Tender For Detailed Design, Procurement Construction, Testing & Commissioning Of The Museum Cum Orientation Centre, Lothal Archaeological Site, Lothal, District-Ahemdabad, Gujarat For Asi On Epc Basis
Tender Overview
Project Description
Tender for Detailed Design, Procurement Construction, Testing & Commissioning Of The Museum Cum Orientation Centre, Lothal Archaeological Site, Lothal, District-Ahemdabad, Gujarat For Asi On Epc Basis
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 12-Aug-2026 | Extension of Bid Submission Date and Clarification of Prebid query | Date | 31-Aug-2026 |
| 2 | 27-Aug-2026 | Extension of Bid Submission Date | Date | 07-Sep-2026 |
| 3 | 12-Aug-2026 | Extension of Bid Submission Date and Clarification of Prebid query | Date | 31-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Part A - Cost of Building Works |
| 2 | Clutural & Community Block |
| 3 | Exhibition & Experience Block |
| 4 | Knowledge & Learning Centre Block |
| 5 | Infrastructure Work (with PTFE Tensile Fabric with structure) |
| 6 | Part B - Cost of Exhibition Interior work (Please refer to page 94 of RFP document as this cost is fixed and no precentage above/below/at par is to be quoted by the bidder) |
| 7 | Exhibition Galleries, detailed design of the galleries, making its presentation based on design intent for approval, getting approval from Curation Committee, ASI, Principal Project Consultant (AHC) and fabrication, production and installation including coordination of various items, Artefacts, theming, interior of the Exhibition spaces, Lighting, etc. (Provisional Sum with upper ceiling up to Rs. 30.00 Crore) |
| 8 | Design Engineering including safety certification and statutory approvals and audits, Interfacing, Coordinating & and all other obligations including all insurances, Bank Guarantee, Supervision charges etc. for stipulated timely completion in precentage (%) for the amount of work awarded (only on 2.01 above). The maximum percentage on Provisional Sum in 2.01 above is 10%. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 2 daysCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender