Tender For Consultancy Services For Preparation Of detail project report For Construction Of 4 Lane Flyover At Rd 6100(Anangpur Chowk) On Delhi Mathura Road(Nh-44) To Prahaladpur Border(Asset Id 1014) In Faridabad District
Tender Overview
Project Description
Tender for Consultancy Services For Preparation Of detail project report For Construction Of 4 Lane Flyover At Rd 6100(Anangpur Chowk) On Delhi Mathura Road(Nh-44) To Prahaladpur Border(Asset Id 1014) In Faridabad District
BOQ
| Sl. No. | Item Description |
| 1 | I. Remuneration for Local Staff (Including per diem allowance)Professional Staff: |
| 2 | Team Leader cum BridgeEngineer |
| 3 | Bridge Structural Engineer |
| 4 | Highway Engineer |
| 5 | Material-cum-Geotechnical Engineer |
| 6 | Survey Engineer |
| 7 | Geologist |
| 8 | Quantity Surveyor |
| 9 | Utility Expert |
| 10 | SUB-TOTAL-1 |
| 11 | SUB-PROFESSIONAL STAFF : |
| 12 | Auto CAD Expert & Modeller |
| 13 | Traffic Engineer |
| 14 | Sub-Professional-3 |
| 15 | Sub-Professional-4 |
| 16 | Sub-Professional-5 |
| 17 | Sub-Professional-6 |
| 18 | Sub-Professional-7 |
| 19 | SUB-TOTAL-2 |
| 20 | Total (Sub Total 1 + Sub Total 2): |
| 21 | Note: For proper assessment of utility estimates and proper drainage system provisions, DPR consultant shall also engage an utility expert and drainage expert at sub-professional level, with relevant technical expertise in respective fields. |
| 22 | II. SUPPORT STAFF |
| 23 | Office Manager |
| 24 | Typist |
| 25 | Office Boy |
| 26 | Night Watchmen |
| 27 | Total: |
| 28 | III. Transportation (Fixed Costs)Rate/Month |
| 29 | The vehicles provided by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.A. For use of consultants |
| 30 | Total: |
| 31 | IV. Duty Travel to Site (Fixed Costs):Note: Rate quoted includes Hotel charges, travel cost etc. complete. |
| 32 | Duty Travel to Site (LS) |
| 33 | Total: |
| 34 | V. Office Rent (Fixed Costs)The rent cost includes maintenance, cleaning, repairing etc. (Rate per Month) |
| 35 | Office Rent (Fixed Costs) |
| 36 | Total: |
| 37 | VI. OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs)Rate/Month |
| 38 | Office Supplies |
| 39 | Drafting Supplies |
| 40 | Computer Running Costs |
| 41 | Domestic and International Communication |
| 42 | Total: |
| 43 | VII. OFFICE FURNITURE AND EQUIPMENT (Rental) |
| 44 | Office Furniture and Ecquipment (LS) |
| 45 | Total: |
| 46 | VIII. REPORTS & DOCUMENTS PRINTING (Rate per Copy) |
| 47 | Monthly report (3 copies per Month) |
| 48 | Inception Report & QAP |
| 49 | Environment and Social Impact Screening Report |
| 50 | Draft Feasibility Report |
| 51 | Final Feasibility Report |
| 52 | Strip Plan with LA Reports |
| 53 | Draft LA and Clearances I Report |
| 54 | Final LA and Clearances I Report |
| 55 | Draft Environmental Assessment Report & RAP |
| 56 | Final Environmental Assessment Report and RAP |
| 57 | Draft Detailed Design Report & Drawings etc. |
| 58 | Draft EMP |
| 59 | Draft Bidding Documents |
| 60 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. |
| 61 | Final EMP. |
| 62 | Final Bidding Documents |
| 63 | Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each) |
| 64 | LA & Clearances II Report |
| 65 | Total: |
| 66 | Note: In case of splitting of the project in packages after alignment is finalized, the additional payment in respect of reports and document printing shall be made on prorate basis of accepted financial proposal according to additional number of documents submitted, as mentioned above |
| 67 | IX.Survey and Investigation:A. Topographical Survey (Fixed Rate) |
| 68 | Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer. |
| 69 | Detailed topographic surveys using mobile / aerial LiDAR or better Technology |
| 70 | B. Investigation (Fixed Cost) |
| 71 | Road and Bridge Inventory |
| 72 | FWD Test and Pavement Evaluation |
| 73 | Roughness Survey |
| 74 | Axle Load Survey |
| 75 | Material Survey and Investigation |
| 76 | Sub-grade Investigation |
| 77 | Traffice Survey |
| 78 | Socio-economic & Census Survey/Studies |
| 79 | Land Acquisition Studies |
| 80 | Any other Investigations/Surveys |
| 81 | *Sub-Soil Investigation (Boring) |
| 82 | a) Boring in all type of soils (other than hard rock) |
| 83 | b) Boring in hard rock |
| 84 | Total: |
| 85 | Note:*Quantities of boring shall be taken from Financial Proposal Form No.V. for financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, payment shall be made on the actual quantity of boring at rates quoted above by the consultant, which may be substantially more or less than the estimated quantities. |
| 86 | C. Network Survey and GPR |
| 87 | GPR Survey for detection of under ground utilities |
| 88 | Total: |
| 89 | Total Cost Net of Goods and Service Tax:**Total cost net of Goods and Service Tax shall be considered for Financial Evaluation.Note: Payment will be made as per stipulations of the conditions of conntract. |
| 90 | Goods and service Tax |
| 91 | TOTAL COSTS (Including GST) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender