Tender For Dismentalling,Fabrication And Erection Job Work.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
03 Aug 2026
13 days left
EMD
50000
Bank guarantee accepted
Document Fee
100
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kaithal → Haryana
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Dismentalling,Fabrication And Erection Job Work.
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling, fabrication and erection of M.S. Structure and Platform (M.S. Channel, Plate, Angle, Beam etc.) |
| 2 | i) Dismantling |
| 3 | ii) Fabrication |
| 4 | iii) Erection |
| 5 | Dismantling, fabrication & erection of M.S., G.I. Pipe line ( 1\\" to 12\\") |
| 6 | i) Dismantling |
| 7 | ii) Fabrication |
| 8 | iii) Erection |
| 9 | Dismantling, fabrication & erection of pipe accessories (bend,reducer, flages, blind, nipple Tee, etc) (1’’ to 12’’) |
| 10 | i) Dismantling |
| 11 | ii) Fabrication |
| 12 | ii) Erection |
| 13 | Dismantling of valves/NRV |
| 14 | i) Upto 6” dia |
| 15 | ii) 7” dia to 12” dia |
| 16 | Erection of valves/NRV |
| 17 | i) Upto 6” dia |
| 18 | ii) 7” dia to 12” dia |
| 19 | Dismantling and erection of angle/Sluice/NRV /Butterfly valve 16” – 36” |
| 20 | i) Dismantling |
| 21 | ii) Erection |
| 22 | Dismantling, fabrication & erection of hand railing |
| 23 | i) Dismantling |
| 24 | ii) Fabrication & Erection |
| 25 | Dismantling Fabrication & erection of S.S. pipe. |
| 26 | i) Dismantling |
| 27 | ii) Erection |
| 28 | iii)Erection |
| 29 | Dismantling Fabrication & erection of Seamless pipe. |
| 30 | Dismantling |
| 31 | Fabrication |
| 32 | Erection |
| 33 | Dismantling Fabrication & erection of seem less pipes Accessories (bend, reducer blind nipple,Tee, Flange) |
| 34 | i) Dismantling |
| 35 | ii) Fabrication |
| 36 | iii) Erection |
| 37 | Dismantling, fabrication & erection of M.S. pipe (12” dia to28’’ dia) |
| 38 | i) Dismantling |
| 39 | ii) Fabrication |
| 40 | iii) Erection |
| 41 | Dismantling fabrication erection pipe accessories (Bend, Reducer, Tee, Nipple, Flange Blind) 12” |
| 42 | i) Dismantling |
| 43 | ii) Fabrication |
| 44 | iii) Erection |
| 45 | Dismantling fabrication erection of S.S. pipe accessories (Bend, Reducer, Tee, Nipple, Flange Blind) 1\\"-12\\"dia |
| 46 | i) Dismantling |
| 47 | ii) Fabrication |
| 48 | iii) Erection |
| 49 | Dismantling/fabriction and erection of vapour/Exhaust Pipe |
| 50 | i) Dismantling |
| 51 | ii)Fabrication |
| 52 | iii) Erection |
| 53 | Dismantling/fabriction and erection of vapour/Exhaust Pipe bend. |
| 54 | i) Dismentalling |
| 55 | ii) Fabrication |
| 56 | iii) Erection |
| 57 | Dismantling, fabrication & erection of M.S. coil |
| 58 | i) Dismantling |
| 59 | ii) Fabrication |
| 60 | ii) Erection |
| 61 | Repair/replacement of worn out boiler ducting |
| 62 | Dismantling, fabrication &errection of Sulphur melter /receiver |
| 63 | Dismantling, fabrication, repair & erection of Semikestner/vapour cell save all. |
| 64 | i) Dismantling |
| 65 | ii) Fabrication |
| 66 | iii) Erection |
| 67 | iv) Repair |
| 68 | Dismantling fabrication, repair & erection of quad body save all |
| 69 | i) Dismantling |
| 70 | ii) Fabrication |
| 71 | iii) Erection |
| 72 | iv) Repair |
| 73 | Welding work of any leaky pipe line/vessel and tanks etc. |
| 74 | Dismantling fabrication and erection of Evaporator Body umbrella. |
| 75 | Dismantling of old tubes & fitting of new SS tube of Juice heater with hydraulic testing. (Retubing of Body) |
| 76 | Dismantling of old tubes & fitting of new SS tubes of evaporator body with Hydrolic testing (Retubing of Body) |
| 77 | Replacement of cable trench at any station |
| 78 | Dismantling & fabrication and erection of Expansion joint of FD Fan at Boiler |
| 79 | Dismantling fabrication and erection of juice Sulphiter So2 coils |
| 80 | Dismantling fabrication & erection of So2 furnace primary cooler |
| 81 | Dismantling/ fabrication and erection of after burner |
| 82 | Dismantling & refitting and expanding of air heater tubes and trial. |
| 83 | Dismantling & fabrication and erection of Expansion joint of ID Fan at Boiler |
| 84 | Cutting & refitting shell of Quad /Pan save -all for checking/cleaning. |
| 85 | Dismantling, fabrication & erection of juice sulphitor SO2 Box |
| 86 | Replacement of worn out perforated plates of Steam entry at quad bodies |
| 87 | Cutting of portion of calenderia shell & its refitting for cleaning of calenderia of quad/juice heater. |
| 88 | Replacement of worn out SO2 furnace Cooler pipes with dismantling & erection of cover. |
| 89 | Dismantling & fabrication and erection of Expansion joint of Air Heater duct at Boiler |
| 90 | Dismantlig, Fabrication and erection of top cone of old Semi Kestner |
| 91 | S.S. lining of any equipiment |
| 92 | Dismantlig, Fabrication and erection of top cone of old vapour cell |
| 93 | Dismantling of old gear & erection of new planetary gear of crystallizers. |
| 94 | Fabrication and erection of M.S. grating for plate forms made From M.S. square bar and M.S. flat 25 x6 mm. |
| 95 | Dismantling, fabrication & erection of SO2 furnace cooler shell |
| 96 | Erection of M.S. plates 3mm to side wall of boilers with proper strengthening with M.S. angles. |
| 97 | Fabrication of 6 \\" /8''M.S. cross from seamless pipe |
| 98 | i) Dismantalling |
| 99 | ii) Fabrication |
| 100 | iii) Erection |
| 101 | Dismantalling, fabrication & erection of condensate box of quad/pan |
| 102 | Replacement of worn out steam jacket of Quad body. |
| 103 | Replacement of bottom of syrup receiving tank. |
| 104 | Replacement of man hole |
| 105 | i) Dismentalling |
| 106 | ii) Fabrication |
| 107 | iii) Erection |
| 108 | Fabrication of motor pump beds from M.S. channel/ Angles. |
| 109 | Replacement of J pipe of Quad/ Pan/ Evp. Body |
| 110 | Dismantling, fabrication & erection of Heavy & Light tank Vacuum filter |
| 111 | Dismantling, fabrication & erection of Vacuum filter tray |
| 112 | Dismantling, fabrication & erection of Agitator of vacuum filter |
| 113 | Dismantling and fitting of Gearbox with motor/pump with motor |
| 114 | i) Dismantling |
| 115 | ii) Fitting and alignment |
| 116 | Replacement of FD fan damper. |
| 117 | Dismantling, fabrication & erection of Internal/External Amonia Coils of Quad/ Vapour Cell/Juice Heater and Pan |
| 118 | Dismantling ,fabrication& erection of expansion joint of economizer at boiler. |
| 119 | Replacement of shaft & arms etc of Crystallizer. |
| 120 | Replacement of gutter any station |
| 121 | Replacement of top cone of syrup sulphiter with replacement of portion of its shell. |
| 122 | Dismantling and refitting of Juice Coils of Door Clarifier (After cleaning) |
| 123 | Replacement of any damage/worn out scrapper/rubber of DORR |
| 124 | i) Replacement of scrapper with rubber |
| 125 | ii) Replacement of rubber of scrapper |
| 126 | Replacement of worn out structure, Column etc. of Sulphur Station |
| 127 | Repalcement of Damaged Rail line /square bar bridge and trolley of cane unloader |
| 128 | Repalcement of Damaged Rail line |
| 129 | Repalcement of Damaged square bar |
| 130 | Patching work at any vassele/tanks etc. |
| 131 | Replacement of wornout arms of crystallizer |
| 132 | Repairing and Strengthening of final molasses line support column. |
| 133 | Replacement of down take pipe inside of evaporator body |
| 134 | Replacement of worn out columns of vacuum filter. |
| 135 | Dismantling , Erection fitting of Primery coolers of Sulphur Furnace. |
| 136 | Dismantling, Erecting fitting of secondary coolers of sulphur furnace. |
| 137 | Dismantling, fabrication & Erection of Wet Scrubber shell with demister, Top & Bottom cone & perforated jacket etc. |
| 138 | Dismantling & Erection of flow Meters |
| 139 | Erection fitting of flow meter. |
| 140 | Repair/Replacement of Building Column |
| 141 | Dismantling Fabrication and Erection of Juice coils of Quad body. |
| 142 | Dismentaling of old sulphur furnace with melter receiver and after burner etc. and fabrication and erection of new sulphur furnace complete erection fitting of melter receiver and after burner etc. |
| 143 | Fabrication & erection ladder inside of evaporator bodies |
| 144 | Dismentaling, Fabrication & erection evaporator bodies umbrella sports |
| 145 | Repairing and strengthening of worn out Roof trusses. Members and bracing. |
| 146 | Replacement/strengthening of worn out loading beam of quad body no. 5. |
| 147 | Replacement of worn out half shell and provided ribs of A vaccum crystalizer. |
| 148 | Dismentaling of bottom soucer and refiting of bottom soucer after retubing of calendria of evaporator body. |
| 149 | Replacement/strengthening of worn out structure beam and channel etc. of contious centrifugal machine. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 18, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 03, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysAug 03, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender