Tender For Shifting Of (A) 03 Nos Of Haulage With Motor, Bed Plate And Rope (B) Switches, Starter And Cables And (C) Trans Switch Unit From Bb18(A) Panel To Bb19 (A) Panel To Maintain Production Of Mines Of Siduli Colliery.
Tender Overview
Project Description
Tender for Shifting Of (A) 03 Nos Of Haulage With Motor, Bed Plate And Rope (B) Switches, Starter And Cables And (C) Trans Switch Unit From Bb18(A) Panel To Bb19 (A) Panel To Maintain Production Of Mines Of Siduli Colliery.
BOQ
| Sl. No. | Item Description |
| 1 | Item Description/ Heading |
| 2 | PART A: Shifting of Switches, Starter and Cables |
| 3 | Loading of switches, starters on to coal tub trolley for transporting (3 nos each) |
| 4 | Manually coiling of 70 sqmm and 50 sqmm cable (300 mtr) |
| 5 | Loading of coiled cable on to trolley |
| 6 | Manually transporting switches, starters cable from BB18(A) to BB19 (A) panel |
| 7 | Unloading of switches and starters from coal tub trolley for placement |
| 8 | Unloading of cable from coal tub trolley for laying |
| 9 | Unloading and laying of cable 70 sqmm and 40 sqmm 300mtr |
| 10 | PART B: Shifting of 03 Nos of Haulage with Motor, Bed Plate and Rope |
| 11 | Dismantling of 40HP haulage drum along with motor (3nos) |
| 12 | Loading of 3 nos haulage along with bedplate and motor on to coal tub trolley |
| 13 | Transporting of 3nos haulage along with bedplate from BB18(A) panel to BB19(A) panel |
| 14 | Unloading of 3nos haulages along with bed plate and motor |
| 15 | Placing of bed plate along with haulages and motor |
| 16 | Coiling of 22mm rope for transportation (1000 meters) |
| 17 | Loading and transporting 22mm rope (1000 meters) from BB18(A) panel to BB19(A) panel |
| 18 | Unloading of 22mm rope along with uncoiling the same |
| 19 | PART C: Shifting of Trans Switch Unit (TSU) |
| 20 | Dismantling of complete sub-station equipments which includes 3.3 KV primary switch, 315KVA, 3.3KV/550V TSU with accessories 550V secondary switch, cables etc |
| 21 | Loading of each equipments on trolley transporting to new site and unloading there including colling and loading of cable |
| 22 | Re-installation of all the switches and TSU on proper places |
| 23 | Laying of cables in proper place and jointing |
| 24 | Fencing of sub-station by fixing sleepers and haulage rope including uncoiling of haulage rope |
| 25 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
TodayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender