Tender For Special Repairs And Maintenance Of Lighthouse Tower And Reconstruction Of Powerhouse Building At Thangassery Point Lighthouse.
Tender Value
86.15 Lakhs
Estimated cost
Bid Submission
11 Aug 2026
19 days left
EMD
1.72 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kollam → Kerala
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Special Repairs And Maintenance Of Lighthouse Tower And Reconstruction Of Powerhouse Building At Thangassery Point Lighthouse.
BOQ
| Sl. No. | Item Description |
| 1 | PART -A- POWER HOUSE BUILDING - Dismantling doors, windows and clerestory windows (steel or wood) shutter (Of area 3 sq. metres and below) including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead including cost of all material, labour, tools & plants etc complete. |
| 2 | Taking out existing wooden door / window shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as required, all complete as per the direction of the Engineer-in-charge.etc cost of all materials labour, tools and plants etc complete as directed. |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.etc cost of all materials labour, tools and plants etc complete as directed. |
| 4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge in cement mortar etc cost of all materials labour, tools and plants,scaffolding etc complete as directed. |
| 5 | Earth work in excavation in all kind of soil by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering CC 1:4:8, (1 Cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) etc cost of all materials labour, tools and plants etc complete as directed. |
| 7 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) etc cost of all materials labour, tools and plants etc complete as directed. |
| 8 | Reinforced cement concrete of grade 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, plinth and string courses, fillets, columns, pillars, staircases and spiral stair cases above plinth level up to floor five level excluding the cost of finishing and reinforcement but including supply of all materials, labour, tools & plants, centering & shuttering,scaffolding etc complete as directed. |
| 9 | Steel reinforcement for RCC work bend tied and placed in position with Thermo-Mechanically Treated (TMT) bars of grade Fe-500D or more conforming to relavent ISI specifications inluding supply of all binding wire etc cost of all materials labour, tools and plants,scaffolding etc complete as directed. |
| 10 | Brick work with common burnt clay selected F.P.S. (non modular) bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10 mm wide 12 mm deep complete in cement mortar 1:6 (1 cement : 6 coarse sand) from ground level upto floor V level etc. including cost of all materials labour, tools and plants,scaffolding etc complete as directed. |
| 11 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length etc. including cost of all materials, labour, tools and plants etc. complete as directed. (Second class Teak wood) |
| 12 | Providing and fixing panelled or panelled and glazed shutters for doors ,windows and clerestory windows, including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws,excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge etc. including cost of all materials labour, tools and plants etc complete as directed. (Second class teak wood - 30 mm thick shutters) |
| 13 | Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters. 25 mm thick (for cupboard) including ISI marked nickel plated bright finished M.S. Piano hinges IS : 3818 marked with necessary screws |
| 14 | Providing and fixing panelled or panelled and glazed shutters for doors ,windows and clerestory windows, including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws,excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge etc. including cost of all materials labour, tools and plants etc complete as directed. (Second class teak wood - 30 mm thick shutters) |
| 15 | Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick : Float glass panes- 4 mm thick glass pane weight not less than 10 kg per sqm) etc. including cost of all materials labour, tools and plants etc complete as directed. |
| 16 | Dismatling and removing the tile work up to lintel level of the building For thickness of tiles 10 mm to 25 mm etc cost of all materials labour, tools and plants etc complete as directed. |
| 17 | Hacking of CC flooring of building including cleaning for surface etc. complete as per direction of the Engineer-in-Charge etc. Including cost of all materials labour, tools and plants etc complete as directed. |
| 18 | 15 mm cement plaster of mix : 1:2 (1 cement: 2 P Sand) on rough side of single or half brick wall etc including cost of all materials labour, tools and plants,scafolding etc complete as directed. |
| 19 | Providing and laying vitrified floor tiles in different sizes (10 mm thick) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete. |
| 20 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. |
| 21 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc - 20 mm CPVC nominal outer dia Pipes |
| 22 | 32 mm CPVC nominal outer dia Pipes |
| 23 | 50 mm CPVC nominal inner dia Pipes (External work - includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete) |
| 24 | Providing and fixing on wall face 110 mm diameter unplasticised Rigid PVC pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. |
| 25 | Providing and fixing C.P. brass stop cock (concealed) of standard design and of approved make conforming to IS:8931.- 15 mm nominal bore, including cost of all materials, labour, tools & plants etc complete. |
| 26 | Providing and fixing 20mm brass bib cock of approved quality : including cost of all materials, labour, tools & plants etc complete. |
| 27 | Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931- 15mm nominal bore, including cost of all materials, labour, tools & plants etc complete. |
| 28 | Providing and fixing PTMT Bottle Trap for Wash basin and sink.- Bottle trap 38 mm single piece moulded with height of 270 mm, effective length of tail pipe 260 mm from the centre of the waste coupling, 77 mm breadth with 25 mm minimum water seal, weighing not less than 263 gms including cost of all materials, labour, tools & plants etc complete. |
| 29 | Providing and fixing trap (100 mm inlet and 75 mm outlet- Hubless centrifugally cast (spun) iron epoxy coated inside & outside as per IS:15905) of self cleansing design with screwed down or hinged grating with or without vent arm complete, including cost of cutting and making good the walls and floors: including cost of all materials, labour, tools & plants etc complete. |
| 30 | Providing and fixing PTMT towel rail (600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 gms) complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour , including cost of all materials, labour, tools & plants etc complete. |
| 31 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :- 25 mm nominal bore, including cost of all materials, labour, tools & plants etc complete. |
| 32 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :- 50 mm nominal bore, including cost of all materials, labour, tools & plants etc complete. |
| 33 | Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Flat back wash basin size 550x400 mm with single 15 mm C.P. brass pillar tap, including cost of all materials, labour, tools & plants etc complete. |
| 34 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I.brackets,40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required (W.C. pan with ISI marked white solid plastic seat and lid) |
| 35 | Providing and fixing C.P. brass Health faucet with connecting pipe etc complete with 15 or 20 mm inlet :including cost of all materials, labour, tools and plants etc complete as directed. |
| 36 | Providing and fixing 150 mm diameter C.P. brass shower rose with 15 or 20 mm inlet with C.P. Brass extension nipple (size 15mm x 50mm) including arm of approved make and quality including cost of all materials, labour, tools & plants etc complete as per direction of Engineer-in-charge. |
| 37 | Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete, including cost of all materials, labour, tools & plants etc complete. |
| 38 | Providing and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of cross-section 90 mm x 45 mm having single rebate of 32 mm x 15 mm to receive shutter of 30 mm thickness .The laminate shall be moulded with fire resistant grade unsaturated polyester resin and chopped mat . Door frame laminate shall be 2 mm thick and shall be filled with suitable wooden block in all the three legs. The frame shall be covered with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady the frame. |
| 39 | Providing and fixing 30 mm thick Glass Fibre Reinforced Plastic (FRP) panelled door shutter of required colour and approved brand and manufacture, made with fire - retardant grade unsaturated polyester resin, moulded to 3 mm thick FRP laminate for forming hollow rails and styles, with wooden frame and suitable blocks of seasoned wood inside at required places for fixing of fittings, cast monolithically with 5 mm thick FRP laminate for panels conforming to IS: 14856, including fixing to frames. |
| 40 | Providing & fixing fly proof shutter made with 2nd class teak wood beading 62X19 mm thick frame and fly proof galvanized M.S. wire gauge to doors, windows and clerestory windows using wire gauge with average width of aperture 1.4 mm in both directions with wire of dia 0.63 mm fixing with butt hinges of required size with necessary screws etc. all complete including cost of all materials, labour, tools & plants etc complete. |
| 41 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. |
| 42 | Wall painting (2 coats) with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour over a coat of water thinnable cement primer on wall surface having VOC content less than 50 grams/litre, including cost of all materials, labour, tools & plants etc complete. |
| 43 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm), to the exterior wall surface, including cost of all materials, labour, tools & plants etc complete. |
| 44 | Painting with (2 Coats) synthetic enamel paint of approved brand and manufacture of required colour to give an even shade on new work over a coat of ready mixed pink or grey primer on wood work (hard and soft wood) having VOC content less than 50 grams/litre, including cost of all materials, labour, tools & plants etc complete. |
| 45 | Providing and fixing ready made HDPVC 10 to 15 fush per day septic tank and soak pit of reputed manufacturer of approved quality including providing necessay inlet and out let connection ,water connection with long boady piller tap etc as directed,supply of all labour , tools & plants etc compler as directed. |
| 46 | Constructing soak pit 1.20x1.20x1.20 m filled with brickbats including S.W. drain pipe 100 mm diameter and 1.20 m long complete as per standard design, including cost of all materials, labour, tools & plants etc complete. |
| 47 | Supplying chemical emulsion in sealed containers including delivery as specified- Chlorpyriphos/ Lindane emulsifiable concentrate of 20% etc complete as directed. |
| 48 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion): Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete: With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration, supply of all materials, labour , tools & plants etc complete as directed. |
| 49 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion): Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration, supply of all materials, labour , tools & plants etc complete as directed. |
| 50 | Plinth protection to the building 50mm thick out of cement concrete 1:3:6 over 75mm thick of brick batllast of 40mm size we consolidated including necessary excavation, including cost of all materials, labour, tools & plants etc complete. |
| 51 | Providing drip moulding 50mm wide plaster drip course/ groove in plastered surface or moulding to R.C.C. projections such as chajja, slab projections as and wherever directed with cement mortar 1:2 (1 cement: 2 coarse sand) including supply of all labours, tools, materials etc complete as directed by the engineer in charge, including cost of all materials, labour, tools & plants etc complete. |
| 52 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required - In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete including cost of all materials, labour, tools & plants etc complete. |
| 53 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, for all leads including all lifts involved. |
| 54 | Providing and fixing nickel plated M.S. pipe curtain rods with nickel plated brackets : 20 mm dia (heavy type)etc complete, supply of all materials, labour and tools etc., complete. |
| 55 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including supply of all materials, labour, tools & plants, scaffolding etc. complete |
| 56 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, including supply of all materials, labour, tools & plants etc. complete |
| 57 | Providing & fixing at all heights, levels and locations Mill finish Aluminium alloy roofing sheets of alloy IS designation 31500, temper Hx8 conforming to IS 737 and dimensions as per IS code 2676 with characteristics of good formability and corrosion resistance. Theprofile sheets shall be fixed to truss members in slope or requiredpitch or curvature with Hex cap headed self drilling/tapping Stainlesssteel screws M6, 50 mm long with 3 mm EPDM seal washer etc. allinclusive of labour, scaffolding, T&P and sundries etc. complete as per directions of the Engineer-In-Charge. (Cost of truss/frame workshall be paid separately).0.91mm Aluminium profile with center to center pitch of 175 mm, depth of 46mm, top crest width of 41mm, bottom valley width of 80mm, overall profile width of 1144mm, cover width 1050mm.including supply of all materials, labour, tools & plants, scaffolding etc. complete. |
| 58 | Recovery of salvage value / scrap value of recovered materials at the time of dismantling of the above said structure including cost of transport from the site but excluding the cost of dismantling, labours, tools, materials etc, including cost of all materials, labour, tools & plants etc complete.- Wooden Doors |
| 59 | Wooden windows |
| 60 | Wooden Cupboard shutter |
| 61 | RCC (Steel) |
| 62 | PART - B - LIGHTHOUSE TOWER - Dismantling doors, windows and clerestory windows (steel or wood) shutter (Of area 3 sq. metres and below) including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead including cost of all material, labour, tools & plants etc complete. |
| 63 | Taking out existing wooden door shutter, repair by cutting, painting etc. and refixing of repaired door shutters to existing door frames, including replacement of hinges with screws, etc. as required, all complete as per the direction of the Engineer-in-charge. |
| 64 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding.(Including all safety gears and Insurance). |
| 65 | Dismantling old plaster or skirting raking out joints and cleaning the surface with wire brush for plaster including disposal of rubbish to the dumping ground within 50 metres lead including cost of all materials, labour,tools & plants, scaffolding etc complete at all heights. |
| 66 | Providing, erecting, maintaining and removing temporary protective screens (Wooven PVC cloth) made out of specified fabric with all necessary fixing arrangement to ensure that it remains in position for the work duration as required by the Engineer-in-charge including cost of all materials, scaffolding etc complete at all heights. |
| 67 | Cleaning of exposed concrete/ masonry surface of sticking material including loose and foreign material by sand blasting with coarse sand followed by and including cleaning with oil free air blast as per direction of Engineer in charge, including cost of all materials, labour,tools & plants, scaffolding etc complete at all heights. |
| 68 | Providing and injecting approved grout {Stirrer mixed SBR Polymer (of approved make- SikaCem®-130 Intraplast or equivalent) modified Cement slurry made with Shrinkage Compensating Cement in concrete/ RCC work} in proportion recommended by the manufacturer into cracks/honey-comb area of concrete/ masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-in- Charge - , including cost of all materials, labour, tools & plants, equipments, scaffolding etc complete at all heights as directed. |
| 69 | Providing, mixing and applying bonding coat of approved adhesive (such as Fosroc Nitobond AR std, Fosroic Nitobond SBR Latex, Sika Hibond) on chipped portion of RCC/ masonry as per specifications and direction of Engineer-In-charge complete in all respect. - SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer including cost of all materials, labour,tools & plants, scaffolding etc complete at all heights. |
| 70 | 20 mm cement plaster 1:2 (1 cement : 2 stone dust) in two coats on the rough side of tower wall surface with mixing of approved waterproofing compound similar to Sika Cim and superplasticizer as per manufacturers specifications including cost of all materials, labours, tools & plants, scaffolding, curing by fine fog spray of water etc complete at all heights.(Including all safety gears and Insurance). |
| 71 | Supply and installation of fibre glass mesh with a grid size of 5 x 5 mm and a weight not less than 145 GSM of an approved make. The mesh shall be resistant to alkali and acid, with a tensile strength of at least 1500 N/50 mm in both warp and weft directions. It should offer thermal resistance up to 500°C, have an emulsion content of 14 ± 5%, and a moisture content of ≤ 0.6%. The work shall be carried out at all heights, including the cost of materials, labor, tools, equipment, and scaffolding, as directed by the Engineer-In-Charge. |
