising and supply of various types of towers and tower parts, tower body/leg (equal & unequal) extensions including hangers, D-shackles, pack washers, Hex. Bolts & nuts including step bolts, anti-theft bolts & nuts, washers etc. |
| 3 | Stub sets |
| 4 | Fabrication, galvanising and supply of stubs and cleats for various types of towers with pack washers including Hex. bolts & nuts, plain washers etc. |
| 5 | Stub setting |
| 6 | Stub setting template including galvanized nuts & bolts etc.(DA=4Sets, DB=2Sets, DC=2Sets & DD=4Sets) |
| 7 | Power Conductor |
| 8 | ACSR Zebra conductor (Route length 26.5km) |
| 9 | Insulators |
| 10 | 120KN, single tension disc insulator string complete with hardware fittings including tension clamp for zebra conductor comprising of 15 disc insulators(B&S type) per string |
| 11 | 90KN, single suspension disc insulator string complete with hardware fittings including tension clamp for zebra conductor comprising of 14 disc insulators(B&S type) per string |
| 12 | 240KN, double tension disc insulator string comprising 2 string of 120KN disc insulator complete comprising of 15 disc insulators (B&S type) per string with all hardware fittings including tension clamp |
| 13 | 180KN porcelain double suspension insulator string comprising 2 string of 90KN disc insulators (B&S type) per string with all hardware fittings including tension clamp |
| 14 | Power conductor accessories |
| 15 | Stock Bridge type Vibration Damper for ACSR Zebra conductor |
| 16 | Mid span compression joint for ACSR Zebra conductor |
| 17 | Repair sleeve for ACSR Zebra conductor |
| 18 | Preformed armor rod |
| 19 | PG Clamp for ACSR Zebra conductor |
| 20 | T Clamp for ACSR Zebra conductor |
| 21 | Tower Accessories |
| 22 | Supply of Danger plate |
| 23 | Supply of Phase plate (set of 3) |
| 24 | Supply of Number Plate |
| 25 | Supply of Bird Guard (set of 6) |
| 26 | Supply of Circuit plate (set of 2) |
| 27 | Supply of Anti- Climbing device |
| 28 | Supply of Earthing of Tower with all accessories including all consumable items |
| 29 | Normal earthing pipe type |
| 30 | Chemical earthing pipe type |
| 31 | Supply of OPGW, Hardware Fittings, Joints, Terminations and Approach Cables |
| 32 | 48 F DWSM OPGW |
| 33 | 48F Fibre Optic Approach Cable (FOAC) |
| 34 | Suspension Assembly |
| 35 | Tension Assembly for Pass Through Location |
| 36 | Tension Assembly for JB Location |
| 37 | Tension Assembly for Dead End Location |
| 38 | Tension Assembly for Suspension Tower with JB location |
| 39 | Vibration Damper |
| 40 | Downlead Clamps |
| 41 | 48F OPGW Splice Kit including Joint Box(JB) |
| 42 | 96F FODP indoor with rack mounted FCPC Coupling and pig tails |
| 43 | Hardware Set for 48F FOAC: Conduits, Ducts, Supports, Fittings, Accessories etc. upto control room both end and as per tower schedule. |
| 44 | Supply of 220kV XLPE Cable, underground OFC and Accessories |
| 45 | Supply of 220 kV XLPE Insulated, Aluminium Conductor Power Cable, 1000 sq.mm, complete with conductor screen, XLPE insulation, insulation screen, metallic screen, water barrier, over sheath and all associated components, conforming to the Technical Specifications, relevant IEC/IS Standards and suitable for the specified site conditions. |
| 46 | Supply of 220 kV Outdoor Cable Termination Kits suitable for the supplied 220 kV, 1000 sq.mm XLPE Aluminium Power Cable, complete with stress control system, sealing components, lugs, connectors, support hardware, glands, accessories and all other materials required for complete installation, testing and commissioning, conforming to the Technical Specifications and site requirements. |
| 47 | Supply of Straight Through Jointing Kits suitable for the supplied 220 kV, 1000 sq.mm XLPE Insulated Aluminium Conductor Power Cable, complete with all jointing materials, stress control components, conductor connectors, metallic screen and sheath continuity/bonding components, insulation and sealing materials, grounding and earthing accessories, hardware, clamps, fixing arrangements, consumables, tools (if required), and all other accessories necessary for complete installation, jointing, bonding, testing and commissioning of the cable system, conforming to the Technical Specifications, approved drawings, applicable IEC/IS Standards and site requirements, complete in all respects. |
| 48 | Supply of 48 Fibre Optical Fibre Cable (OFC) Approach Cable suitable for underground installation along the route of the supplied 220 kV XLPE Cable, complete with all accessories, connectors, protective components, hardware and consumables required for complete installation, testing and commissioning, conforming to the Technical Specifications and site requirements. |
| 49 | Supply of HDPE Duct/Pipe suitable for installation of the supplied 220 kV XLPE Power Cable, complete with couplers, bends, end caps, spacers, sealing plugs, warning tape, markers and all associated accessories required for complete installation, conforming to the Technical Specifications and site requirements. |
| 50 | Supply of HDPE Duct/Pipe suitable for installation of the supplied 48 Fibre Optical Fibre Approach Cable, complete with couplers, bends, end caps, spacers, sealing plugs, warning tape, markers and all associated accessories required for complete installation, conforming to the Technical Specifications and site requirements. |
| 51 | Supply of Metallic Joint Box suitable for the supplied 48 Fibre Optical Fibre Approach Cable, complete with splice trays, cable glands, sealing arrangements, mounting accessories, connectors, hardware and all associated materials required for complete installation, testing and commissioning, conforming to the Technical Specifications and site requirements. |
| 52 | Supply of all miscellaneous installation materials required for complete cable laying, jointing, bonding, testing and commissioning of the cable system, including but not limited to Link Boxes, Sheath Voltage Limiters (SVLs), Earth Continuity Cables (ECC), earthing materials, ground mats, cable markers, route markers, warning tapes, clamps, glands, lugs, connectors, fixing accessories, hardware, consumables, and all other associated materials required for proper installation, bonding, earthing and protection of the cable system at both cable ends, complete in all respects, in accordance with the Technical Specifications, approved drawings, applicable IEC/IS standards, and statutory requirements. (for both cable ends of Sonapur & TSAT) |
| 53 | Supply of 220 kV Lightning Arresters (LA), complete with all accessories, fittings, mounting hardware, support structures/adaptors required for installation on Composite Towers, conforming to the Technical Specifications and suitable for site conditions. |
| 54 | Tower Superstructure (F&I) |
| 55 | Fabrication, galvanising and supply of various types of towers and tower parts, tower body/leg (equal & unequal) extensions including hangers, D-shackles, pack washers, Hex. Bolts & nuts including step bolts, anti-theft bolts & nuts, washers etc. |
| 56 | Stub sets (F&I) |
| 57 | Fabrication, galvanising and supply of stubs and cleats for various types of towers with pack washers including Hex. bolts & nuts, plain washers etc. |
| 58 | Stub setting (F&I) |
| 59 | Stub setting template including galvanized nuts & bolts etc.(DA=4Sets, DB=2Sets, DC=2Sets & DD=4Sets) |
| 60 | Power Conductor (F&I) |
| 61 | ACSR Zebra conductor (Route length 26.5km) |
| 62 | Insulators (F&I) |
| 63 | 120KN, single tension disc insulator string complete with hardware fittings including tension clamp for zebra conductor comprising of 15 disc insulators(B&S type) per string |
| 64 | 90KN, single suspension disc insulator string complete with hardware fittings including tension clamp for zebra conductor comprising of 14 disc insulators(B&S type) per string |
| 65 | 240KN, double tension disc insulator string comprising 2 string of 120KN disc insulator complete comprising of 15 disc insulators (B&S type) per string with all hardware fittings including tension clamp |
| 66 | 180KN porcelain double suspension insulator string comprising 2 string of 90KN disc insulators (B&S type) per string with all hardware fittings including tension clamp |
| 67 | Power conductor accessories (F&I) |
| 68 | Stock Bridge type Vibration Damper for ACSR Zebra conductor |
| 69 | Mid span compression joint for ACSR Zebra conductor |
| 70 | Repair sleeve for ACSR Zebra conductor |
| 71 | Preformed armor rod |
| 72 | PG Clamp for ACSR Zebra conductor |
| 73 | T Clamp for ACSR Zebra conductor |
| 74 | Tower Accessories (F&I) |
| 75 | Supply of Danger plate |
| 76 | Supply of Phase plate (set of 3) |
| 77 | Supply of Number Plate |
| 78 | Supply of Bird Guard (set of 6) |
| 79 | Supply of Circuit plate (set of 2) |
| 80 | Supply of Anti- Climbing device |
| 81 | F&I of Earthing of Tower with all accessories including all consumable items |
| 82 | Normal earthing pipe type |
| 83 | Chemical earthing pipe type |
| 84 | F&I of OPGW, Hardware Fittings, Joints, Terminations and Approach Cables |
| 85 | 48 F DWSM OPGW |
| 86 | 48F Fibre Optic Approach Cable (FOAC) |
| 87 | Suspension Assembly |
| 88 | Tension Assembly for Pass Through Location |
| 89 | Tension Assembly for JB Location |
| 90 | Tension Assembly for Dead End Location |
| 91 | Tension Assembly for Suspension Tower with JB location |
| 92 | Vibration Damper |
| 93 | Downlead Clamps |
| 94 | 48F OPGW Splice Kit including Joint Box(JB) |
| 95 | 96F FODP indoor with rack mounted FCPC Coupling and pig tails |
| 96 | Hardware Set for 48F FOAC: Conduits, Ducts, Supports, Fittings, Accessories etc. upto control room both end and as per tower schedule. |
| 97 | F&I of 220kV XLPE Cable, underground OFC and Accessories |
| 98 | F&I of 220 kV XLPE Insulated, Aluminium Conductor Power Cable, 1000 sq.mm, complete with conductor screen, XLPE insulation, insulation screen, metallic screen, water barrier, over sheath and all associated components, conforming to the Technical Specifications, relevant IEC/IS Standards and suitable for the specified site conditions. |
| 99 | F&I of 220 kV Outdoor Cable Termination Kits suitable for the supplied 220 kV, 1000 sq.mm XLPE Aluminium Power Cable, complete with stress control system, sealing components, lugs, connectors, support hardware, glands, accessories and all other materials required for complete installation, testing and commissioning, conforming to the Technical Specifications and site requirements. |
| 100 | F&I of Straight Through Jointing Kits suitable for the supplied 220 kV, 1000 sq.mm XLPE Insulated Aluminium Conductor Power Cable, complete with all jointing materials, stress control components, conductor connectors, metallic screen and sheath continuity/bonding components, insulation and sealing materials, grounding and earthing accessories, hardware, clamps, fixing arrangements, consumables, tools (if required), and all other accessories necessary for complete installation, jointing, bonding, testing and commissioning of the cable system, conforming to the Technical Specifications, approved drawings, applicable IEC/IS Standards and site requirements, complete in all respects. |
| 101 | F&I of 48 Fibre Optical Fibre Cable (OFC) Approach Cable suitable for underground installation along the route of the supplied 220 kV XLPE Cable, complete with all accessories, connectors, protective components, hardware and consumables required for complete installation, testing and commissioning, conforming to the Technical Specifications and site requirements. |
| 102 | F&I of HDPE Duct/Pipe suitable for installation of the supplied 220 kV XLPE Power Cable, complete with couplers, bends, end caps, spacers, sealing plugs, warning tape, markers and all associated accessories required for complete installation, conforming to the Technical Specifications and site requirements. |
| 103 | F&I of HDPE Duct/Pipe suitable for installation of the supplied 48 Fibre Optical Fibre Approach Cable, complete with couplers, bends, end caps, spacers, sealing plugs, warning tape, markers and all associated accessories required for complete installation, conforming to the Technical Specifications and site requirements. |
| 104 | F&I of Metallic Joint Box suitable for the supplied 48 Fibre Optical Fibre Approach Cable, complete with splice trays, cable glands, sealing arrangements, mounting accessories, connectors, hardware and all associated materials required for complete installation, testing and commissioning, conforming to the Technical Specifications and site requirements. |
| 105 | F&I of all miscellaneous installation materials required for complete cable laying, jointing, bonding, testing and commissioning of the cable system, including but not limited to Link Boxes, Sheath Voltage Limiters (SVLs), Earth Continuity Cables (ECC), earthing materials, ground mats, cable markers, route markers, warning tapes, clamps, glands, lugs, connectors, fixing accessories, hardware, consumables, and all other associated materials required for proper installation, bonding, earthing and protection of the cable system at both cable ends, complete in all respects, in accordance with the Technical Specifications, approved drawings, applicable IEC/IS standards, and statutory requirements. (for both cable ends of Sonapur & TSAT) |
| 106 | F&I of 220 kV Lightning Arresters (LA), complete with all accessories, fittings, mounting hardware, support structures/adaptors required for installation on Composite Towers, conforming to the Technical Specifications and suitable for site conditions. |