| 72 | Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, complete in all respect as per the direction of Engineer-in-Charge, including cost of all materials, scaffolding, curing etc complete at all heights. |
| 73 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead : 10 to 25 mm including cost of all materials, labour,tools & plants, scaffolding etc complete at all heights. |
| 74 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length .second class Teak wood, including cost of all materials, labour,tools & plants, scaffolding etc complete at all heights. |
| 75 | Providing and fixing panelled or panelled and glazed shutters for doors ,windows and clerestory windows, including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws,excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge 35 mm thick shuttersincluding cost of all materials, labour,tools & plants, scaffolding etc complete at all heights. |
| 76 | Water proofing treatment of Vertical joints (of external side and internal side) between door, window & ventilator frames (on all four sides) of outer wall over the Zycosil/equivalent & Zycoprime/equivalent solution already applied (door / window / ventilator frames) and fine finish with Grout RW/equivalent including supply of all materials, tools & plants, labour etc. complete as directed by Engineer-In-Charge. |
| 77 | Providing & fixing in position Phenol bonded Bamboo wood wall cladding at all height with planks of sizes 10 mm thick, minimum 1800 mm length and minimum 100 mm wide, in approved colour, texture and finish, having Performance Appraisal Certificate (PAC) issued by Building Materials & Technology Promotion Council (BMTPC), with necesasary profiled edges fixed with 40 mm SS screws 5 nos in each tile to frame work made of second class teak wood of size 20x15 mm in centre of each tile and bottom and top of work height, 40x15 mm placed at ends of each tile. The cladding shall be laid over backlayment of 1.00 mm thick expanded polyethylene foam of density 40 kg/cum in two layers, first layer on wall surface before fixing wooden frame and second layer on frame under cladding. The bamboo wood planks shall have minimum density of 1000 Kg/cum & minimum Hardness 1000 Kgf. with Eco friendly UV coating, all complete as per direction of the Engineer in-charge. |
| 78 | Providing and fixing wooden moulded corner beading of triangular shape to the junction of panelling etc. with iron screws, plugs and priming coat on unexposed surface etc. complete 2nd class teak wood.- 50x50 mm (base and height),including cost of all materials, labour,tools & plants, scaffolding etc complete at all heights. |
| 79 | Supplying chemical emulsion in sealed containers including delivery as specified- Chlorpyriphos/ Lindane emulsifiable concentrate of 20% etc complete as directed. |
| 80 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion): Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres / sqm of the vertical surface of the substructure to a depth of 300mm including excavation channel along the wall & rodding etc. complete: With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration, supply of all materials, labour , tools & plants etc complete as directed. |
| 81 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion): Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20% with 1% concentration, supply of all materials, labour , tools & plants etc complete as directed. |
| 82 | Replacing the damaged lantern room GI door with GI steel shutter to match with the existing curvature and pattern including dismantling and removing the old damages GI door without damaging the latern, fabricating the GI door, fixing the same in position in line and level etc complete including painting with two coats of epoxy paint over a coat of epoxy primer, including cost of all materials, labour,tools & plants, scaffolding etc complete at all heights. |
| 83 | Replacing the damaged / deteriorated portion of the service room bottom / supporting steel girder (I section) to match with the existing section of structure, including cutting and removing the damaged portion of the girder with out damaging the existing floor / structure carefully, after giving necessary props / supports, fixing the new steel section in position including necessary anchoring / concrete in wall, plastering and finishing, welding, grinding, etc complete as directed, including painting with two coats of epoxy paint over a coat of epoxy primer, cost of all materials, scaffolding, curing etc complete at all heights. |
| 84 | Wall painting (Two coats) with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. |
| 85 | Finishing walls with ready mixed Premium acrylic emulsion paint (Company Depot Tinted) having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade with silicon additives. New work (Two or more coats applied @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @0.90 litre/10 sqm. |
| 86 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: Two coats on wood/ steel including cost of all materials, labour, tools & plants etc complete to the stair case handrailing etc of the Lighthouse tower |
| 87 | French spirit polishing: Two or more coats on new works including a coat of wood filler including cost of all materials, labour, tools & plants etc complete |
| 88 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 89 | Recovery of salvage value / scrap value of recovered materials at the time of dismantling of the above said structure including cost of transport from the site but excluding the cost of dismantling, labours, tools, materials etc, including cost of all materials, labour, tools & plants etc complete.- LH tower window |
| 90 | Side window |
| 91 | Lantern room GI door Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Jul 17, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 11, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysAug 12, 2026
Bid Opening Date
Technical bids will be opened and evaluated.