| 107 | Survey |
| 108 | Detail survey including route alignment, profiling and tower spotting using Modern Survey Techniques as per Specification |
| 109 | Check survey |
| 110 | Detail soil investigation |
| 111 | All kind of soil except fissured rock and hard rock |
| 112 | Fissured rock |
| 113 | Work associated with tower foundations for various types of tower and gantry: Construction of Reinforced Cement Concrete (RCC) Foundations for various types of Transmission Line Towers and Gantries, including setting out, excavation in all types of soil/rock, benching, shoring/strutting (where required), dewatering, supply and transportation of all materials, batching, mixing, placing, vibrating, compacting, finishing and curing of concrete, formwork/shuttering, head loading, handling, levelling, backfilling with approved excavated material, compaction, disposal of surplus excavated earth, restoration of the site, all labour, equipment, tools & plants, quality control, testing and all incidental works, complete in accordance with the approved foundation drawings, tower schedule, Technical Specifications and applicable IS/IEC Standards, complete in all respects. |
| 114 | Concreting |
| 115 | Reinforcement |
| 116 | Construction of Cast-in-Situ RCC Pile Foundations for Transmission Line Towers, including mobilization, setting out, boring, installation of MS steel liners (where required), reinforcement, M-25 grade concrete, shuttering/formwork, excavation, dewatering, concreting, vibrating, compaction, curing, pile head preparation, backfilling, disposal of surplus excavated material, quality control, testing, and all labour, materials, machinery, tools & plants and incidental works, complete in accordance with the drawings provided with the Bid Documents (forming part of the Tender), the Technical Specifications and applicable IS/IEC Standards, complete in all respects. |
| 117 | Setting, positioning, alignment and fixing of one complete set of four (4) Tower Stubs, including transportation of stubs, templates and accessories from the stores to the work site, unloading, handling, distribution, alignment and securing in position as per approved drawings and tower schedule. The item excludes excavation, concreting and backfilling. |
| 118 | Erection of various types of Transmission Line Towers, including tower body, normal/unequal leg extensions, body extensions, stub matching, complete assembly of tower members with bolts, nuts, spring washers, plain washers, step bolts, anti-climbing devices, hangers, D-shackles, danger plates, phase plates, circuit plates, number plates, aviation warning fittings (where applicable), earthing attachments and all other associated fittings and accessories, including transportation of tower materials, extensions and accessories from the stores to the work site, unloading, handling, distribution along the line route, assembly, alignment, plumbing, tightening of bolts to the specified torque, rectification (if required), and all labour, tools & plants, cranes/equipment, temporary works and incidental works required for complete erection of the tower in accordance with the Technical Specifications, approved drawings and applicable IS/IEC Standards, complete in all respects. |
| 119 | Protection of tower (supply & installation) |
| 120 | Painting of tower members with approved quality bituminous paint from ground level up to 3.0 metres height above finished ground level, including thorough surface cleaning, preparation of steel surface, application of primer (where specified) and bituminous paint of approved make and quality, together with all labour, materials, tools & plants, scaffolding and incidental works, complete in all respects. |
| 121 | Providing and laying Stone/Brick Soling for Tower Foundations, including supply, transportation, spreading, dressing, levelling, compaction and all labour, materials, tools & plants required for complete execution as per approved drawings and Technical Specifications. |
| 122 | Welding of all tower nuts and bolts up to the bottom cross-arm level, including surface preparation, welding, grinding and finishing as required, followed by application of zinc-rich primer over welded portions and two coats of approved synthetic enamel paint to restore corrosion protection, including supply of all welding consumables, primer, paint, transportation, labour, tools & plants and all incidental works, complete in accordance with the Technical Specifications and approved drawings. |
| 123 | Installation of earthing of tower:Grounding of towers with 3 meter long 25mm dia GI pipe, including cost of all materials, such as GI pipes, GI bolts & nuts and washer, salt cock etc as per specification |
| 124 | Normal earthing pipe type |
| 125 | Chemical earthing pipe type |
| 126 | Installation of the following tower accessories |
| 127 | Erection of Danger plate |
| 128 | Erection of Phase plate (set of 3) |
| 129 | Erection of Number Plate |
| 130 | Erection of Bird Guard (set of 6) |
| 131 | Erection of Circuit plate (set of 2) |
| 132 | Erection of Anti- Climbing device |
| 133 | Stringing of Power Conductors, including transportation of conductors, insulators, hardware fittings and all associated materials from the stores to the work site; unloading, handling, distribution along the line route, paying out, tensioning, sagging, stringing, clipping, clamping, compression jointing, repair sleeves (where required), jumpering, hoisting and fixing of insulator strings, spacers/spacer dampers (where applicable), vibration dampers, armour rods, connectors, and all other fittings, accessories, hardware, consumables, labour, tools & plants, temporary works, testing and all incidental works necessary for complete erection of the transmission line, in accordance with the Technical Specifications, approved drawings and applicable IEC/IS Standards, complete in all respects, measured per route kilometre of 6-conductor transmission line. |
| 134 | Installation of OPGW, Hardware Fittings, Joints, Terminations and Approach Cables |
| 135 | 48 F DWSM OPGW |
| 136 | 48F Fibre Optic Approach Cable (FOAC) |
| 137 | Suspension Assembly |
| 138 | Tension Assembly for Pass Through Location |
| 139 | Tension Assembly for JB Location |
| 140 | Tension Assembly for Dead End Location |
| 141 | Tension Assembly for Suspension Tower with JB location |
| 142 | Vibration Damper |
| 143 | Downlead Clamps |
| 144 | 48F OPGW Splice Kit including Joint Box(JB) |
| 145 | 96F FODP indoor with rack mounted FCPC Coupling and pig tails |
| 146 | Hardware Set for 48F FOAC: Conduits, Ducts, Supports, Fittings, Accessories etc. Hardware Set for 48F FOAC: Conduits, Ducts, Supports, Fittings, Accessories etc. upto control room both end and as per tower schedule. |
| 147 | Erection, Testing & Commissioning of 220 kV XLPE Cable System and underground OFC including Associated Civil Works |
| 148 | Erection, laying, testing and commissioning of 220 kV XLPE Aluminium Power Cable along with 48 Fibre Optic Cable (OFC) System through HDD method, including HDD drilling, reaming, installation of HDPE ducts, cable pulling, laying, dressing, fixing, testing and all associated works complete as per Technical Specifications, approved drawings and applicable IEC/IS Standards. (1 Route = 4 Nos. single-core 220 kV XLPE cables + 48 Fibre Optic Cable) |
| 149 | Erection, laying, testing and commissioning of 220 kV XLPE Aluminium Power Cable along with 48 Fibre Optic Cable (OFC) System through buried underground method, including excavation, HDPE duct installation, cable laying, OFC laying, sand cushioning, protective covering, warning tapes, backfilling, restoration, testing and all associated works complete as per Technical Specifications, approved drawings and applicable IEC/IS Standards. (1 Route = 4 Nos. single-core 220 kV XLPE cables + 48 Fibre Optic Cable) |
| 150 | Erection, laying, testing and commissioning of 220 kV XLPE Aluminium Power Cable along with 48 Fibre Optic Cable (OFC) System through open trench method, including excavation, trench preparation, construction and installation of HDPE ducts, cable laying, OFC laying, cable protection, backfilling, restoration, testing and all associated works complete in all respects as per Technical Specifications, approved drawings and applicable IEC/IS Standards. (1 Route = 4 Nos. of single-core 220 kV XLPE Aluminium Power Cables + 48 Fibre Optic Cable System). |
| 151 | Construction of RCC Cable Jointing Box including RCC Culvert and Cover Slab, complete with excavation, PCC/RCC works, reinforcement, shuttering, concreting, curing, waterproofing, cable entry arrangements, backfilling, finishing and all associated civil works required for installation of 220 kV cable joints, including supply of all materials, manpower, machinery, tools & plants and equipment required for complete execution, in accordance with approved drawings, Technical Specifications and site requirements, complete in all respects. |
| 152 | Erection, Testing and Commissioning of 220 kV Outdoor Cable Termination Kits suitable for the supplied 220 kV, 1000 sq.mm XLPE Aluminium Power Cable, including cable preparation, installation of stress control system, sealing components, lugs, connectors, support hardware, glands and all associated accessories required for complete termination, testing and commissioning. The scope shall also include construction of 220 kV Cable Support Structure (CSC), including design, supply, fabrication, erection of superstructure, mounting arrangements, structural accessories, foundation interface works and all associated materials, manpower, tools & plants and equipment required for complete installation, conforming to the Technical Specifications, approved drawings, applicable IEC/IS Standards and site requirements, complete in all respects. |
| 153 | Erection, Testing and Commissioning (ETC) of Straight Through Jointing Kits suitable for the supplied 220 kV, 1000 sq.mm XLPE Insulated Aluminium Conductor Power Cable, including cable preparation, installation of jointing components, stress control components, conductor connectors, metallic screen and sheath continuity/bonding arrangements, insulation and sealing materials, grounding and earthing accessories, hardware, clamps, fixing arrangements, consumables, tools & plants and all other accessories required for complete jointing, bonding, testing and commissioning of the cable system, in accordance with the Technical Specifications, approved drawings, applicable IEC/IS Standards and site requirements, complete in all respects. |
| 154 | Erection, Testing and Commissioning (ETC) of Metallic Joint Box suitable for the supplied 48 Fibre Optical Fibre Approach Cable, including installation of splice trays, fibre splicing arrangements, cable glands, sealing arrangements, mounting accessories, connectors, hardware and all associated materials required for complete installation, testing and commissioning of the OFC system, including fibre continuity testing, OTDR testing and attenuation measurement, in accordance with the Technical Specifications, approved drawings and site requirements, complete in all respects. |
| 155 | Erection, Testing and Commissioning (ETC) of all miscellaneous installation materials required for complete laying, jointing, bonding, testing and commissioning of the 220 kV cable system, including but not limited to installation of Link Boxes, Sheath Voltage Limiters (SVLs), Earth Continuity Cables (ECC), earthing materials, ground mats, cable markers, route markers, warning tapes, clamps, glands, lugs, connectors, fixing accessories, hardware, consumables and all other associated materials required for proper cable installation, bonding, earthing and protection at both cable ends, along with associated civil works including excavation, PCC/RCC works, foundation/support arrangements, cable chambers/pits (where required), backfilling, restoration and all incidental works required for complete installation. The scope shall include testing of bonding and earthing systems and all associated works in accordance with the Technical Specifications, approved drawings, applicable IEC/IS Standards and statutory requirements, complete in all respects. (for both cable ends of Sonapur & TSAT) |
| 156 | Erection, Testing and Commissioning (ETC) of 220 kV Lightning Arresters (LA), complete with all accessories, fittings, mounting hardware, support structures/adaptors required for installation on Composite Towers, including construction of required foundations, PCC/RCC works, reinforcement, shuttering, concreting, curing, grouting, earthing system, supply and installation of earth conductors, earth electrodes, clamps, connectors and all associated earthing arrangements. The scope shall include erection, alignment, fixing, electrical connections, testing and commissioning of LA units, foundation works, earthing works and all associated civil, electrical and installation activities along with required labour, materials, tools & plants, equipment and consumables, conforming to the Technical Specifications, approved drawings, applicable IEC/IS Standards and site requirements, complete in all respects. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 20, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 10, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysAug 11, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 19 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender